Law of the Democratic People's Republic of Korea on National Economic Planning
Edition dated 29 September 2021. August 2024 NIS compilation, vol. 1, pp. 791–801
Adopted on 9 April Juche 88 (1999) by Ordinance No. 2 of the Supreme People’s Assembly
Amended and supplemented on 17 May Juche 90 (2001) by Decree No. 2314 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 4 August Juche 98 (2009) by Decree No. 206 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 6 April Juche 99 (2010) by Decree No. 748 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 25 June Juche 104 (2015) by Decree No. 553 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 29 September Juche 110 (2021) by Ordinance No. 12 of the Supreme People’s Assembly
Source · Republic of Korea National Intelligence Service, Compilation of North Korean Laws (북한법령집), August 2024, vol. 1, pp. 791–801.
The first draft of this translation was produced with AI assistance.
Chapter 1. Fundamentals of the Law on National Economic Planning
Section titled “Chapter 1. Fundamentals of the Law on National Economic Planning”Article 1 (Mission of the Law on National Economic Planning)
Section titled “Article 1 (Mission of the Law on National Economic Planning)”The national economic plan is the Party’s instruction that scientifically foresaw economic development, and the State’s law.
The Law of the Democratic People’s Republic of Korea on National Economic Planning contributes to managing and developing the national economy in a planned way by strictly establishing the system and order in the drawing up and handing down, the fulfilment and the review of the national economic plan.
Article 2 (Definition of terms)
Section titled “Article 2 (Definition of terms)”In this Law:
-
“National economic planning” means the important economic organizing function and activity of the socialist State of formulating the national economic plan and organizing and guiding its fulfilment.
National economic planning work includes the drawing up and handing down of plans, the organization and guidance of plan fulfilment, review and the like.
-
“State planning organ” means an organ that specializes in undertaking and carrying out national economic planning work.
State planning organs include the central planning guidance organ and local planning organs.
Article 3 (Principle of planned and balanced development of the national economy)
Section titled “Article 3 (Principle of planned and balanced development of the national economy)”The economy of the Democratic People’s Republic of Korea is an independent economy and a planned economy based on socialist ownership of the means of production, and an economy that serves the people.
The State shall develop the national economy in a planned and balanced way, embodying the spirit of self-reliance, so that the material and technical foundation of the independent economy is firmly consolidated and the people’s living is stabilized and improved.
Article 4 (Principle of carrying through the mass line in national economic planning work)
Section titled “Article 4 (Principle of carrying through the mass line in national economic planning work)”Formulating the national economic plan through discussion with the producer masses and making the drawn-up plan the producer masses’ own is an important principle of national economic planning work.
The State shall ensure that the zeal and creative initiative of the producer masses are brought into full play by thoroughly carrying through the mass line in national economic planning work.
Article 5 (Fundamental principle of drawing up the national economic plan)
Section titled “Article 5 (Fundamental principle of drawing up the national economic plan)”Properly formulating the national economic plan is the fundamental condition for developing the national economy in a planned and balanced way.
The State shall, basing itself on the line and policy of the Party and taking correct account of the laws of the socialist economy and the actual conditions, formulate a national economic plan in which scientific character, realism and mobilizing character are ensured, and ensure that practical benefit is gained in economic work.
Article 6 (Principle of unification under a single system and detailing of the national economic plan)
Section titled “Article 6 (Principle of unification under a single system and detailing of the national economic plan)”The unification under a single system and the detailing of the national economic plan are the system and method of socialist economic planning.
The State shall establish the planning system for the national economy in good order, ensure the uniqueness of planning, and innovate planning methods so that the plan is dovetailed in detail.
Article 7 (Principle of strengthening national economic plan discipline)
Section titled “Article 7 (Principle of strengthening national economic plan discipline)”Strengthening national economic plan discipline is the guarantee for successfully fulfilling the national economic plan.
The State shall ensure that the legal and instructional character of the national economic plan is adhered to and that strong discipline of regularly keeping track of the fulfilment of the national economic plan and strictly reviewing it is established.
Article 8 (Principle of modernization, informatization and scientification of the national economic plan)
Section titled “Article 8 (Principle of modernization, informatization and scientification of the national economic plan)”The State shall ensure that national economic planning work is modernized, that information technology is introduced into it and that it is put on a scientific basis, by firmly building up the material and technical foundation of the planning sector.
Article 9 (Scope of application of the Law)
Section titled “Article 9 (Scope of application of the Law)”This Law applies to institutions, enterprises and organizations that formulate and fulfil the national economic plan.
Chapter 2. Drawing up and handing down of the national economic plan
Section titled “Chapter 2. Drawing up and handing down of the national economic plan”Article 10 (Basic requirements for drawing up the national economic plan)
Section titled “Article 10 (Basic requirements for drawing up the national economic plan)”In drawing up the national economic plan, the following requirements shall be observed:
- It shall be formulated on the basis of a scientific assessment of the objective conditions of economic work, production possibilities and potential.
- It shall be formulated so as to be guaranteed and enforceable, by keeping track of and assessing production capacity by national economy sector, by enterprise and by indicator, and reflecting the actual conditions of the unit concerned and the requirements of economic development.
- It shall be formulated in a mobilizing way so that internal reserves can be used as effectively as possible.
- It shall be formulated innovatively, by strengthening productive ties and cooperation between economic sectors and between enterprise bodies and clearly distinguishing priorities on the principle of concentrating efforts on the central link of economic development.
- It shall be formulated so that the balance between demand and supply can be accurately guaranteed not only in physical quantity terms but also in value terms.
- It shall be formulated so as to actively adopt the achievements of science and technology and achieve the integration of science and technology with production.
- It shall be formulated so as to raise economic effectiveness and ensure practical benefit.
- It shall be formulated so as to overhaul and reinforce existing production capacity and actively promote the domestic production of raw and other materials and recycling.
- It shall be formulated by specifying the share that the State is to provide and the share that the enterprise is to cover by itself.
Article 11 (Long-term plan and current plan)
Section titled “Article 11 (Long-term plan and current plan)”The national economic plan shall be divided into the long-term plan and the current plan.
The long-term plan shall be formulated by prescribing such matters as the direction of economic development, the overall goals and the basic tasks.
The current plan shall be formulated by year on the basis of the long-term plan.
Article 12 (Organization of national economic plan drawing-up work)
Section titled “Article 12 (Organization of national economic plan drawing-up work)”The drawing up of the national economic plan is the first stage of economic work.
State planning organs and institutions, enterprises and organizations shall prepare a written organizational plan for drawing up the national economic plan and organize plan drawing-up work accordingly.
Article 13 (Establishment of plan standards)
Section titled “Article 13 (Establishment of plan standards)”Institutions, enterprises and organizations shall scientifically establish plan standards, such as labour norms, supplies consumption standards and funds expenditure standards, needed for drawing up the national economic plan, and register them with the relevant institution.
Article 14 (Basic data for drawing up the national economic plan)
Section titled “Article 14 (Basic data for drawing up the national economic plan)”State planning organs and institutions, enterprises and organizations shall prepare basic data, such as plan standards, the actual state of production and management, trends in science and technology and in economic development, the state of natural resources and the size of the population, for drawing up the national economic plan.
Statistical organs, finance organs, banking organs, labour administration organs, price organs and the relevant institutions shall send in good time the basic data required by the State planning organ for drawing up the national economic plan.
The national economic plan may not be drawn up without preparing basic data.
Article 15 (Building of the planning information database)
Section titled “Article 15 (Building of the planning information database)”The State planning organ shall adopt modern information technology means, build a planning information database and use it in planning work.
Article 16 (Registration of national economic plan indicators)
Section titled “Article 16 (Registration of national economic plan indicators)”The national economic plan shall be formulated according to the indicators registered with the central planning guidance organ.
Institutions, enterprises and organizations that intend to plan a new indicator shall register it with the central planning guidance organ through the higher-level organ or the relevant local planning organ, in keeping with the planning unit and the apportionment of indicators.
Article 17 (Indicators that may not be included in the national economic plan)
Section titled “Article 17 (Indicators that may not be included in the national economic plan)”Indicators for which labour, equipment, materials and funds have not been dovetailed or which have not undergone scientific and technological deliberation, indicators without an approved design document and the like may not be included in the national economic plan.
Article 18 (Apportionment of national economic plan indicators)
Section titled “Article 18 (Apportionment of national economic plan indicators)”The central planning guidance organ shall rationally apportion national economic plan indicators among institutions, enterprises and organizations. In this case, on the principle of correctly combining the creative initiative of localities and of institutions, enterprises and organizations while giving priority to State interests, indicators of State significance and important indicators that the State must take firm hold of shall be apportioned as central indicators, and other indicators as local indicators and enterprise indicators.
Article 19 (Determination of the enterprise share)
Section titled “Article 19 (Determination of the enterprise share)”The central planning guidance organ shall rationally determine the enterprise share corresponding to each indicator, so that the business activities of enterprise bodies can be guaranteed financially.
Article 20 (Dovetailing the national economic plan)
Section titled “Article 20 (Dovetailing the national economic plan)”The national economic plan shall be formulated in such a way that institutions, enterprises and organizations dovetail the demand and the sources of the apportioned indicators. In this case, the national economic plan may also be dovetailed by means of order contracts.
Article 21 (Drawing up of preliminary figures)
Section titled “Article 21 (Drawing up of preliminary figures)”The drawing up of the national economic plan begins with compiling preliminary figures.
Institutions, enterprises and organizations shall draw up preliminary figures and submit them to the State planning organ in accordance with the prescribed procedure.
Article 22 (Drawing up of control figures)
Section titled “Article 22 (Drawing up of control figures)”The State planning organ shall examine the preliminary figures, take full account of State requirements and the feasibility of supplying raw and other materials and the like, draw up control figures, and then send them down to institutions, enterprises and organizations.
Article 23 (Mass discussion)
Section titled “Article 23 (Mass discussion)”State planning organs and institutions, enterprises and organizations shall prepare a proposal for mass discussion for drawing up the draft national economic plan and hold mass discussions accordingly.
With regard to important indicators, the share to be provided by the State and the share to be provided by themselves shall be calculated and submitted at the mass discussion stage.
Article 24 (Drawing up of the draft national economic plan)
Section titled “Article 24 (Drawing up of the draft national economic plan)”Institutions, enterprises and organizations shall, on the principle of meeting the control figures, draw up the draft national economic plan and submit it to the State planning organ in accordance with the prescribed procedure.
The central planning guidance organ shall carefully examine the submitted drafts of the national economic plan, draw up the State’s draft national economic plan and submit it to the Cabinet.
Article 25 (Submission of the national economic plan for deliberation)
Section titled “Article 25 (Submission of the national economic plan for deliberation)”The Cabinet and local people’s committees shall submit the drawn-up draft national economic plan for deliberation by the Supreme People’s Assembly or the local people’s assembly. In this case, it shall be discussed in the Cabinet and the relevant people’s committee.
Article 26 (Deliberation and approval of the national economic plan)
Section titled “Article 26 (Deliberation and approval of the national economic plan)”The State’s national economic plan shall be deliberated on and approved by the Supreme People’s Assembly, and local national economic plans by the local people’s assembly.
The State’s national economic plan and its adjustment proposal submitted during a recess of the Supreme People’s Assembly owing to unavoidable circumstances shall be deliberated on and approved by the Standing Committee of the Supreme People’s Assembly, and a local national economic plan submitted during a recess of the local people’s assembly by the relevant people’s committee.
Article 27 (Handing down of the national economic plan)
Section titled “Article 27 (Handing down of the national economic plan)”The State planning organ shall specify the approved national economic plan by period and by indicator and send it down to institutions, enterprises and organizations in good time.
Institutions, enterprises and organizations shall specify the national economic plan handed down to them down to the details.
Article 28 (Prohibition of changing the national economic plan)
Section titled “Article 28 (Prohibition of changing the national economic plan)”A national economic plan that has been deliberated on and approved may not be changed in principle.
Institutions, enterprises and organizations that intend to change the plan within the scope of the handed-down national economic plan owing to unavoidable circumstances shall obtain the approval of the Cabinet, the State planning organ or the higher-level organ within the period prescribed according to the apportionment of indicators.
Article 29 (Registration of the national economic plan)
Section titled “Article 29 (Registration of the national economic plan)”Institutions, enterprises and organizations shall register the handed-down national economic plan with the relevant institution in good time.
Labour, equipment, materials and funds may not be received without registering the national economic plan.
Article 30 (Collation of the national economic plan)
Section titled “Article 30 (Collation of the national economic plan)”State planning organs and institutions, enterprises and organizations shall carry out national economic plan collation work. In this case, they shall keep themselves informed of the handing down of the national economic plan, correct shortcomings and take steps to mobilize reserves.
Chapter 3. Fulfilment of the national economic plan
Section titled “Chapter 3. Fulfilment of the national economic plan”Article 31 (Basic requirements for fulfilling the national economic plan)
Section titled “Article 31 (Basic requirements for fulfilling the national economic plan)”The national economic plan is a legal task, and accurately fulfilling it is mandatory for institutions, enterprises and organizations.
Institutions, enterprises and organizations shall properly conduct operations and command for fulfilling the national economic plan, normalize production, and fulfil the national economic plan without fail by day, by month, by quarter and by indicator.
Article 32 (Duty to inform of the national economic plan and the ways of fulfilling it)
Section titled “Article 32 (Duty to inform of the national economic plan and the ways of fulfilling it)”Those directly in charge of fulfilling the national economic plan are the producer masses.
Institutions, enterprises and organizations shall inform the producers of the national economic plan and the ways of fulfilling it in good time.
Article 33 (Conclusion of contracts)
Section titled “Article 33 (Conclusion of contracts)”Institutions, enterprises and organizations shall duly conclude and perform contracts.
Contracts based on the plan shall be concluded within the prescribed period from the time the national economic plan is handed down, and order contracts may be concluded at any time during the year.
Article 34 (Division of the national economic plan by month)
Section titled “Article 34 (Division of the national economic plan by month)”The relevant institution shall divide the national economic plan by month every quarter and send it down to enterprises and organizations.
The division by month shall be made within the scope of the quarterly national economic plan.
Article 35 (Organization of work for fulfilling the national economic plan)
Section titled “Article 35 (Organization of work for fulfilling the national economic plan)”Institutions, enterprises and organizations shall draw up a concrete plan for successfully fulfilling the national economic plan and thoroughly organize the work.
Article 36 (Preparation for fulfilling the national economic plan)
Section titled “Article 36 (Preparation for fulfilling the national economic plan)”Institutions, enterprises and organizations shall carry out in advance production preparations and technical preparations for fulfilling the national economic plan, such as the training of skilled workers, the inspection and repair of equipment, the preparation of raw and other materials, the drawing up of designs and technical processes, the preparation of technical equipment, the establishment of technical regulations and standard operating methods, and the trial production of prototypes.
Article 37 (Order of priority in fulfilling the national economic plan)
Section titled “Article 37 (Order of priority in fulfilling the national economic plan)”Institutions, enterprises and organizations shall properly determine the order of priority in fulfilling the national economic plan and concentrate efforts on the central link.
Products envisaged in important projects and in the export plan shall be produced first within the fixed time limit.
Article 38 (Organization of cooperative production)
Section titled “Article 38 (Organization of cooperative production)”Institutions, enterprises and organizations shall properly organize cooperative production and produce and supply, within the prescribed time limit, the products envisaged in the cooperative production plan.
Article 39 (Provision of conditions needed for fulfilling the national economic plan)
Section titled “Article 39 (Provision of conditions needed for fulfilling the national economic plan)”Labour administration organs, materials supply organs, finance organs, banking organs, science and technology administration, guidance and management organs and the relevant institutions shall ensure the supply of the labour, equipment, materials, funds, technical data and the like needed for fulfilling the national economic plan in accordance with the plan and contracts.
Equipment and materials shall be supplied by variety, by specification and by quality of material.
Article 40 (Raising science and technology capacity)
Section titled “Article 40 (Raising science and technology capacity)”Institutions, enterprises and organizations shall firmly build up their own talent forces, achieve the integration of science and technology with production, and satisfactorily solve the scientific and technological problems arising in the normalization of production, reconstruction and modernization, the domestic production of raw and other materials, recycling and the raising of product quality.
Article 41 (Mobilization of internal reserves)
Section titled “Article 41 (Mobilization of internal reserves)”Institutions, enterprises and organizations shall actively discover internal reserves and use them rationally in fulfilling the national economic plan.
The relevant institution shall mobilize and adjust in good time the spare labour force, equipment, materials and funds of institutions, enterprises and organizations.
Article 42 (Keeping track of the fulfilment of the national economic plan)
Section titled “Article 42 (Keeping track of the fulfilment of the national economic plan)”The Cabinet and the relevant institutions shall properly establish the production command system, regularly keep track of the fulfilment of the national economic plan, and take measures for its fulfilment in good time.
Institutions, enterprises and organizations shall regularly report the status of fulfilment of the national economic plan to the higher-level organ, the State planning organ and the statistical organ.
Chapter 4. Review of fulfilment of the national economic plan
Section titled “Chapter 4. Review of fulfilment of the national economic plan”Article 43 (Basic requirements for reviewing fulfilment of the national economic plan)
Section titled “Article 43 (Basic requirements for reviewing fulfilment of the national economic plan)”Proper review of fulfilment of the national economic plan is an important way to strengthen plan discipline and accurately fulfil the national economic plan.
Institutions, enterprises and organizations shall strictly review the status of fulfilment of the national economic plan in the direction of promoting production and overcoming deviations.
Article 44 (Review cycle for fulfilment of the national economic plan)
Section titled “Article 44 (Review cycle for fulfilment of the national economic plan)”The status of fulfilment of the national economic plan shall be reviewed by month, by quarter, for the first half of the year and for the year.
Enterprises and organizations shall also review the status of fulfilment of the national economic plan by week and by ten-day period.
Article 45 (Preparation for reviewing fulfilment of the national economic plan)
Section titled “Article 45 (Preparation for reviewing fulfilment of the national economic plan)”Institutions, enterprises and organizations shall make substantive preparations for reviewing fulfilment of the national economic plan on the basis of scientific and objective statistical figures, so that the limits of responsibility can be accurately determined. In this case, they shall prepare so that data on plan fulfilment by item, such as the production plan by physical indicator, the science and technology development plan, the recycling plan, the total income plan, the profitability plan and the net income plan, can be kept track of in detail by production unit and analysed and reviewed in comparison with the plan fulfilment data of the previous plan period.
Article 46 (Preliminary review)
Section titled “Article 46 (Preliminary review)”Institutions, enterprises and organizations shall conduct a preliminary review of the fulfilment of the national economic plan before the relevant plan period ends.
The preliminary review shall be conducted by preliminarily analysing and reviewing the prospects for plan fulfilment and taking measures to fulfil the plan for the remaining period without fail.
Article 47 (Full review)
Section titled “Article 47 (Full review)”Institutions, enterprises and organizations shall conduct a full review of the fulfilment of the national economic plan after the relevant plan period has ended.
The full review shall be conducted by assessing the results of plan fulfilment in detail by item and by unit, strictly analysing and reviewing the achievements and shortcomings and the experience and lessons shown in the course of plan fulfilment, clearly determining the limits of responsibility, and finding accurate solutions for fulfilling the plan in the next period.
Article 48 (Criterion for evaluating fulfilment of the national economic plan)
Section titled “Article 48 (Criterion for evaluating fulfilment of the national economic plan)”The criterion for evaluating fulfilment of the national economic plan is the plan registered with the statistical organ.
The statistical organ shall evaluate the status of fulfilment of the national economic plan by the registered plan and the results of plan fulfilment it has kept track of, and then send the outcome to the relevant institutions, enterprises and organizations.
Article 49 (Conveying and making public the status of fulfilment of the national economic plan)
Section titled “Article 49 (Conveying and making public the status of fulfilment of the national economic plan)”Institutions, enterprises and organizations shall periodically inform employees of the status of fulfilment of the national economic plan.
The status of fulfilment of the national economic plan may be made public.
Article 50 (Exclusion of results of fulfilment of the national economic plan)
Section titled “Article 50 (Exclusion of results of fulfilment of the national economic plan)”Where products not in the national economic plan are produced, or construction or service is carried out, with labour, equipment, materials and funds dovetailed into the national economic plan, they shall not count towards the results of the national economic plan.
Article 51 (Political and material recognition)
Section titled “Article 51 (Political and material recognition)”Institutions, enterprises, organizations and individual citizens that have overfulfilled the plan according to the results of the review of fulfilment of the national economic plan shall be given appropriate political and material recognition.
Chapter 5. Guidance and control of national economic planning work
Section titled “Chapter 5. Guidance and control of national economic planning work”Article 52 (Basic requirements for guidance and control of national economic planning work)
Section titled “Article 52 (Basic requirements for guidance and control of national economic planning work)”Strengthening guidance and control of national economic planning work is the basic guarantee for thoroughly carrying through the State’s economic policy.
The State shall properly establish the guidance system for national economic planning work and strengthen control, so as to ensure that institutions, enterprises and organizations strictly observe plan discipline.
Article 53 (Guidance of national economic planning work)
Section titled “Article 53 (Guidance of national economic planning work)”Guidance of national economic planning work shall be exercised by the central planning guidance organ under the unified guidance of the Cabinet.
The central planning guidance organ shall achieve the unification under a single system and the detailing of the national economic plan and provide guidance so that the national economic plan is properly formulated and fulfilled without fail.
Article 54 (Improvement of national economic planning methods)
Section titled “Article 54 (Improvement of national economic planning methods)”The Cabinet and the State planning organ shall continuously improve national economic planning methods in keeping with the requirements of economic development.
Article 55 (Training of planning personnel)
Section titled “Article 55 (Training of planning personnel)”The relevant institution shall properly establish the system for training planning personnel and train capable planning personnel systematically and with a long-term view.
Article 56 (Supervision and control of national economic planning work)
Section titled “Article 56 (Supervision and control of national economic planning work)”Supervision and control of national economic planning work shall be exercised by the public prosecution organs and the relevant supervision and control organ.
The public prosecution organs and the relevant supervision and control organ shall strengthen legal oversight and control of the drawing up and handing down of the national economic plan, the supply of the labour, equipment, materials and funds needed for plan fulfilment, the observance of plan and contract discipline, the review of plan fulfilment and the reporting of results, and the like.
Article 57 (Acts prohibited to institutions, enterprises, organizations and citizens)
Section titled “Article 57 (Acts prohibited to institutions, enterprises, organizations and citizens)”Institutions, enterprises, organizations and citizens may not do any of the following:
- Abusing authority to practise trickery in the drawing up and handing down of the national economic plan and creating duplicity and unfairness
- Recklessly formulating and handing down the national economic plan without measures for supplying labour, funds and materials
- Forcibly fitting plan figures while claiming to ensure the balance between demand and supply
- Recklessly formulating and handing down an additional plan without approval while claiming to adjust the national economic plan already handed down
- Producing products, or carrying out construction or service, that are not in the national economic plan
- Excessively consuming or illegally disposing of the enterprise share while not producing the electric power, equipment, materials and raw materials included in the national economic plan and supplying them to end-user units
- Mobilizing labour, equipment, materials and funds dovetailed into the national economic plan for other work unrelated to plan fulfilment
- Falsely reporting the status of fulfilment of the national economic plan
- Refusing to comply with, or challenging, State national economic planning work while practising unit particularism and departmentalism
Article 58 (Civil liability)
Section titled “Article 58 (Civil liability)”Where property damage has been caused by violating this Law, civil liability such as compensation for damage, penalty for breach of contract and payment of a late payment charge shall be imposed on the party responsible.
Article 59 (Penalty of a fine)
Section titled “Article 59 (Penalty of a fine)”In the following cases, the relevant institution, enterprise or organization shall be fined 500,000 to 1,500,000 won:
- Where a contract for fulfilling the national economic plan has not been concluded in good time or has not been performed, impeding plan fulfilment
- Where cooperative production discipline has been violated, impeding the production and plan fulfilment of related units
- Where the enterprise share has been excessively consumed or illegally disposed of while not producing the electric power, equipment, materials and raw materials included in the national economic plan and supplying them to end-user units
Article 60 (Penalty of suspension)
Section titled “Article 60 (Penalty of suspension)”Where production, construction or service not in the national economic plan has been carried out, or labour, equipment, materials and funds dovetailed into the plan have been mobilized for other work unrelated to plan fulfilment, the production, construction or service concerned shall be suspended.
Article 61 (Penalties of warning, unpaid labour, labour education, demotion, dismissal and removal from post)
Section titled “Article 61 (Penalties of warning, unpaid labour, labour education, demotion, dismissal and removal from post)”In the following cases, the person responsible shall be given the penalty of warning or stern warning, or the penalty of unpaid labour or labour education of not more than three months:
- Where plan standards for drawing up the national economic plan have not been properly established and registered, or the basic data have not been properly prepared
- Where the enterprise share has not been rationally determined, impeding the normalization of production, expanded reproduction and the provision of living conditions for employees
- Where the apportioned plan indicators have not been closely dovetailed or the national economic plan has not been handed down within the prescribed period
- Where authority has been abused to practise trickery in the drawing up and handing down of the national economic plan and duplicity and unfairness have been created
- Where an additional plan has been recklessly formulated and handed down without approval while claiming to adjust the national economic plan already handed down
- Where plan figures have been forcibly fitted while claiming to ensure the balance between demand and supply, or the national economic plan has been recklessly formulated and handed down without mass discussion and without measures for supplying labour, funds and materials
- Where the national economic plan has been changed without approval
- Where the national economic plan has not been registered
- Where indicators that had not undergone scientific and technological deliberation, or indicators without an approved design document, have been included in the national economic plan
- Where production, construction or service has been carried out without a national economic plan
- Where a contract has not been properly concluded or has not been performed, impeding fulfilment of the national economic plan
- Where plan fulfilment has been impeded through failure to properly organize, command and prepare for the fulfilment of the national economic plan
- Where labour, equipment, materials, funds, technical data or the like has not been supplied in accordance with the plan and contracts, impeding fulfilment of the national economic plan
- Where, with labour, equipment, materials and funds dovetailed into the national economic plan, only products that are easy to produce and yield high income have been produced irrespective of the plan by indicator, impeding fulfilment of the basic production plan
- Where products envisaged in important projects and in the export plan have not been produced and supplied within the time limit
- Where cooperative production discipline has been violated, impeding the production and plan fulfilment of related units
- Where the national economic plan has not been met because economic organization work has not been thoroughly organized
- Where the status of fulfilment of the national economic plan has not been reported in good time or has been falsely reported
- Where the enterprise share has been excessively consumed or illegally disposed of
- Where labour, equipment, materials and funds dovetailed into the national economic plan have been mobilized for other work unrelated to plan fulfilment
- Where the status of fulfilment of the national economic plan has not been properly reviewed and evaluated
- Where institutions, enterprises, organizations and citizens that overfulfilled the national economic plan have not been given proper political and material recognition
- Where, while practising unit particularism and departmentalism, State national economic planning work has been refused compliance or challenged
Where the circumstances of an act under items 1 to 23 of the preceding paragraph are grave, the penalty of unpaid labour or labour education of not less than three months, or the penalty of demotion, dismissal or removal from post shall be given.
Article 62 (Criminal liability)
Section titled “Article 62 (Criminal liability)”Where an act in violation of this Law amounts to a crime, criminal liability shall be imposed on the person responsible in accordance with the relevant article of the Criminal Law.
English translations by NK Law are licensed under CC BY-SA 4.0.Copyright and reuse