Skip to content

Construction Design Law of the Democratic People's Republic of Korea

Edition dated 14 December 2021. August 2024 NIS compilation, vol. 2, pp. 55–64

Adopted on 14 December Juche 110 (2021) by Decree No. 806 of the Standing Committee of the Supreme People’s Assembly

Source · Republic of Korea National Intelligence Service, Compilation of North Korean Laws (북한법령집), August 2024, vol. 2, pp. 55–64.

The first draft of this translation was produced with AI assistance.

Chapter 1. Fundamentals of the Construction Design Law

Section titled “Chapter 1. Fundamentals of the Construction Design Law”

Article 1 (Mission of the Construction Design Law)

Section titled “Article 1 (Mission of the Construction Design Law)”

The Construction Design Law of the Democratic People’s Republic of Korea, by strictly establishing the system and order in drafting, deliberating on and approving construction design and raising the level of scientification of the construction design sector, contributes to building construction works to the highest standard for economic construction and the improvement of the people’s living standards.

Article 2 (Basic principles of construction design)

Section titled “Article 2 (Basic principles of construction design)”

To thoroughly embody the people-first principle, firmly uphold Juche character and correctly combine national character with modernity is the basic principle to be upheld in construction design.

The State shall ensure that, in construction design, the principles of convenience first, aesthetics first and the outlook on future generations first are embodied, and that construction works are designed non-repetitively and diversely, in conformity with the use and characteristics of the project, and in an environmentally friendly manner so that local characteristics come alive.

Article 3 (Making architecture political and policy-based)

Section titled “Article 3 (Making architecture political and policy-based)”

To make architecture political and policy-based is the consistent policy of Juche architecture.

The State shall ensure that our-ideology-first principle, our-system-first principle, our-Party-first principle and our-nation-first principle are visually embodied in architecture.

Article 4 (Principle of ensuring practical benefit)

Section titled “Article 4 (Principle of ensuring practical benefit)”

The State shall ensure minimum expenditure and maximum practical benefit in construction by designing all construction works so that aesthetics and convenience are ensured while spending as little construction funds as possible.

Article 5 (Principle of design ahead of execution of works)

Section titled “Article 5 (Principle of design ahead of execution of works)”

To firmly put design ahead of execution of works is an important principle that the State consistently upholds in construction.

By strengthening design staff and thoroughly organizing design planning and design work, the State shall ensure that design precedes the execution of works by not less than one year.

Article 6 (Principle of scientification of construction design)

Section titled “Article 6 (Principle of scientification of construction design)”

The State shall ensure the scientific character, accuracy and promptness of construction design by actively adopting advanced architectural technology, putting design methods on a scientific basis and modernizing design means.

Article 7 (Exchange and cooperation in the field of construction design)

Section titled “Article 7 (Exchange and cooperation in the field of construction design)”

The State shall develop exchange and cooperation with other countries and international organizations in the field of construction design.

Article 8 (Application of other laws and regulations)

Section titled “Article 8 (Application of other laws and regulations)”

Matters concerning construction design for which this Law lays down no rules shall be governed by the relevant laws and regulations, including the Construction Law and the City Planning Law.

Chapter 2. Drafting of construction design

Section titled “Chapter 2. Drafting of construction design”

Article 9 (Classification of construction design and design stages)

Section titled “Article 9 (Classification of construction design and design stages)”

Construction design is classified into the master plan for construction, construction works design and execution organization design.

Depending on the scale and characteristics of the project, the master plan for construction shall be drafted in the form of a master plan, a detailed plan, and a district and block plan; the construction works design in the form of an assignment design, a technical design and a working design; and the execution organization design in two stages, stage 1 and stage 2.

The master plan for construction, the assignment design and the technical design shall be drafted by the specialized construction design institution or enterprise of the relevant sector.

The working design shall be drafted by the construction contractor institution, enterprise or organization. The specialized construction design institution or enterprise may also draft it when the construction contractor institution, enterprise or organization so requests.

The execution organization design shall be drafted by the specialized execution organization design institution or enterprise. In the case of a construction project that is small in scale and whose execution is standardized, the construction contractor institution, enterprise or organization may also draft it.

The qualification of specialized construction design institutions and enterprises to draft designs by sector shall be determined by the central design guidance organ.

The construction client institution, enterprise or organization wishing to carry out construction of a project shall select the specialized construction design institution or enterprise of the relevant sector and order the drafting of the design. In this case, it shall prepare a design order form and then submit it to the design institution or enterprise through the relevant higher-level organ.

The design institution or enterprise that has been ordered to draft a design shall ascertain the content of the order and inform the construction client institution, enterprise or organization of the result within the prescribed period.

The specialized construction design institution or enterprise shall draft construction design in accordance with the national economic plan.

The State planning organ shall, ahead of the project construction plan, closely dovetail design plans for the construction client and the design institution or enterprise in accordance with the long-term plan for national economic development and the sequential and annual construction plans.

The construction client institution, enterprise or organization shall conclude a design contract with the relevant design institution or enterprise on the basis of the design plan.

The design contract shall state matters such as the design stage, the design period, the provision of design conditions and the design price.

Construction design may not be drafted without concluding a design contract.

Article 14 (Provision of data necessary for drafting design)

Section titled “Article 14 (Provision of data necessary for drafting design)”

The construction client institution, enterprise or organization shall provide the technical assignment document and the construction specification document approved according to the design stage. The technical assignment document shall accurately incorporate technical and economic requirements such as the capacity and scale of the construction project, the siting of productive forces, scientific and technological requirements, the economic effectiveness of investment and the conditions for the supply of construction materials.

The design institution or enterprise may request the construction client institution, enterprise or organization to provide data necessary for drafting design, and the construction client institution, enterprise or organization shall provide in good time the data requested by the design institution or enterprise in relation to the drafting of design.

Article 15 (Requirements to be observed in drafting design)

Section titled “Article 15 (Requirements to be observed in drafting design)”

The design institution or enterprise shall observe the following requirements in drafting design:

  1. Design shall be made from a Juche-oriented stand, in conformity with the aspirations and sentiments of life of our people, their excellent culture and customs, the natural-geographical and climatic conditions of our country and concrete reality.
  2. Design shall be made by closely combining national character with modernity and reflecting socialist content in national form.
  3. Design shall be made so that political and ideological character is visually embodied in architectural structures by displaying slogans or watchwords on buildings.
  4. Design shall be made practically, in conformity with the mission and use of the construction works, so that the convenience of the people can be ensured as the first priority.
  5. Design shall be made aesthetically, ensuring harmony and unity, non-repetitiveness and plastic artistry, so that the characteristics of the construction works and the local characteristics come alive.
  6. Design shall be made so that, on flat terrain, blocks are laid out on a proper scale and buildings are arranged, and on undulating and uneven terrain, buildings can be arranged by using the natural relief.
  7. Design shall be made so that the roads within a dwelling house block are laid out with two lanes allowing vehicles to pass each other, green space, roadside trees, street lamps, footpaths and cycle paths are arranged beside them, and buildings are sited after that.
  8. Design shall be made so that afforestation and landscape-gardening of the construction area and greening of buildings are achieved, and construction works are environmentally friendly, suited to the surrounding environment, and are green architectural structures.
  9. Design shall be made on the basis of scientific measurement data such as survey and geological investigation data, earthquake assessment data and meteorological observation data.
  10. Design shall be made so that the structural safety of the construction works is ensured and they suffer no damage from typhoons, floods, landslides, storm surges, earthquakes, heavy snow, lightning, fire and the like.
  11. Design shall be made so that all sectors, such as production technological processes, water supply and sewerage, electricity, posts and telecommunications, cooling and heating, air conditioning, lighting, acoustics, landscape gardens and furniture, conform to scientific and technological requirements and design-engineering requirements.
  12. Design shall be made so as to raise the economic effectiveness of investment, including by raising the site utilization rate and the building area utilization rate and saving construction funds and materials as far as possible, and so as to ensure minimum expenditure and maximum practical benefit.
  13. Design shall be made so that advanced and rational construction methods, including the dry construction method, can be actively adopted.
  14. Design shall be made in conformity with design-related standards and the approved technical assignment document and construction specification document.

Article 16 (Survey and geological investigation)

Section titled “Article 16 (Survey and geological investigation)”

The design institution or enterprise shall, before drafting design, carry out a scientific survey and geological investigation of the construction site and have the findings deliberated on and approved by the relevant design guidance organ.

Survey and geological investigation shall be carried out at the stages of the master plan for construction, the assignment design and the technical design, according to the investigation assignments of each stage.

Construction design may not be drafted without approved survey and geological investigation data.

The master plan for construction is divided into the industrial master plan for construction, the city and village master plan for construction and the sectoral master plan for construction, and shall be drafted, depending on the project, in conformity with the master plan for land construction or the master plan for city construction.

The design institution or enterprise shall draft the master plan for construction in accordance with the order of the construction client institution, enterprise or organization and have it deliberated on and approved.

The construction client institution, enterprise or organization shall provide the design institution or enterprise with a construction location designation document or a construction site specification document when ordering the master plan for construction.

The design institution or enterprise shall, in accordance with the decision of the relevant non-standing construction deliberation committee, draft a design proposal for the construction project and have it deliberated on.

The design proposal shall be drafted on the basis of a detailed field reconnaissance of the construction site and scientific survey and geological investigation data. In this case, for a construction project equipped with production technological processes, such as a factory that is newly built or reconstructed and modernized, a process design shall be drafted and agreed with the relevant design guidance organ and the construction client institution, enterprise or organization, and then the design proposal shall be drafted.

For national monumental construction projects, a design competition shall be organized and a rational design proposal decided.

An assignment design shall be drafted for large-scale important construction projects, construction projects adopting new technological processes, and construction projects adopting special structural forms or new construction methods.

The design institution or enterprise shall draft the assignment design on the basis of the technical assignment document and then have it deliberated on and approved.

The assignment design includes design drawings incorporating two or more design options, a design budget, a technical-economic index analysis table, an economic effectiveness analysis table, an explanatory note, calculation sheets, a research report and a design record.

A technical design shall be drafted for every construction project.

The design institution or enterprise shall, in the order of construction, draft a technical design for each project on the basis of the assignment design or the technical assignment document, and then have it deliberated on and approved.

The technical design includes design drawings, a design budget, a technical-economic index analysis table, an explanatory note, calculation sheets, a research report, a design record and a trial operation guide.

The construction contractor institution, enterprise or organization shall, before execution of works, draft a working design that specifies the detailed elements and work content of the construction works, in conformity with the approved technical design and the concrete conditions of execution.

A working design need not be drafted for construction projects with a small investment scale and standardized methods of execution.

Article 22 (Design joint appraisal meeting)

Section titled “Article 22 (Design joint appraisal meeting)”

The design institution or enterprise shall complete the design it has drafted after receiving the opinions of the design joint appraisal meeting.

The persons needed for the design joint appraisal meeting, including designers, scientists, technicians, specialists and officials of the relevant sector, shall take part in it.

The design institution or enterprise shall obtain the agreement of the construction client, the construction contractor institution, enterprise or organization, and the relevant institution on the design it has drafted.

The construction client, the construction contractor institution, enterprise or organization, and the relevant institution shall give agreement on the design within the prescribed period.

Chapter 3. Deliberation on and approval of construction design

Section titled “Chapter 3. Deliberation on and approval of construction design”

Article 24 (Organs for deliberation on and approval of construction design)

Section titled “Article 24 (Organs for deliberation on and approval of construction design)”

Construction design shall be deliberated on and approved by the following organs, by design stage:

  1. The master plans for construction of cities and counties and of important projects shall be approved by the Cabinet after deliberation by the central design guidance organ and the relevant institution, and other master plans for construction, detailed plans, and district and block plans shall be approved by the central design guidance organ after deliberation by the central design guidance organ and the relevant institution.
  2. The design proposal shall be deliberated on by the central design guidance organ and the relevant institution.
  3. The assignment design shall be deliberated on and approved by the Cabinet after deliberation by the central design guidance organ and the relevant institution.
  4. The technical design shall be deliberated on and approved by the province (municipality directly under central authority) design guidance organ, the central design guidance organ and the relevant institution, according to scale and project.

Construction may not be carried out on the basis of a design that has not been deliberated on and approved.

Article 25 (Organization and operation of the deliberation committee)

Section titled “Article 25 (Organization and operation of the deliberation committee)”

The design deliberation and approval organ shall organize and operate a deliberation committee for deliberation on construction design.

The deliberation committee shall be composed of necessary members such as design personnel, scientists, technicians and specialist personnel of the relevant sector.

The deliberation committee shall deliberate on the master plan for construction, the design proposal, the assignment design and the technical design.

Article 26 (Method of design deliberation)

Section titled “Article 26 (Method of design deliberation)”

Design deliberation shall be carried out by examining the relevant content by sector and by technical specialty, and then collectively deliberating on the opinions raised and deciding on them in the deliberation committee.

The design shall be amended in accordance with the decision of the deliberation committee.

The design deliberation and approval organ shall decide whether or not to give final approval on the basis of the result of deliberation by the deliberation committee.

A design that does not meet the requirements of the State’s construction policy and design standards, or whose quality and economic efficiency are not ensured, may not be approved.

Article 28 (Handing down of approved design)

Section titled “Article 28 (Handing down of approved design)”

The design deliberation and approval organ shall hand down the approved design to the design institution or enterprise. Where opinions have been raised in deliberation, the deliberation opinions shall be attached.

The design institution or enterprise shall amend the design in accordance with the opinions raised in deliberation and hand it over to the construction client institution, enterprise or organization.

Article 29 (Return of rejected design documents)

Section titled “Article 29 (Return of rejected design documents)”

Where the design deliberation and approval organ has rejected a design, it shall state the reason and return the design documents to the design institution or enterprise.

The design institution or enterprise that has received back the design documents shall amend the design and submit it again for deliberation.

Article 30 (Period for deliberation on and approval of design)

Section titled “Article 30 (Period for deliberation on and approval of design)”

The design deliberation and approval organ shall deliberate on the design documents and approve or reject them within 30 days from the date of receiving them.

Where the design documents have not been completed as prescribed, they shall be returned within five days.

Article 31 (Validity period of approved technical design)

Section titled “Article 31 (Validity period of approved technical design)”

The validity period of an approved technical design is five years from the date of approval.

The technical design of a construction project for which a construction permit has not been obtained or construction has not been started within the validity period shall be deliberated on and approved again in accordance with the prescribed procedure.

The design institution or enterprise shall carry out the following work at the construction site for the realization of the design:

  1. At each stage of execution, in accordance with the request of the construction contractor institution, enterprise or organization, carry out in good time specification surveys, verification surveys, confirmation of geological conditions and completion inspection surveys.
  2. Take part in process-by-process deliberation and deliberate on whether conditions for executing the works according to the design have been met.
  3. Give in good time technical agreement on problems arising in executing the works according to the design.

An approved design may not be changed arbitrarily.

Where a problem requiring a change of design arises in the process-by-process deliberation or in the course of execution of works, the design institution or enterprise shall draft a design change proposal, agree on it with the construction client, the construction contractor institution, enterprise or organization and the construction supervision organ, and then have it deliberated on and approved by the relevant design deliberation and approval organ.

The design institution or enterprise shall, as soon as the construction of a project is completed, carry out a design review of the completed construction works. In this case, it shall examine and review matters such as design defects and the status of their elimination, the status of design changes according to construction conditions, and the status of implementation of the design budget.

Article 35 (Project responsibility system in design)

Section titled “Article 35 (Project responsibility system in design)”

The design institution or enterprise and the design deliberation and approval organ shall be liable for the quality of design.

The design institution or enterprise shall implement the project responsibility system in the drafting and realization of design.

Chapter 4. Scientification of construction design

Section titled “Chapter 4. Scientification of construction design”

Article 36 (Science and technology development plan of the design sector)

Section titled “Article 36 (Science and technology development plan of the design sector)”

The central design guidance organ and the central science and technology administration guidance and management organ shall draw up and implement a science and technology development plan for raising the level of scientification of design.

Article 37 (Research and introduction of advanced architectural science and technology)

Section titled “Article 37 (Research and introduction of advanced architectural science and technology)”

The central design guidance organ and the central science and technology administration guidance and management organ shall deepen research on advanced structural patterns of construction and scientific calculation methods, and actively adopt in construction design the achievements of advanced science and technology, including green architecture and intelligent architecture technology.

Article 38 (Standardization and normalization of construction design)

Section titled “Article 38 (Standardization and normalization of construction design)”

The central design guidance organ shall diversify standard designs by type of construction works, continuously develop standard designs of structural elements, and adopt coded design technology to raise the level of standardization and normalization of construction design.

Article 39 (Scientification of design methods and modernization of design means)

Section titled “Article 39 (Scientification of design methods and modernization of design means)”

The central design guidance organ and the central science and technology administration guidance and management organ shall, in keeping with the requirements of the development of reality, sufficiently equip themselves with modern design means, research, develop and utilize design application programs and systems of the most advanced level in our own style, and thereby achieve the scientification of design methods and the modernization of design means.

Article 40 (Introduction of building information modelling technology)

Section titled “Article 40 (Introduction of building information modelling technology)”

The central design guidance organ shall adopt building information modelling technology, research and develop an integrated design method suited to our actual conditions, and thereby raise the scientific character and accuracy of construction design.

Article 41 (Digitization and informatization of construction areas)

Section titled “Article 41 (Digitization and informatization of construction areas)”

The central design guidance organ and the relevant institution shall, on the basis of data from the survey of current conditions, the execution survey and the completion inspection survey of construction areas, digitize all construction areas, compile them into information systems and utilize them in construction design.

Article 42 (Dissemination of architectural science and technology data)

Section titled “Article 42 (Dissemination of architectural science and technology data)”

The central design guidance organ and the relevant institution shall properly establish the system of dissemination of architectural science and technology data to design institutions and enterprises, and regularly disseminate data on advanced trends in architectural development and science and technology data.

Chapter 5. Guidance and control of construction design work

Section titled “Chapter 5. Guidance and control of construction design work”

Article 43 (Guidance organs for construction design work)

Section titled “Article 43 (Guidance organs for construction design work)”

Guidance of construction design work shall be exercised by the central design guidance organ, the local people’s committees and the relevant institution under the unified guidance of the Cabinet.

The Cabinet, the central design guidance organ, the local people’s committees and the relevant institution shall properly establish the guidance system for construction design work in keeping with the State’s construction policy, trends in architectural development and the requirements of the development of reality, and regularly take charge of and guide it.

The central design guidance organ, the local people’s committees and the relevant institution shall strengthen specialized design institutions by sector of the national economy and by region, and raise the level of specialization of design.

Article 45 (Strengthening of design staff)

Section titled “Article 45 (Strengthening of design staff)”

The central design guidance organ, the local people’s committees and the relevant institution shall strengthen construction design staff with capable officials who have specialist technical qualifications, and continuously raise the level of design personnel in keeping with the requirements of the development of reality.

Article 46 (Establishment of construction design standards)

Section titled “Article 46 (Establishment of construction design standards)”

Construction design standards shall be established by the State construction supervision organ in consultation with the central design guidance organ.

The State construction supervision organ shall properly determine standards related to construction design on the basis of trends in architectural development and the achievements of advanced science and technology, and ensure that they are applied accurately.

Supervision and control of construction design work shall be exercised by the relevant supervision and control organ.

The relevant supervision and control organ shall strictly supervise and control the implementation of the State’s policy related to construction design.

Article 48 (Penalty of suspension, downgrading or deprivation of qualification)

Section titled “Article 48 (Penalty of suspension, downgrading or deprivation of qualification)”

Where a person holding a construction design qualification has committed an unlawful act by using it, the penalty of suspension of qualification, downgrading of qualification or deprivation of qualification shall be given according to the circumstances.

Where a failure to draft, deliberate on or approve a construction design properly, or a violation of the prescribed rules, has caused damage to the property of the State and social cooperative organizations, the penalty of restitution shall be given to the institution, enterprise or organization responsible.

Article 50 (Penalties of warning, stern warning, unpaid labour, labour education, demotion, dismissal and removal from post)

Section titled “Article 50 (Penalties of warning, stern warning, unpaid labour, labour education, demotion, dismissal and removal from post)”

In the following cases, the person responsible shall be given the penalty of warning or stern warning, or the penalty of unpaid labour or labour education of not more than three months:

  1. Where a construction project not matching the qualification to draft design has been designed
  2. Where the design plan has not been drawn up properly or has not been fulfilled, impeding construction
  3. Where design has been carried out in violation of the rules on ordering and contracting design
  4. Where data necessary for drafting design, including the technical assignment document, have not been provided in good time, impeding the drafting of design
  5. Where a survey or geological investigation has not been carried out properly, or design has been carried out without approved survey and geological investigation data
  6. Where design has been carried out contrary to the approved master plan for construction, construction specification document or technical assignment document
  7. Where design has been carried out without obtaining endorsement of the design proposal as prescribed, or contrary to the endorsed design proposal
  8. Where design has not been carried out as required by the design standards
  9. Where agreement on design has not been given properly or in good time, impeding construction
  10. Where construction has been impeded by improper or late deliberation on or approval of a design
  11. Where an unapproved design has been issued, encouraging unlawful construction
  12. Where technical agreement on problems arising in executing the works according to the design has not been given in good time, impeding construction
  13. Where an approved design has been changed arbitrarily
  14. Where an accident has been caused by a design defect

Where the circumstances of an act under items 1 to 14 of the preceding paragraph are grave, the penalty of unpaid labour or labour education of not less than three months, or the penalty of demotion, dismissal or removal from post shall be given.

Where an act in violation of this Law amounts to a crime, criminal liability shall be imposed on the person responsible in accordance with the relevant article of the Criminal Law.

English translations by NK Law are licensed under CC BY-SA 4.0.Copyright and reuse

Contact info@nklaw.org

Privacy policy