Electric Power Law of the Democratic People's Republic of Korea

Edition dated 26 October 2021. August 2024 NIS compilation, vol. 1, pp. 923–938

Adopted on 20 December Juche 84 (1995) by Decision No. 65 of the Permanent Committee of the Supreme People’s Assembly
Amended and supplemented on 14 January Juche 88 (1999) by Decree No. 350 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 27 September Juche 90 (2001) by Decree No. 2593 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 24 January Juche 95 (2006) by Decree No. 1528 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 7 November Juche 95 (2006) by Decree No. 2045 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 30 September Juche 97 (2008) by Decree No. 2899 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 22 April Juche 104 (2015) by Decree No. 471 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 25 January Juche 106 (2017) by Decree No. 1521 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 10 May Juche 107 (2018) by Decree No. 2239 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 24 September Juche 107 (2018) by Decree No. 2400 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 20 November Juche 108 (2019) by Decree No. 163 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 26 November Juche 109 (2020) by Decree No. 470 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 26 October Juche 110 (2021) by Decree No. 756 of the Standing Committee of the Supreme People’s Assembly

Source · Republic of Korea National Intelligence Service, Compilation of North Korean Laws (북한법령집), August 2024, vol. 1, pp. 923–938.

The first draft of this translation was produced with AI assistance.

Later edition (2023-12-14)

Chapter 1. Fundamentals of the Electric Power Law

Section titled “Chapter 1. Fundamentals of the Electric Power Law”

Article 1 (Mission of the Electric Power Law)

Section titled “Article 1 (Mission of the Electric Power Law)”

The Electric Power Law of the Democratic People’s Republic of Korea contributes to speeding up economic construction and raising the people’s living standards by strictly establishing discipline and order in power facility construction, power production, power supply, staggered production organization and command, power use, power dispatching command and operation of the national integrated power management system.

Article 2 (Principle of development of the electric power industry)

Section titled “Article 2 (Principle of development of the electric power industry)”

Power is the basic motive power of the national economy.

The State shall systematically increase investment in the electric power industry sector, firmly build up independent and modern electric power industry bases, and develop the electric power industry ahead of the other sectors of the national economy.

Article 3 (Principle of power facility construction)

Section titled “Article 3 (Principle of power facility construction)”

Power facility construction is the basic guarantee for strengthening the motive power base of the country.

The State shall ensure that, with hydropower station construction as the basis, the construction of thermal power stations and nuclear power stations and of power stations relying on wind, geothermal, tidal, biomass, solar heat and various other energy resources is combined with it, the construction of large-scale power stations and of small and medium-scale power stations is advanced in parallel, and the construction of transmission and distribution facilities follows on from them.

Increasing and normalizing power production is the consistent policy of the State.

The State shall ensure that the foundation of power production is overhauled and reinforced and expanded with a long-term view, the efficiency of generating equipment is raised, and full operation and full load are maintained, so that power production increases continuously.

Article 5 (Principle of formation of the integrated power management system, power supply, staggered production organization and power use)

Section titled “Article 5 (Principle of formation of the integrated power management system, power supply, staggered production organization and power use)”

The State shall ensure that, in keeping with the requirements of the development of the national economy, a State-level integrated power management system is formed and operated substantively, and that, together with this, power of good quality is supplied, staggered production is organized rationally and power is used effectively.

Article 6 (Principle of power dispatching command)

Section titled “Article 6 (Principle of power dispatching command)”

The State shall ensure that a centralized power dispatching command system is established, the responsibility system of local power transmission and distribution organs is strengthened, and the operation of the power system is commanded in a unified manner.

Article 7 (Principle of modernization and automation of power facilities)

Section titled “Article 7 (Principle of modernization and automation of power facilities)”

The State shall ensure that the training of scientific and technical talent and scientific research work in the electric power industry sector are strengthened, the achievements of modern science and technology are actively adopted, and power facilities are modernized and automated.

Article 8 (Principle of electricity saving and protection of power installations)

Section titled “Article 8 (Principle of electricity saving and protection of power installations)”

The State shall ensure that education in patriotism is strengthened among the people, so that they use electricity as sparingly as possible and take part consciously in the work of protecting power installations.

Article 9 (Exchange and cooperation in the field of the electric power industry)

Section titled “Article 9 (Exchange and cooperation in the field of the electric power industry)”

The State shall develop scientific and technical exchange and cooperation in the field of the electric power industry with various countries of the world and international organizations, and shall encourage the construction of hydropower stations through the joint development of border rivers.

Chapter 2. Construction of power facilities

Section titled “Chapter 2. Construction of power facilities”

Article 10 (Planning of power facility construction)

Section titled “Article 10 (Planning of power facility construction)”

Proper construction of power facilities is an important requirement for raising power production capacity and supply capacity.

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall carry out the construction of power facilities such as power stations and transmission and distribution facilities according to plan.

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall, before power facility construction, carry out a detailed survey of power resources and, on that basis, properly determine the location of power station construction.

The location for the construction of a hydropower station shall be determined with a long-term view by accurately surveying the volume of water obtainable, the head and the like, and the location for the construction of a thermal power station by accurately surveying the fuel source, its reserves, industrial water supply, the transport conditions and the like.

Article 12 (Calculation of economic effectiveness)

Section titled “Article 12 (Calculation of economic effectiveness)”

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall calculate in detail the economic effectiveness of each power facility construction project and concentrate investment on projects of high economic effectiveness.

Article 13 (Drawing up of the power facility construction plan)

Section titled “Article 13 (Drawing up of the power facility construction plan)”

The power facility construction plan shall be drawn up by the State planning organ.

The State planning organ shall draw up the power facility construction plan on the basis of the prospective demand for power and the data of the power resources survey.

Article 14 (Design of power facility construction)

Section titled “Article 14 (Design of power facility construction)”

The design of power facility construction shall be prepared by the power and motive power design institution or by a design institution or enterprise designated for the purpose.

The power and motive power design institution, and the relevant design institutions and enterprises, shall accurately assess the projects to be constructed, their scale and the like, and design power facilities in accordance with the approved technical assignment.

The design of hydropower stations shall, for the projects required, provide regulating ponds that can be used for daily load adjustment and reserve capacity of generating equipment.

Article 15 (Institutions constructing power facilities)

Section titled “Article 15 (Institutions constructing power facilities)”

The construction of power stations shall be undertaken by specialized power station construction enterprises or by the relevant institutions, enterprises and organizations.

The construction of transmission and distribution facilities of the main power system shall be undertaken by institutions and enterprises of the electric power industry sector, and the construction of other transmission and distribution facilities by the relevant institutions, enterprises and organizations.

Article 16 (Quality of power facility construction works and meeting the commissioning date)

Section titled “Article 16 (Quality of power facility construction works and meeting the commissioning date)”

Institutions, enterprises and organizations constructing power facilities shall carry out power facility construction in accordance with the requirements of the design, raise the quality of the construction works and meet the commissioning date.

The State planning organ and the relevant institutions and enterprises shall produce and ensure the supply of generating equipment and transmission and distribution equipment in good time so that there is no impediment to the commissioning of power facilities.

Power facilities that have failed to pass the completion inspection may not be operated.

Article 17 (Construction of small and medium-sized power stations)

Section titled “Article 17 (Construction of small and medium-sized power stations)”

Institutions, enterprises and organizations shall, by rationally using various motive power resources, construct small and medium-sized power stations practically through a mass movement and operate them normally.

Power produced at small and medium-sized power stations may be used to supplement the power demand of the institution, enterprise or organization itself.

Article 18 (New construction, expansion and relocation of power facilities)

Section titled “Article 18 (New construction, expansion and relocation of power facilities)”

Institutions, enterprises and organizations that intend to newly construct, expand or relocate generating equipment and transmission and distribution facilities shall obtain the approval of the central electric power industry guidance organ. In this case, they shall complete the formalities required by the rules on land use.

Electric wires may not be strung or poles erected haphazardly.

Article 19 (Establishment and use of the natural energy power generation fund)

Section titled “Article 19 (Establishment and use of the natural energy power generation fund)”

The State shall set up a natural energy power generation fund to provide the funds needed for the construction and management and operation of natural energy power stations.

The natural energy power generation fund shall be used only for the construction and management and operation of natural energy power stations.

Power production is one of the basic conditions for meeting the growing demand for power.

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall properly manage the equipment and technology of power stations, thoroughly organize production in keeping with seasonal and economic conditions, and mobilize internal reserves to increase power production.

Article 21 (Drawing up and implementation of the power production plan)

Section titled “Article 21 (Drawing up and implementation of the power production plan)”

The State planning organ shall accurately calculate the amount of power that can be produced and draw up a scientific and realistic power production plan.

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall implement the power production plan without fail.

Article 22 (Power production of hydropower stations)

Section titled “Article 22 (Power production of hydropower stations)”

The relevant institutions, enterprises and organizations shall carry out the repair of hydropower station structures and generating equipment to a high standard and manage water scientifically in keeping with weather conditions, so as to normalize power production.

Article 23 (Operating efficiency of hydropower stations)

Section titled “Article 23 (Operating efficiency of hydropower stations)”

The relevant institutions, enterprises and organizations shall build a system for measuring the efficiency of hydropower stations in real time and operate the stations at a high water level and high efficiency.

Generating equipment may not be operated below the dead water level. Where generating equipment is to be operated below the dead water level owing to unavoidable circumstances, the approval of the Cabinet shall be obtained.

The dead water level shall be fixed by the central electric power industry guidance organ with the approval of the Cabinet.

Article 24 (Securing water for hydropower stations)

Section titled “Article 24 (Securing water for hydropower stations)”

The relevant institutions, enterprises and organizations shall newly build or expand intake facilities along the way of hydropower stations to obtain more water, regularly survey the safety of hydraulic structures and carry out inspection and repair to a high standard, so as to eliminate the loss of water in transit.

Water of the reservoir and waterways of a hydropower station may not be drawn off and used for other purposes without the approval of the central electric power industry guidance organ.

Article 25 (Protection zones of hydropower stations, waterway tunnels and reservoirs)

Section titled “Article 25 (Protection zones of hydropower stations, waterway tunnels and reservoirs)”

To protect hydropower stations, waterway tunnels and reservoirs, hydropower station protection zones, waterway tunnel protection zones and reservoir protection zones shall be designated.

Hydropower station protection zones, waterway tunnel protection zones and reservoir protection zones shall be designated by the Cabinet.

Article 26 (Management of the protection zones of hydropower stations, waterway tunnels and reservoirs)

Section titled “Article 26 (Management of the protection zones of hydropower stations, waterway tunnels and reservoirs)”

Institutions, enterprises and organizations managing the protection zones of hydropower stations, waterway tunnels and reservoirs, and the relevant people’s committees, shall carry out according to plan the repair of power stations and waterway tunnels, dredging of intakes, treatment of sediment at dams, excavation of spillways, dredging of reservoirs, digging of channels, creation of reservoir protection forests and the like.

Institutions, enterprises, organizations and citizens shall not discharge tailings or harmful substances into rivers flowing into hydropower station reservoirs, and where they intend to cut trees, cultivate plots or mine in a protection zone, they shall reach agreement with the central electric power industry guidance organ and obtain the approval of the central land and environment protection guidance organ and the relevant institution.

Article 27 (Power production of thermal power stations)

Section titled “Article 27 (Power production of thermal power stations)”

The relevant institutions and enterprises shall overhaul and reinforce the equipment of thermal power stations, constantly renew technical and economic indicators, save fuel and increase power production.

Coal for power production shall not be used for purposes other than power production, and the consumption standards set for coal use shall be strictly observed.

Article 28 (Use of steam for power production)

Section titled “Article 28 (Use of steam for power production)”

Steam for power production may not be used for other purposes, either directly or after pressure reduction.

Where, as necessary, steam for power production is to be reduced in pressure and used as industrial steam or hot water for urban heating, the approval of the Cabinet shall be obtained.

The rules on the use of industrial steam or hot water for urban heating shall be as separately prescribed.

Article 29 (Supply of coal to thermal power stations)

Section titled “Article 29 (Supply of coal to thermal power stations)”

The State planning organ and the relevant institutions and enterprises shall supply the coal needed by thermal power stations ahead of other sectors, so that they can produce power with reserves of not less than one week’s worth.

The railway transport organ shall form circulating trains for the transport of coal for power production and transport the coal supplied to thermal power stations in a concentrated manner and in good time.

Coal that has not reached the prescribed grade and standard may not be supplied to thermal power stations.

Article 30 (Power production by boilers and industrial furnaces)

Section titled “Article 30 (Power production by boilers and industrial furnaces)”

Institutions, enterprises and organizations that have boilers and industrial furnaces capable of producing power shall install and operate generating equipment.

Power supply to institutions, enterprises and organizations that have not installed generating equipment may be restricted.

Proper power supply is a prerequisite for firmly guaranteeing the balance between power production and consumption and maintaining the rated frequency.

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall supply the power produced rationally.

The State planning organ shall draw up the power supply plan in accordance with the amount of power produced. In this case, the power supply plan for important production enterprises shall be drawn up in detail on the basis of ascertaining production conditions in detail each month.

Where the power produced is less than planned, or where there is an accident, natural disaster or other urgent reason, the power supply plan may be adjusted and power supplied to the relevant institutions, enterprises and organizations with the approval of the Cabinet.

Electric power industry guidance organs and power end-user institutions, enterprises and organizations shall conclude contracts in accordance with the power supply plan and are required to perform them. In this case, power end-user institutions, enterprises and organizations shall conclude the power supply contract directly with the relevant local power transmission and distribution organ without going through a higher-level organ.

Article 34 (Power for farming and power supply in the rainy season)

Section titled “Article 34 (Power for farming and power supply in the rainy season)”

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall give priority to the power needed by rural areas in the farming season, and to the supply of power in the rainy season to facilities at risk of flooding of pits, such as coal mines and mines.

Article 35 (Ensuring the quality of power)

Section titled “Article 35 (Ensuring the quality of power)”

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall ensure the quality of the power they supply.

Power end-user institutions, enterprises and organizations may submit special requirements concerning the quality of the power supplied. In this case, electric power industry guidance organs and the relevant institutions, enterprises and organizations may, after examining the reasons and the capacity of transmission and distribution facilities and the like, supply power whose required quality is ensured.

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall supply power normally, without interruption, in accordance with the contract.

Where power supply is to be restricted owing to overhaul and repair of power facilities or other unavoidable circumstances, or is to be suspended because of unlawful acts, the relevant institutions, enterprises and organizations shall be informed in advance.

Article 37 (Prohibition of supplying power for own consumption)

Section titled “Article 37 (Prohibition of supplying power for own consumption)”

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall not supply power directly from the own-consumption power systems of power stations and substations.

Power for own consumption may be used only for power production and the operation of transmission and distribution equipment.

Article 38 (Reducing loss of power in transit)

Section titled “Article 38 (Reducing loss of power in transit)”

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall reduce the loss of power in transit as far as possible by properly establishing the transmission system, reconstructing and repairing transmission and distribution networks, and raising voltage levels and the power factor.

Transmission systems shall gradually be converted to flexible alternating current transmission systems.

Article 39 (Management of power facilities)

Section titled “Article 39 (Management of power facilities)”

Power facilities shall be managed by electric power industry guidance organs and the relevant institutions, enterprises and organizations, as the case may be.

Transmission lines passing through zones where entry is restricted or prohibited shall be managed by transmission and distribution organs or the relevant institutions, enterprises and organizations, as prescribed.

Institutions, enterprises and organizations shall provide in good time the conditions needed for the management of power facilities installed in their area of jurisdiction.

Article 40 (Connection and disconnection of power facilities)

Section titled “Article 40 (Connection and disconnection of power facilities)”

Institutions, enterprises and organizations that intend to connect power facilities to the national power system or disconnect power facilities from the national power system shall obtain the approval of the central electric power industry guidance organ or the relevant local power transmission and distribution organ.

Article 41 (Protection zones for transmission and distribution and power communication facilities)

Section titled “Article 41 (Protection zones for transmission and distribution and power communication facilities)”

The State shall designate protection zones for transmission and distribution and power communication facilities in order to protect transmission and distribution facilities and power communication facilities.

Protection zones for transmission and distribution and power communication facilities shall be designated by the Cabinet.

Article 42 (Management of protection zones for transmission and distribution and power communication facilities)

Section titled “Article 42 (Management of protection zones for transmission and distribution and power communication facilities)”

No other structures may be constructed in protection zones for transmission and distribution and power communication facilities.

The relevant institutions, enterprises and organizations shall put up fences around protection zones for transmission and distribution and power communication facilities and install necessary signs such as “Electric Danger” and “No Entry”.

Article 43 (Protection of transmission and distribution and power communication facilities)

Section titled “Article 43 (Protection of transmission and distribution and power communication facilities)”

Institutions, enterprises, organizations and citizens shall cherish transmission and distribution and power communication facilities and shall not impede power supply and communication.

Power lines may not be connected without approval to transmission and distribution facilities that are not of one’s own system.

Chapter 5. Organization and command of staggered production

Section titled “Chapter 5. Organization and command of staggered production”

Article 44 (Production and business activities under the staggered production contract)

Section titled “Article 44 (Production and business activities under the staggered production contract)”

Proper organization and command of staggered production in institutions, enterprises and organizations is an important means of saving electricity and using the power produced effectively.

Power end-user institutions, enterprises and organizations shall conclude a staggered production contract with the relevant local power transmission and distribution organ and carry out production and business activities accordingly.

Institutions separately designated need not conclude staggered production contracts.

Article 45 (Preparation and submission of the staggered production schedule)

Section titled “Article 45 (Preparation and submission of the staggered production schedule)”

Power end-user institutions, enterprises and organizations that intend to conclude a staggered production contract shall, in accordance with the power supply contract concluded, prepare each month a staggered production schedule that accurately incorporates the power demand by date, by hour and by machine, and then submit it to the relevant local power transmission and distribution organ within the prescribed period.

Article 46 (Requirements to be observed in preparing the staggered production schedule)

Section titled “Article 46 (Requirements to be observed in preparing the staggered production schedule)”

Power end-user institutions, enterprises and organizations shall observe the following requirements in preparing the staggered production schedule:

  1. They shall keep track of all electrical equipment used by their own unit without omission, classify it by power-consuming process, and calculate the hourly power consumption of each process from the capacity of the equipment and the actual load coefficients.
  2. They shall calculate the dates and times for running and stopping the processes within the range, prescribed under the power supply contract, of the amount of power to be used in the month.
  3. They shall take into account the conditions of preparation for production and business such as raw materials, fuel, materials, labour force and equipment, and the power consumption characteristics of each piece of equipment.

Article 47 (Conclusion of the staggered production contract)

Section titled “Article 47 (Conclusion of the staggered production contract)”

The local power transmission and distribution organ that has received the staggered production schedule shall, according to the power source relationship, give its agreement directly for units under its own jurisdiction, and for those under the jurisdiction of a higher-level organ submit the schedules to the higher-level organ so that its agreement is obtained.

Power end-user institutions, enterprises and organizations that have obtained agreement on the staggered production schedule shall conclude a staggered production contract with the relevant local power transmission and distribution organ.

Power shall not be supplied to power end-user institutions, enterprises and organizations that have not concluded a staggered production contract within the prescribed period, and the power end-user institution, enterprise or organization concerned is liable for this.

Article 48 (Preparation and input of power use limits and amounts of power)

Section titled “Article 48 (Preparation and input of power use limits and amounts of power)”

The local power transmission and distribution organ that has concluded a staggered production contract with a power end-user institution, enterprise or organization shall prepare the power use limits and amounts of power, by date and by hour, of distribution lines, secondary substations, transmission lines and primary substations, input them into the power management technical device, and then report the results to the higher-level organ.

Article 49 (Observance of the staggered production contract)

Section titled “Article 49 (Observance of the staggered production contract)”

Power end-user institutions, enterprises and organizations shall, in accordance with the staggered production contract concluded, organize staggered production rationally by workshop and work team, by process and by machine.

A staggered production contract may not be violated.

Article 50 (Change of the staggered production contract)

Section titled “Article 50 (Change of the staggered production contract)”

Where the power supply plan is increased or decreased or other State requirements arise, power end-user institutions, enterprises and organizations may ask the relevant local power transmission and distribution organ to change the content of the staggered production contract.

The local power transmission and distribution organ that has received a request that the content of the staggered production contract be changed shall examine it carefully and give its agreement. In this case, a change to the staggered production schedule shall be subject to the approval of the higher-level organ or the central electric power industry guidance organ, and in special cases to the approval of the Cabinet.

Article 51 (Command of staggered production)

Section titled “Article 51 (Command of staggered production)”

Electric power industry guidance organs and the relevant institutions shall regularly exercise oversight and control so that power end-user institutions, enterprises and organizations strictly observe the staggered production contract.

Power end-user institutions, enterprises and organizations shall form staggered production command teams suited to actual conditions and responsibly carry out the organization and command of staggered production in their own unit.

The staggered production command teams of ministries and central organs shall, in liaison with the central electric power industry guidance organ, properly take charge of and guide the staggered production command teams of the power end-user institutions, enterprises and organizations under them.

Article 52 (Observance of the power supply plan and power use limits)

Section titled “Article 52 (Observance of the power supply plan and power use limits)”

Using power rationally is an important means of eliminating the waste of fuel and motive power and increasing production.

Institutions, enterprises, organizations and citizens shall observe the power supply plan or power use limits and use the power supplied only for the prescribed objects.

The relevant institutions, enterprises and organizations shall observe the power consumption standard per unit of product and lower it systematically.

The power consumption standard shall be set by the State planning organ or the relevant institution.

Article 54 (Remodelling of equipment and production processes)

Section titled “Article 54 (Remodelling of equipment and production processes)”

The relevant institutions, enterprises and organizations shall actively conduct the technical innovation movement, introduce advanced science and technology, and remodel equipment and production processes into electricity-saving types.

The relevant scientific research institutions shall strengthen scientific research work on electricity-saving equipment and production processes.

Article 55 (Prohibition of installing excessive-capacity power equipment)

Section titled “Article 55 (Prohibition of installing excessive-capacity power equipment)”

Institutions, enterprises and organizations shall not install power equipment of excessive capacity.

Installed power equipment of excessive capacity shall be replaced with power equipment of the required capacity.

Where power equipment of excessive capacity continues to be used without being replaced with power equipment of the required capacity, its operation shall be suspended.

Article 56 (Permission to use electrical equipment)

Section titled “Article 56 (Permission to use electrical equipment)”

Institutions, enterprises, organizations and citizens that intend to use electric heating equipment shall obtain the permission of the central electric power industry guidance organ or the provincial power transmission and distribution organ, as the case may be. However, where they intend to use large-capacity electric heating equipment, operate electrically heated sauna facilities or use electric heat for heating, they shall obtain the approval of the Cabinet after examination by the central electric power industry guidance organ and the State planning organ.

The rules on the use of other electrical equipment shall be as prescribed in the relevant regulations and detailed rules.

Institutions, enterprises, organizations and citizens shall eliminate the idle running of machinery and equipment, and shall not operate at light load, switch on unnecessary lamps or lamps that consume much power, or use power equipment that has not been permitted or registered.

They may not engage in acts such as using power equipment contrary to its purpose and capacity, or stealthily stealing power without installing or using a power metering device or without making the wiring connection properly.

Article 58 (Compensation of reactive power)

Section titled “Article 58 (Compensation of reactive power)”

Institutions, enterprises, organizations and citizens shall reduce reactive power consumption and install reactive power production equipment to compensate by themselves for the reactive power consumed.

Article 59 (Calculation of power supply and consumption and payment of power charges)

Section titled “Article 59 (Calculation of power supply and consumption and payment of power charges)”

Electric power industry guidance organs shall periodically verify power metering devices and accurately calculate power supply and consumption.

Institutions, enterprises, organizations and citizens that intend to use power shall pay the power usage charge as prescribed. In this case, the power usage charge shall be paid directly to the relevant local power transmission and distribution organ without going through a higher-level organ.

The procedure and method of paying the power usage charge shall be as separately prescribed.

Article 60 (Supply of equipment for saving electricity)

Section titled “Article 60 (Supply of equipment for saving electricity)”

The State planning organ and the relevant institutions, enterprises and organizations shall ensure, as demanded, the supply of LED lamps, reactive power production equipment, card-type integrating watt-hour meters and the like capable of saving electricity.

Article 61 (Prohibition of producing and importing electrical equipment of low efficiency grade)

Section titled “Article 61 (Prohibition of producing and importing electrical equipment of low efficiency grade)”

Electrical equipment of low efficiency grade may not be produced or imported.

Efficiency grades for electrical equipment shall be fixed by the central electric power industry guidance organ.

Electric power industry guidance organs shall scientifically verify the power consumption of power-consuming units and exercise stricter control over power consumption.

Institutions, enterprises, organizations and citizens shall install power metering devices at places where power consumption can be objectively verified.

Article 63 (Unified command of power production, supply and consumption)

Section titled “Article 63 (Unified command of power production, supply and consumption)”

Power dispatching command is an important undertaking for taking charge of the operation of the power system and supplying power of good quality.

Electric power industry guidance organs shall command the processes of power production, supply and consumption in a unified manner.

Article 64 (Provision of conditions for power dispatching command)

Section titled “Article 64 (Provision of conditions for power dispatching command)”

Power dispatching command may be carried out only by the dispatcher on duty.

Institutions, enterprises, organizations and citizens may not interfere with power dispatching command or violate the rules on entry into the dispatch control room.

Article 65 (Maintaining the rated frequency and prescribed voltage)

Section titled “Article 65 (Maintaining the rated frequency and prescribed voltage)”

Electric power industry guidance organs shall adjust power production, supply and use to maintain the rated frequency and the prescribed voltage.

The relevant institutions, enterprises and organizations are required to obey power dispatching command.

Article 66 (Formation of the power system)

Section titled “Article 66 (Formation of the power system)”

Electric power industry guidance organs shall form and operate the power system rationally so that power can be supplied to end-users in accordance with the supply plan or use limits and loss in transit can be reduced as far as possible.

Article 67 (Output-regulating power stations and fixed-output power stations)

Section titled “Article 67 (Output-regulating power stations and fixed-output power stations)”

The central electric power industry guidance organ and the relevant institution shall determine output-regulating power stations and fixed-output power stations in consideration of the operational characteristics of power stations and the water and fuel supply conditions.

Output-regulating power stations shall obey the requirements of the power system.

Article 68 (Setting of power supply grades)

Section titled “Article 68 (Setting of power supply grades)”

The State shall set power supply grades according to the importance and characteristics of power supply recipients and power consumers.

Power supply grades shall be set by the Cabinet.

Article 69 (Formation of the reserve power system)

Section titled “Article 69 (Formation of the reserve power system)”

Electric power industry guidance organs and the relevant institutions shall supply power in accordance with the grades fixed and form reserve power systems of various types to ensure the reliability of power supply.

Article 70 (Handling of dispatching accidents and prevention of damage from natural hazards)

Section titled “Article 70 (Handling of dispatching accidents and prevention of damage from natural hazards)”

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall adopt modern protection devices in the power system, properly set their setting values, handle accidents safely and prevent damage from natural hazards.

Hydrometeorological organs and the relevant institutions shall inform electric power industry guidance organs of hydrometeorological data, seismic data and the like needed to prevent damage from natural hazards.

Article 71 (Provision of power dispatching command communication)

Section titled “Article 71 (Provision of power dispatching command communication)”

Electric power industry guidance organs and the relevant enterprises shall be equipped with modern communication equipment and carry out power dispatching command.

Communications organs and the relevant institutions, enterprises and organizations shall provide power dispatching command communication at the request of electric power industry guidance organs.

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall, in consideration of the repair cycles of power equipment and the supply conditions, organize the repair of generating equipment, transmission and distribution facilities and power-using facilities simultaneously.

Chapter 8. Operation of the national integrated power management system

Section titled “Chapter 8. Operation of the national integrated power management system”

Article 73 (Establishment of the national integrated power management system)

Section titled “Article 73 (Establishment of the national integrated power management system)”

The national integrated power management system is a system that, under the unified command of the State, monitors, operationally controls and manages the entire process of production and consumption so that the motive power resources of the country are used rationally to maximize power production and the power produced is used effectively.

The central electric power industry guidance organ shall operate the national integrated power management system properly and ensure that voltage, frequency and waveform distortion, which are indicators of the quality of power, are maintained as prescribed.

Article 74 (Formation and operation of the national integrated power management system)

Section titled “Article 74 (Formation and operation of the national integrated power management system)”

The central electric power industry guidance organ shall form the national integrated power management system of the integrated production system for hydropower stations, the integrated production system for thermal power stations and the integrated load management system, in a three-tier structure of resource planning, production management and automatic operational control, and operate it substantively.

Article 75 (Installation of power management technical devices and data communication devices)

Section titled “Article 75 (Installation of power management technical devices and data communication devices)”

Institutions, enterprises and organizations that produce, supply and use power are required to install power management technical devices and data communication devices for the formation of the national integrated power management system and register them with the central electric power industry guidance organ through the relevant local power transmission and distribution organ. In this case, power management technical devices shall be deliberated on and certified by the central electric power industry guidance organ and the relevant quality certification organ.

Article 76 (Normal operation of power management technical devices and data communication devices)

Section titled “Article 76 (Normal operation of power management technical devices and data communication devices)”

Institutions, enterprises and organizations that produce, supply and use power shall properly manage power management technical devices and data communication devices and ensure their normal operation.

The operation of power management technical devices and data communication devices shall be recorded every day.

Article 77 (Inspection of power management technical devices and data communication devices)

Section titled “Article 77 (Inspection of power management technical devices and data communication devices)”

Institutions, enterprises and organizations that produce, supply and use power shall regularly inspect power management technical devices and data communication devices and eliminate defects in good time.

Where an abnormal problem arises in power management technical devices and data communication devices, the central electric power industry guidance organ or the relevant local power transmission and distribution organ shall be notified immediately.

Article 78 (Operation of the data communication network of the national integrated power management system)

Section titled “Article 78 (Operation of the data communication network of the national integrated power management system)”

Electric power industry guidance organs and the relevant institutions, enterprises and organizations shall ensure the normal operation of the data communication network used in the national integrated power management system.

Communications organs and the relevant institutions, enterprises and organizations shall, in liaison with electric power industry guidance organs, take measures in good time against problems arising in the operation of the data communication network.

Article 79 (Security of the national integrated power management system)

Section titled “Article 79 (Security of the national integrated power management system)”

The central electric power industry guidance organ and the relevant institutions, enterprises and organizations shall achieve the security of the national integrated power management system in accordance with the prescribed standards and renew it regularly.

Chapter 9. Guidance and control of work in the power sector

Section titled “Chapter 9. Guidance and control of work in the power sector”

Article 80 (Guidance of work in the power sector)

Section titled “Article 80 (Guidance of work in the power sector)”

Guidance of work in the power sector shall be exercised by the central electric power industry guidance organ and the relevant central organ under the unified guidance of the Cabinet.

The central electric power industry guidance organ and the relevant central organ shall take charge of and guide work in the power sector.

Article 81 (Organization of assessments of the management of power facilities)

Section titled “Article 81 (Organization of assessments of the management of power facilities)”

The central electric power industry guidance organ and the relevant central organ shall give guidance so that power facilities are constructed and operated in accordance with the requirements of technical regulations and the power produced is managed, and shall organize assessments of the management of power facilities every year.

Article 82 (Provision of conditions for work in the power sector)

Section titled “Article 82 (Provision of conditions for work in the power sector)”

The State planning organ, electric power industry guidance organs, labour administration organs, finance organs, banking organs, local people’s committees and the relevant institutions, enterprises and organizations shall give priority to ensuring the supply of the labour force, equipment, fuel, materials, funds and the like needed by the power sector.

The labour force, equipment, fuel, materials, funds and the like of the power sector may not be diverted to other sectors, and the power sector shall not be given social assignments unrelated to power production.

The State shall designate May and October of each year as Electricity Saving Month.

Institutions, enterprises, organizations and citizens shall thoroughly organize electricity saving work during Electricity Saving Month.

Article 84 (Supervision and control of work in the power sector)

Section titled “Article 84 (Supervision and control of work in the power sector)”

Supervision and control of work in the power sector shall be exercised by the central electric power industry guidance organ and the relevant supervision and control organ.

The central electric power industry guidance organ and the relevant supervision and control organ shall properly determine what is subject to power supervision and regularly exercise supervision and control so that institutions, enterprises, organizations and citizens strictly observe the rules on power facility construction, power production, power supply, staggered production organization and command, power use, power dispatching command and operation of the national integrated power management system, and strengthen electricity saving work.

Institutions, enterprises, organizations and citizens shall provide in good time the conditions needed for power supervision work.

Where property damage has been caused by violating this Law, civil liability such as restoration to the original state, compensation for damage or payment of a late payment charge shall be imposed on the party responsible.

Power supply shall be suspended in the following cases:

  1. Where power has been used in excess of the power supply plan or use limit or the power consumption standard
  2. Where power has been used in violation of the rules on the operation of the national integrated power management system and the rules on staggered production
  3. Where power equipment for which permission or registration was not obtained has been installed and used
  4. Where power has been used without installing or using reactive power production equipment and a power metering device, or without making the wiring connection properly
  5. Where the power usage charge has not been paid as prescribed
  6. Where power has been wasted or stealthily stolen
  7. Where power supervision work has been refused or obstructed
  8. Where a power metering device has not been installed at a place that the transmission and distribution organ can objectively verify

Where a structure has been constructed without approval in a power facility protection zone in which transmission and distribution facilities, power communication facilities and the like are installed, the person who constructed it shall be made to dismantle it.

Where power equipment of excessive capacity has been installed or used, or electrical equipment for which permission was not obtained has been used, the equipment, funds and goods used in or obtained through the unlawful act shall be confiscated.

In the following cases, the person concerned shall be made to make restitution for the damage caused:

  1. Where power has been consumed without a power supply plan or without concluding a power supply contract and staggered production contract
  2. Where the power use times under the power supply contract and staggered production contract have not been observed, or power has been consumed in excess of the supply plan
  3. Where the rules on formulating and registering power consumption standards have been violated, or power has been consumed in excess of the power consumption standard
  4. Where a power metering device has been removed without approval, or power has been consumed after making power metering impossible to carry out accurately by fraudulent acts
  5. Where power has been consumed after connecting a power line without approval to transmission and distribution facilities not of one’s own system
  6. Where the national integrated power management system has not been operated properly or its operation has been impeded
  7. Where power equipment for which permission or registration was not obtained has been installed and used, or power has been wasted through failure to carry out electricity saving work properly
  8. Where the power factor has not been maintained in accordance with the State standard

In the following cases, institutions, enterprises, organizations and citizens shall be fined the applicable amounts:

  1. Where power equipment of excessive capacity has been used or power equipment for which permission or registration was not obtained has been used: 300,000 to 1,500,000 won for institutions, enterprises and organizations, and 20,000 to 100,000 won for citizens
  2. Where a power metering device has not been installed or used without good reason, or power has been stealthily stolen without making the wiring connection properly: 1,500,000 won for institutions, enterprises and organizations, and 100,000 won for citizens
  3. Where the rules on staggered production organization have been violated: 500,000 to 1,500,000 won for institutions, enterprises and organizations
  4. Where the power usage charge has not been paid in good time and accurately under an improper reason and pretext: 200,000 to 1,500,000 won for institutions, enterprises and organizations, and 10,000 to 100,000 won for citizens

Article 91 (Penalties of warning, stern warning, unpaid labour, labour education, demotion, dismissal and removal from post)

Section titled “Article 91 (Penalties of warning, stern warning, unpaid labour, labour education, demotion, dismissal and removal from post)”

In the following cases, the person responsible shall be given the penalty of warning or stern warning, or the penalty of unpaid labour or labour education of not more than three months:

  1. Where the quality of power facility construction works has not been ensured, or meeting the commissioning date has been impeded through failure to produce and supply in good time the equipment needed for construction
  2. Where electric wires have been strung or poles erected in a disorderly manner, impeding land management
  3. Where inspection and repair of power facilities or power equipment has not been properly carried out, or power production has been impeded through failure to operate generating equipment in accordance with the requirements of technical regulations and standard operating procedures
  4. Where the power production plan has not been met
  5. Where, without approval, generating equipment has been operated below the dead water level or water of a hydropower station reservoir and waterways has been drawn off and used
  6. Where the protection zones of hydropower stations, waterway tunnels and reservoirs have not been managed properly
  7. Where coal and steam for power production have been used for other purposes without approval, or industrial steam or hot water for urban heating has not been used properly
  8. Where power production has been impeded through failure to supply coal of the prescribed grade and standard to thermal power stations
  9. Where power has been supplied without approval to a unit that has no power supply plan or has not concluded a power supply contract
  10. Where power has been supplied from the own-consumption power system, or an accident has been caused through failure to manage power facilities properly
  11. Where transmission and distribution and power communication facilities have been damaged
  12. Where a power line has been connected without approval to transmission and distribution facilities not of one’s own system
  13. Where the rules on staggered production organization have been violated, impeding production
  14. Where power has not been supplied as prescribed, or the power supplied has not been used for the prescribed objects
  15. Where power equipment of excessive capacity has been used, or power equipment for which permission or registration was not obtained has been used
  16. Where a power metering device has not been installed or used without good reason, or power has been stealthily stolen without making the wiring connection properly
  17. Where a power metering device has been removed without approval, power metering has been made impossible to carry out accurately by fraudulent acts, or the records of power consumption have been omitted
  18. Where the power usage charge has not been collected or paid as prescribed
  19. Where reactive power production equipment has not been installed without good reason
  20. Where electrical equipment of low efficiency grade has been produced or imported
  21. Where power dispatching command has been carried out irresponsibly, power dispatching command has been interfered with or disobeyed, or power dispatching command communication has not been provided in good time
  22. Where a reserve power system has not been formed, or a dispatching accident has not been handled properly
  23. Where the national integrated power management system has not been operated properly
  24. Where power management technical devices or data communication devices have not been installed
  25. Where assessments of the management of power facilities have not been properly carried out
  26. Where the labour force, equipment, fuel, materials, funds and the like of the power sector have been diverted to other sectors, or the power sector has been given social assignments unrelated to power production
  27. Where an unlawful act has been committed in the course of power supervision and management
  28. Where the proper performance of duties by power supervision and management staff has been refused or obstructed

Where the circumstances of an act under items 1 to 28 of the preceding paragraph are grave, the penalty of unpaid labour or labour education of not less than three months, or the penalty of demotion, dismissal or removal from post shall be given.

Where an act in violation of this Law amounts to a crime, criminal liability shall be imposed on the person responsible in accordance with the relevant article of the Criminal Law.