Construction Law of the Democratic People's Republic of Korea

Edition dated 14 June 2022. August 2024 NIS compilation, vol. 2, pp. 42–54

Adopted on 10 December Juche 82 (1993) by Ordinance No. 20 of the Supreme People’s Assembly
Amended and supplemented on 14 January Juche 88 (1999) by Decree No. 350 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 27 September Juche 90 (2001) by Decree No. 2593 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 24 June Juche 91 (2002) by Decree No. 3115 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 19 September Juche 95 (2006) by Decree No. 1968 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 11 December Juche 96 (2007) by Decree No. 2482 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 4 August Juche 98 (2009) by Decree No. 205 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 25 October Juche 100 (2011) by Decree No. 1917 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 23 July Juche 103 (2014) by Decree No. 93 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 23 November Juche 105 (2016) by Decree No. 1421 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 22 March Juche 106 (2017) by Decree No. 1618 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 24 August Juche 106 (2017) by Decree No. 1873 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 17 November Juche 107 (2018) by Decree No. 2457 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 9 February Juche 108 (2019) by Decree No. 2598 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 23 June Juche 108 (2019) by Decree No. 60 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 26 September Juche 108 (2019) by Decree No. 115 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 15 March Juche 109 (2020) by Decree No. 251 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 8 October Juche 109 (2020) by Decree No. 437 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 30 April Juche 110 (2021) by Decree No. 611 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 29 March Juche 111 (2022) by Decree No. 920 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 14 June Juche 111 (2022) by Decree No. 990 of the Standing Committee of the Supreme People’s Assembly

Source · Republic of Korea National Intelligence Service, Compilation of North Korean Laws (북한법령집), August 2024, vol. 2, pp. 42–54.

The first draft of this translation was produced with AI assistance.

Chapter 1. Fundamentals of the Construction Law

Section titled “Chapter 1. Fundamentals of the Construction Law”

Article 1 (Mission of the Construction Law)

Section titled “Article 1 (Mission of the Construction Law)”

The Construction Law of the Democratic People’s Republic of Korea contributes to ensuring a high speed of socialist expanded reproduction and to improving the material and cultural life of the people, by strictly establishing discipline and order in drawing up and implementing master plans for construction, in construction design and construction execution, and in the completion inspection of structures.

Article 2 (Basic principle in the field of construction)

Section titled “Article 2 (Basic principle in the field of construction)”

In the Democratic People’s Republic of Korea, in accordance with a correct construction policy, great efforts are being devoted to urban and rural construction, port construction, irrigation construction and the like, numerous monumental architectural structures of lasting design, modern factories, enterprises, dwelling houses and facilities are being built, and excellent conditions for an independent and creative life are provided for the people.

The State shall consolidate the achievements made in the construction sector and, while ensuring a balance between productive construction and non-productive construction, shall build urban dwelling houses and rural cultural houses for the people at State expense.

Article 3 (Principle of planning of construction)

Section titled “Article 3 (Principle of planning of construction)”

Construction is an important undertaking that continues permanently.

The State shall bring construction under unified control and carry it out in a planned manner with a long-term view.

It is the consistent principle of the State to make the aspirations, demands and convenience of the people come first in construction, and to ensure perfectly both the ideological and artistic quality and the practicality of construction in keeping with the sentiments and aesthetic sense of the people.

The State shall ensure that, by embodying the people-first principle in construction, firmly upholding Juche character, correctly combining national character and modernity, making architecture political and policy-oriented, bringing originality to life on the principles of convenience first, aesthetics first and the view of later generations first, and ensuring practicality and functionality, monumental architectural structures that surpass the world level and remain beyond reproach in the distant future are erected at an extraordinarily fast speed.

Article 5 (Principle of concentration and improved effectiveness of construction)

Section titled “Article 5 (Principle of concentration and improved effectiveness of construction)”

The State shall ensure that, in construction, the order of priority is properly determined, the principle of constructing the infrastructure first and the superstructure afterwards is thoroughly observed, and forces are concentrated on the construction of important projects, so that structures are commissioned on schedule and the economic effectiveness of investment is raised.

Article 6 (Principle of specialization, industrialization and modernization of construction)

Section titled “Article 6 (Principle of specialization, industrialization and modernization of construction)”

The State shall ensure that, by speeding up the technical revolution, the material and technical foundation of the construction sector is strengthened, and the specialization, industrialization and modernization of construction are achieved at a high level.

Article 7 (Principle of regularization and normalization of construction)

Section titled “Article 7 (Principle of regularization and normalization of construction)”

The State shall ensure that, by regularizing and normalizing construction, the system and order are established in construction work, and, on the principle of quality first and quantity afterwards, the quality of structures and the speed of construction are raised and the cost of construction is lowered.

Article 8 (Principle of scientification of construction)

Section titled “Article 8 (Principle of scientification of construction)”

The State shall ensure that science and technology talents needed in the construction sector are trained with a long-term view, scientific research is strengthened, and achievements of advanced science and technology, such as dry construction methods, green architecture and intelligent architecture, are actively adopted in construction.

Article 9 (Exchange and cooperation in the field of construction)

Section titled “Article 9 (Exchange and cooperation in the field of construction)”

The State shall develop exchange and cooperation with many countries of the world and international organizations in the field of construction.

Article 10 (Master plan for construction and its classification)

Section titled “Article 10 (Master plan for construction and its classification)”

The master plan for construction is a comprehensive long-term plan for rationally locating and building construction projects in a planned manner.

The master plan for construction is classified into the master plan for industrial construction, the master plan for city and village construction, and sector-specific master plans for construction.

Article 11 (Basis for drawing up the master plan for construction)

Section titled “Article 11 (Basis for drawing up the master plan for construction)”

The master plan for construction shall be drawn up, according to the project, on the basis of the master plan for land construction or the master plan for city construction.

A construction client institution, enterprise or organization that intends to draw up a master plan for construction shall obtain a construction site designation document or a land development approval document from the land and environment protection organ. In the case of a project to be built within an approved master plan area for construction, it shall obtain a construction plot specification document without obtaining a construction site designation document or a land development approval document, and then draw up the master plan for construction of the project.

Article 12 (Principles for drawing up the master plan for construction)

Section titled “Article 12 (Principles for drawing up the master plan for construction)”

The following principles shall be observed in drawing up the master plan for construction:

  1. Provision shall be made for preserving revolutionary battle sites and revolutionary historic sites for ever.
  2. Provision shall be made for preserving historical relics, remains and natural monuments properly.
  3. The direction and scale of construction shall be fixed with consideration of the growing material and cultural needs of the people and the demands of economic development.
  4. Factories and enterprises shall be located close to sources of raw materials and fuel and to places where products are consumed.
  5. The size of cities shall be fixed appropriately, and satellite cities shall be rationally located around large cities, including the capital.
  6. Existing buildings and facilities shall be used rationally, and achievements of advanced science and technology shall be widely adopted.
  7. Natural resources shall be protected, and cities and villages shall not be located in zones where useful minerals are deposited.
  8. Mountain slopes and underground space shall be used as fully as possible so as not to encroach on arable land.
  9. Juche character, national character and modernity shall be combined, and political character, cultured character, three-dimensionality, non-repetitiveness and unity shall be ensured.
  10. Buildings of other styles shall not be located in zones for the preservation of Korean-style buildings.
  11. Construction of the infrastructure, such as the storm-water network, the water supply and sewerage network, the heating network, the gas supply network, the power transmission and distribution network and the communications network, shall be given priority, and a modern transport network shall be rationally located.
  12. The forms of buildings, including dwelling houses, shall be made diverse according to project and locality so that their own distinctive features may come to life. In this case, flat roofs are encouraged for buildings constructed in plains.
  13. Buildings shall not be arranged in a fence style; the rear of buildings shall be made clearly visible from the street side through the gaps between buildings, so as to give a three-dimensional feel to the formation of the city.
  14. Roads within residential blocks shall be laid with two lanes so that vehicles can pass each other, green spaces, roadside trees, street lamps, footpaths and bicycle paths shall be located beside them, and buildings shall be set after that.
  15. Green space plots shall be rationally formed between buildings to create a natural environment favourable to the life of residents and to prevent pollution.
  16. Architectural structures shall be made multifunctional so as to maximize their utilization rate.
  17. The floor area of buildings and the separation distance between buildings shall be fixed scientifically, in keeping with their mission and the purpose of construction and with comprehensive consideration of such matters as the hygienic conditions, fire safety conditions, disaster prevention conditions and management conditions that accord with the characteristics of the area and the building, so as to maximize the utilization rate of the construction plot.
  18. Natural-geographical conditions and climate and natural features shall be taken into account, and damage from typhoons, floods, landslides, tidal waves, earthquakes and the like shall be avoided.
  19. National defence requirements shall be observed.

Article 13 (Drawing up the master plan for construction)

Section titled “Article 13 (Drawing up the master plan for construction)”

The master plan for construction shall be drawn up by a specialized construction design institution or enterprise on the order of the construction client institution, enterprise or organization.

The Cabinet shall organize the drawing up of the master plan for construction of projects of national importance.

Before ordering a master plan for construction, the construction client institution, enterprise or organization shall, according to the project, have an environmental impact assessment, radiation safety inspection, water quality inspection and seismic safety assessment carried out for the construction plot.

The construction design institution or enterprise shall reach agreement on the master plan for construction it has drawn up with the construction client institution, enterprise or organization and with the relevant institutions, including the water supply and sewerage, electricity, communications and State geodetic point management organs, and then have the plan deliberated on and approved.

Article 14 (Deliberation and approval of the master plan for construction)

Section titled “Article 14 (Deliberation and approval of the master plan for construction)”

The master plan for construction shall, according to the project, be approved by the Cabinet or the central design guidance organ after deliberation by the central design guidance organ, the relevant non-standing construction deliberation committee and the relevant institution.

The master plan for construction may not be altered without approval.

Article 15 (Determination of the construction priority order)

Section titled “Article 15 (Determination of the construction priority order)”

The State planning organ and the construction client institutions, enterprises and organizations shall determine the construction priority order and draw up construction plans in accordance with the approved master plan for industrial construction, master plan for city and village construction and sector-specific master plans for construction.

Where dwelling houses already in existence must be demolished under the master plan for construction, the construction priority order shall be determined so that the construction of dwelling houses for residents of the dwelling houses to be demolished is given priority.

Article 16 (Issue of the construction specification document)

Section titled “Article 16 (Issue of the construction specification document)”

A construction client institution, enterprise or organization that intends to carry out the master plan for construction shall submit a written application for the issue of a construction specification document to the relevant construction supervision organ and, going through the prescribed procedures, obtain the construction specification document. In this case, if the agreement of the relevant institutions, including the local people’s committee and the water supply and sewerage, electricity, communications and State geodetic point management organs, and the environmental impact assessment, radiation safety inspection, water quality inspection and seismic safety assessment of the construction plot have already been obtained at the master plan stage for a project, the applicant shall, before applying for the issue of the construction specification document, obtain again only the agreement of the water supply and sewerage management organ of the area concerned and, according to the project, the environmental impact assessment.

The construction specification document shall be issued by the construction supervision organ. The construction specification document for a particularly important project shall be issued by the State construction supervision organ after obtaining the approval of the Cabinet.

Article 17 (Drawing up and endorsement of layout plans and design drafts)

Section titled “Article 17 (Drawing up and endorsement of layout plans and design drafts)”

Before the master plan for construction and the construction specification document are drawn up, the construction design institution or enterprise shall draw up the layout plan and design draft of the construction project concerned and have both deliberated on and endorsed as prescribed. In this case, a layout plan or design draft that runs counter to the construction policy of the State and the prescribed standards, including one that does not provide the conditions for traffic safety, may not be submitted for deliberation, and the relevant deliberation organ shall have the defects raised in the course of deliberation corrected and then submit the plan or draft for central endorsement.

Land within an approved master plan area for construction becomes a construction plot.

A construction client institution, enterprise or organization shall obtain land use permission in keeping with the construction priority order.

The relevant institution shall grant land use permission on the basis of the construction site designation document, the land development approval document or the construction specification document.

Good construction design is the prerequisite for ensuring the safety and quality of structures.

The State shall ensure that the system of carrying out design on the basis of a three-party agreement of the design, construction and operation units is strictly established, the level of scientification of design is decisively raised, design capacity is strengthened and used rationally, and design is firmly put ahead of construction.

Construction design shall be drawn up by a specialized construction design institution or enterprise.

The construction client institution, enterprise or organization and the relevant design institution or enterprise shall conclude a design contract.

Article 21 (Provision of the technical assignment document and the construction specification document)

Section titled “Article 21 (Provision of the technical assignment document and the construction specification document)”

The construction client institution, enterprise or organization shall provide the construction design institution or enterprise with the technical assignment and the construction specification document.

The technical assignment document shall be drawn up in accordance with the prescribed standards and shall be examined and approved by the relevant technical assignment document examination organ. In this case, the technical assignment document of an underground resource development project, or of a factory to be newly built or reconstructed and modernized, shall, according to the project, be submitted to the relevant technical assignment document examination organ after deliberation by the Non-standing Resources Development Deliberation Committee or science and technology deliberation by the science and technology administration guidance and management organ.

A technical assignment document that has been examined and approved may not be altered at will.

The standards, procedures and methods for drawing up, examining and approving technical assignment documents shall be as separately prescribed.

Construction design shall be drawn up in the stages of assignment design, technical design and working design, in conformity with the examined and approved technical assignment document.

Before drawing up the design, the construction design institution or enterprise shall carry out a survey and geological investigation and then have the results deliberated on and approved, and shall determine a rational design plan by calculating economic effectiveness and design the project in a new, distinctive and creative manner in keeping with the demands of the new century.

Article 23 (Ensuring the quality of design)

Section titled “Article 23 (Ensuring the quality of design)”

The construction design institution or enterprise shall, in design, embody socialist content in national form, make the design practical in keeping with world trends and the mission and use of the construction project, give it diverse forms so that each locality can bring out its own distinctive features while ensuring political and cultured character, and ensure its quality at the highest level so that aesthetics and convenience are ensured while the least possible construction funds are spent. In this case, it shall strictly observe the technical and engineering requirements and the prescribed standards in the design of every aspect, including architectural acoustics, electricity and heating, including meeting the standards for structural stability, water supply pressure and architectural lighting.

The technical and engineering requirements and standards to be observed in drawing up design shall be as separately prescribed.

Article 24 (Project responsibility system in drawing up design)

Section titled “Article 24 (Project responsibility system in drawing up design)”

The construction design institution or enterprise shall apply the project responsibility system in drawing up design and shall be responsible for the implementation of the design.

Article 25 (Design joint appraisal meeting)

Section titled “Article 25 (Design joint appraisal meeting)”

The construction design institution or enterprise shall complete the design it has drawn up after receiving the opinions of the design joint appraisal meeting.

Designers shall take part in the design joint appraisal meeting, and scientists, technicians and specialists of the relevant sector may also take part as needed.

Article 26 (Examination of and agreement on design)

Section titled “Article 26 (Examination of and agreement on design)”

The construction design institution or enterprise shall, on the design it has drawn up, conclude sector-by-sector agreements, according to the prescribed items, with the relevant institutions, including the construction client, the construction contractor institution, enterprise or organization.

Sector-by-sector agreements shall be made by specialist officials of the relevant sector going to the design institution or enterprise at least once a week to examine the design and agree on it.

Article 27 (Deliberation and approval of design)

Section titled “Article 27 (Deliberation and approval of design)”

Construction design shall, according to the scale and importance of the design project, be deliberated on and approved by the design guidance organ of the province (municipality directly under central authority), the central design guidance organ or the relevant institution.

The relevant design deliberation and approval organ shall carefully consider in its deliberation whether the construction design has been prepared in conformity with the construction policy of the State, the latest architectural technology, the characteristics of the locality and the project, and the prescribed standards, whether it has been prepared so as to maximize the area utilization rate and plot utilization rate and ensure practical benefit, and whether it has been prepared in conformity with the three-party agreement of the design, construction and operation units, and shall approve or reject it.

Construction may not be carried out on the basis of an unapproved construction design, and an approved construction design may not be altered at will.

Where a construction design is to be amended in the course of construction execution, the construction design shall again be deliberated on and approved by the relevant design deliberation and approval organ. In this case, for a factory to be newly built or reconstructed and modernized, the technical assignment document shall also be examined again under Article 21 of this Law.

Article 28 (Design of overseas construction projects, export design and import design)

Section titled “Article 28 (Design of overseas construction projects, export design and import design)”

The approval procedures for the design of overseas construction projects, export design and import design shall be separately prescribed.

The construction design institution or enterprise shall, as soon as the construction of a project is finished, conduct a design review of the completed structure. In this case, it shall examine and review such matters as design defects and the status of their elimination, the status of design changes according to the conditions of the works, and the status of execution of the design budget.

Article 30 (Organization of construction contractor institutions and enterprises)

Section titled “Article 30 (Organization of construction contractor institutions and enterprises)”

Construction execution is an important undertaking for erecting structures and is the basic stage of construction.

The State shall organize construction contractor institutions and enterprises by construction sector and ensure that the sense of responsibility in construction execution is heightened.

Article 31 (Dovetailing project construction plans)

Section titled “Article 31 (Dovetailing project construction plans)”

The State planning organ shall closely dovetail project construction plans for the construction client and for the construction contractor institutions, enterprises and organizations.

A project that has not been dovetailed with the construction plan, or for which less than 50 per cent of the construction materials have been prepared, may not be executed.

The construction permit shall be granted by the construction supervision organ. The construction permit for a particularly important project shall be granted by the Cabinet.

The construction permit organ shall carefully examine and verify such matters as the status of restoration by substitute land, whether the project has been dovetailed with the construction plan, the infrastructure capacity of the construction project, the execution capacity and execution conditions of the construction contractor institution, enterprise or organization, the utilization rate of the architectural structure, and the effect of construction on the environment, and shall grant the construction permit only if the prescribed standards are met.

Construction may not be started without obtaining a construction permit.

Article 33 (Clearing of the construction plot)

Section titled “Article 33 (Clearing of the construction plot)”

The local people’s committee and the construction client institution, enterprise or organization shall demolish or relocate unnecessary buildings and facilities within the plot for which a construction permit has been obtained, and shall ensure the normal operation of facilities such as roads and water supply and sewerage. Where dwelling houses already in existence are to be demolished, dwelling houses shall first be built and residents of the dwelling houses to be demolished moved into them, and demolition shall be carried out afterwards.

The construction client and the construction contractor institution, enterprise or organization shall conclude an execution contract on the basis of the construction plan and are required to perform it.

Article 35 (Organization and guidance of construction execution)

Section titled “Article 35 (Organization and guidance of construction execution)”

The construction contractor institution, enterprise or organization shall observe the following requirements in organizing and guiding construction execution:

  1. Before construction execution, it shall set up temporary structures to be used by the builders, such as bedrooms, dining halls, toilets and bathing facilities, in conformity with sanitary and anti-epidemic requirements, and provide sufficient lodging, board and living conditions for the builders.
  2. It shall carry out construction execution as the design, technical regulations and construction methods require.
  3. It shall equip itself with efficient construction equipment and tools and implements, actively adopt modern construction methods and quality construction materials, and raise the technical and skill level, so as to ensure the quality of structures and meet the commissioning date.
  4. It shall keep area clearing in step with construction execution and carry out tree planting and the creation of green spaces at the same time.
  5. It shall install barrier screens around the work site to ensure traffic safety and cultured character.
  6. It shall not destroy or pollute the surrounding environment in the course of construction execution.
  7. It shall ensure that the builders conduct their life in a cultured and hygienic way in accordance with the established rules and norms, and that wastewater and waste produced in the course of life are not discarded recklessly but are purified before discharge or sent to prescribed places for treatment.
  8. It shall remove the temporary structures in good time after construction is finished and clear away untidy traces in the surroundings.

Article 36 (Process-by-process deliberation, quality inspection of construction execution, and confirmation of works done)

Section titled “Article 36 (Process-by-process deliberation, quality inspection of construction execution, and confirmation of works done)”

The construction supervision organ shall establish a process-by-process deliberation system in keeping with the scale and characteristics of the construction project, and before the execution of each process shall deliberate on such matters as whether the technical design was drawn up in conformity with the endorsed layout plan, design draft and design and engineering requirements, and whether materials, equipment, formwork and tools and implements suited to the construction method have been prepared.

The construction client, the construction contractor institution, enterprise or organization and the construction supervision organ shall station inspectors and supervisors at the construction site and strictly inspect, at all stages of quality inspection of construction execution, such as in-process inspection, interim inspection and comprehensive inspection, whether structures have been executed as the approved design, technical regulations and construction methods require.

The construction supervision organ shall confirm works done only for processes that have passed the quality inspection, and shall supervise and control the consumption of construction materials and supplies.

Quality inspection and confirmation of works done may not be carried out for a process that has not undergone process-by-process deliberation, and the works of the next process may not be continued where the process has not undergone or has not passed quality inspection.

Article 37 (Supply of construction materials and project equipment)

Section titled “Article 37 (Supply of construction materials and project equipment)”

The State planning organ and the relevant institutions, enterprises and organizations shall ensure the supply, before construction execution begins, of construction materials and project equipment that meet the requirements of the design and construction method and whose quality is guaranteed. Where construction materials and project equipment are to be supplied, they shall, as prescribed, reach a technical agreement on technical requirements with the relevant institutions, including the design institution or enterprise, and then conclude a supply contract.

No person may require others to provide, from their own resources, funds and materials that the State is to provide, carry out works by arbitrarily adding funds and materials beyond those planned by the State, or divert funds, materials or project equipment to other uses.

Article 38 (Mechanization and automation of construction work)

Section titled “Article 38 (Mechanization and automation of construction work)”

The construction contractor institution, enterprise or organization shall set up bases for the production of aggregate and structural members and bases for the production and repair of construction machinery, increase the production of aggregate and structural members, and mechanize, comprehensively mechanize and automate construction work.

The relevant institutions and enterprises shall produce and supply the various modern construction machinery and equipment and tools and implements needed for construction.

Chapter 5. Completion inspection of structures

Section titled “Chapter 5. Completion inspection of structures”

Article 39 (Basic requirement for completion inspection)

Section titled “Article 39 (Basic requirement for completion inspection)”

Completion inspection is an important stage at which a completed structure is given its final assessment.

The State shall ensure that the completion inspection of structures is carried out strictly at the construction site.

Article 40 (Method of completion inspection)

Section titled “Article 40 (Method of completion inspection)”

Completion inspection shall be carried out when a structure is completed.

Completion inspection may be carried out sector by sector or stage by stage according to the characteristics of the construction project.

Article 41 (Application for completion inspection)

Section titled “Article 41 (Application for completion inspection)”

The construction contractor institution, enterprise or organization shall finish construction execution and the no-load trial run of the equipment and notify the construction client institution, enterprise or organization of the completion of the structure.

The construction client institution, enterprise or organization shall carry out the load trial run of the equipment, have the relevant institutions conduct environmental and safety inspections and assessments, such as inspections of water quality, indoor environmental pollution and radiation safety, as well as an environmental impact assessment and a seismic safety assessment, then verify readiness for completion inspection, and submit a written application for completion inspection to the construction supervision organ. In this case, for a factory to be newly built or reconstructed and modernized, it shall submit the written application for completion inspection only after the science and technology administration guidance and management organ has examined and confirmed, at the load trial run stage, whether the factory was constructed as required by the technical assignment document.

Article 42 (Completion inspection committee)

Section titled “Article 42 (Completion inspection committee)”

The construction supervision organ shall organize a completion inspection committee with representatives of the construction client, the construction contractor and the design institution, enterprise or organization, and with officials of the relevant specialized sector.

The completion inspection committee shall inspect the following matters:

  1. Whether the approval documents, technical documents, inspection documents and the like relating to construction are complete
  2. Whether the approved construction design, technical regulations and construction method requirements have been observed
  3. Whether qualitative indicators such as the structural safety, aesthetics and environmental indicators of the structure and the capacity, reliability and safety of the equipment have been met
  4. How the construction design budget has been executed and how materials and supplies have been consumed
  5. Whether the structure is ready for operation

Article 43 (Evaluation of the results of completion inspection)

Section titled “Article 43 (Evaluation of the results of completion inspection)”

The completion inspection committee shall evaluate the results of completion inspection as pass or fail.

The construction contractor, the construction client institution, enterprise or organization, and the project equipment production institution or enterprise are required to carry out the actions specified in the completion inspection within the prescribed period.

Article 44 (Issue of the notice of passing completion inspection)

Section titled “Article 44 (Issue of the notice of passing completion inspection)”

The construction supervision organ shall issue a notice of passing completion inspection for a structure that has passed the completion inspection.

The construction contractor and the construction client institution, enterprise or organization that have received the notice of passing completion inspection shall hand over and take over the structure.

A structure that has not undergone completion inspection or has not passed the completion inspection may not be commissioned or used.

Article 45 (Quality guarantee of structures)

Section titled “Article 45 (Quality guarantee of structures)”

The construction contractor institution, enterprise or organization and the relevant institution or enterprise shall guarantee the quality of structures for the prescribed period.

For accidents occurring during the quality guarantee period of a structure, the relevant institution, enterprise or organization is liable according to the result of the technical expert examination by the construction supervision organ.

Chapter 6. Guidance and control of construction work

Section titled “Chapter 6. Guidance and control of construction work”

Article 46 (Basic requirement for guidance and control of construction work)

Section titled “Article 46 (Basic requirement for guidance and control of construction work)”

Proper guidance and control of construction work is an important guarantee for correctly implementing the construction policy of the State.

The State shall ensure that the guidance system for construction work is improved and control is further strengthened in keeping with the requirements of the development of reality.

Article 47 (Guidance organs of construction work)

Section titled “Article 47 (Guidance organs of construction work)”

Guidance of construction work shall be exercised by the relevant central organ and the local people’s committee under the unified guidance of the Cabinet.

The Cabinet, the relevant central organ and the local people’s committee shall strengthen construction forces, improve the level of construction equipment, constantly overhaul the organizational system and work system, regularly keep track of the commencement of project construction and the use of construction labour, equipment, materials and funds, and give guidance so as to reduce unfinished construction and carry out the construction plan without fail.

Article 48 (Cooperative construction execution)

Section titled “Article 48 (Cooperative construction execution)”

The State planning organ and the construction contractor institutions, enterprises and organizations shall correctly allocate shares of cooperative construction execution for important construction projects, direct construction execution properly and observe cooperative construction execution discipline.

The finance and banking organ and the construction contractor institutions, enterprises and organizations shall apply the in-kind assessment system so as to raise the quality of construction execution, economize labour, materials and funds, and shorten the construction period.

Article 50 (Construction scientific research work)

Section titled “Article 50 (Construction scientific research work)”

The science and technology administration guidance and management organ and the relevant institutions shall strengthen construction scientific research work, and shall solve in good time the scientific and technical problems arising in construction, including research on new design methods such as advanced construction structural schemes and scientific calculation methods and on modern construction execution methods, and the research, development and introduction of quality and diverse construction materials and efficient construction equipment and tools and implements.

The construction contractor institutions, enterprises and organizations and the relevant institutions shall actively adopt the achievements made in construction scientific research work.

Article 51 (Establishment and application of construction standards)

Section titled “Article 51 (Establishment and application of construction standards)”

The State construction supervision organ shall properly set construction standards on the basis of trends in architectural development, achievements of advanced construction science and technology and construction experience, and ensure that they are correctly applied to construction design and construction execution.

Article 52 (Supervision and control of construction work)

Section titled “Article 52 (Supervision and control of construction work)”

Supervision and control of construction work shall be exercised by the construction supervision organ and the relevant supervision and control organ.

The construction supervision organ and the relevant supervision and control organ shall strictly supervise and control to prevent acts violating the prescribed construction standards and construction methods in design and construction execution, and illegal construction carried out without the approval of the State.

Article 53 (Penalty of fine, restitution, suspension of qualification, downgrading of qualification and deprivation of qualification)

Section titled “Article 53 (Penalty of fine, restitution, suspension of qualification, downgrading of qualification and deprivation of qualification)”

Where a technical assignment document, construction specification document or design has not been properly drawn up or deliberated on, construction has not been properly executed, or damage has been caused to the property of the State and social cooperative organizations, the responsible institution, enterprise or organization shall be given the penalty of a fine or the penalty of restitution.

Where a person holding a construction technical qualification has used it to commit an unlawful act, the person shall be given, according to the circumstances, the penalty of suspension of qualification, downgrading of qualification or deprivation of qualification.

Article 54 (Suspension of works, confiscation of structures, demolition of structures, recovery of documents, deprivation of authority and suspension of supply of funds)

Section titled “Article 54 (Suspension of works, confiscation of structures, demolition of structures, recovery of documents, deprivation of authority and suspension of supply of funds)”

In the following cases, the works shall be suspended, and the structure shall be confiscated or ordered to be demolished, or the construction documents shall be recovered, or the authority of the construction client or construction contractor shall be revoked, or the supply of construction funds shall be suspended:

  1. Where construction has been carried out without the approval of the State
  2. Where construction has been carried out in violation of the master plan for construction
  3. Where the floor area of a building has been made larger than the prescribed standard
  4. Where construction has not been executed in accordance with the design or to the required standard of quality, making it impossible to meet the design requirements and ensure structural safety
  5. Where construction has been carried out without undergoing in-process inspection or without eliminating defects that caused it to fail in-process inspection
  6. Where a unit or individual other than a specialized construction enterprise has been contracted to carry out the construction and has done so
  7. Where construction has not begun within one year of obtaining a construction permit, or where, without good reason, construction has not progressed properly for several years, causing harm to the life of the people

Article 55 (Penalties of warning, stern warning, unpaid labour, labour education, demotion, dismissal and removal from post)

Section titled “Article 55 (Penalties of warning, stern warning, unpaid labour, labour education, demotion, dismissal and removal from post)”

In the following cases, the person responsible shall be given the penalty of warning or stern warning, or the penalty of unpaid labour or labour education of not more than three months:

  1. Where construction has been carried out without the approval of the State, or the master plan for construction has not been properly drawn up or has been altered without approval, impeding the implementation of the construction policy of the State
  2. Where the rules on issuing construction site designation documents, land development approval documents or construction specification documents, or on granting land use permission, have been violated
  3. Where the technical assignment document has not been properly drawn up or examined, or an examined and approved technical assignment document has been recklessly altered, impeding design and works or wasting labour, materials or funds
  4. Where the rules on drawing up, deliberating on and approving designs have been violated, including by drawing up a design that does not conform to the examined and approved technical assignment document or by failing to ensure design quality, impeding construction or wasting labour, materials or funds
  5. Where the rules on prescribed agreements, environmental impact assessment, radiation safety inspection, water quality inspection or seismic safety assessment have been violated
  6. Where the project construction plan has not been properly dovetailed, the construction permit has not been properly granted, or construction has been carried out without the required construction plan or construction permit
  7. Where the execution contract has not been concluded or performed as prescribed, or a unit or individual other than a specialized construction enterprise has been contracted to carry out the construction and has done so
  8. Where construction has been executed on the basis of an unapproved design, contrary to the requirements of the construction specification document, design, technical regulations and construction method, without the required process-by-process deliberation or quality inspection, or where the use of materials that do not conform to the design and construction method or whose quality is not guaranteed has resulted in a failure to ensure the quality of the structure or in waste of labour, materials or funds
  9. Where a project has not been commissioned on schedule without good reason, or construction has not proceeded for several years after it began, impeding the implementation of the construction policy of the State
  10. Where failure to provide the builders with the prescribed lodging, board and living conditions, such as bedrooms, dining halls, toilets and bathing facilities, before construction execution has caused them to live in an uncultured and unhygienic way, where failure to take labour safety measures has caused an accident, or where the surrounding environment has been destroyed or polluted in the course of construction execution
  11. Where the quality inspection of construction execution or the completion inspection has not been carried out properly
  12. Where defects that appeared during quality inspection, completion inspection or the quality guarantee period have not been eliminated within the prescribed period, or where a structure that did not undergo or did not pass completion inspection has been commissioned, used or illicitly traded, or caused to be commissioned or used
  13. Where works on a permitted project have been impeded by obstructing them under unreasonable conditions or by refusing to comply with demolition requirements
  14. Where temporary structures have been used for a different purpose or after transfer or takeover, or have been illicitly traded, instead of being demolished after the works were finished
  15. Where failure to give agreement, conduct deliberation, grant approval or take like action on construction in good time has impeded implementation of the construction policy of the State
  16. Where others have been required to provide, from their own resources, funds and materials that the State is to provide, or works have been carried out by arbitrarily adding funds and materials beyond those planned by the State
  17. Where construction funds, materials or supplies have been illegally dealt with, damaged, spoiled, diverted, lost, mislaid, illicitly traded or left idle
  18. Where works have continued despite an order to suspend them

Where an act under the preceding paragraph has been committed repeatedly, or has caused property loss of about 20,000 won or more, the penalty of unpaid labour or labour education of not less than three months, or the penalty of demotion, dismissal or removal from post shall be given.

Where an act in violation of this Law amounts to a crime, criminal liability shall be imposed on the person responsible in accordance with the relevant article of the Criminal Law.