Chapter 1. Fundamentals of the Lock Gates Law

Section titled “Chapter 1. Fundamentals of the Lock Gates Law”

The Lock Gates Law of the Democratic People’s Republic of Korea contributes to using water resources comprehensively and developing transport and traffic by strictly establishing the system and order in the construction, management and operation of lock gates.

Article 2 (Principle of construction of lock gates)

Section titled “Article 2 (Principle of construction of lock gates)”

Lock gates are a creation of the great plan for ten thousand years and a precious wealth of the country.

The State shall ensure that investment in the construction of lock gates is increased systematically and that new lock gates are constructed with a long-term view.

Article 3 (Principle of management of lock gates)

Section titled “Article 3 (Principle of management of lock gates)”

Managing lock gates properly is a prerequisite for ensuring the regular operation of lock gates.

The State shall ensure that lock gate management is modernized and put on a scientific basis.

Article 4 (Principle of operation of lock gates)

Section titled “Article 4 (Principle of operation of lock gates)”

Lock gate operation is an important undertaking that involves handling lock gate equipment and allowing means of transport to pass through.

The State shall ensure that the lock gate operation system is properly established and that its operation is regularized and standardized.

Article 5 (Principle of scientific research and training of personnel in the lock gate sector)

Section titled “Article 5 (Principle of scientific research and training of personnel in the lock gate sector)”

The State shall ensure that research work is strengthened to solve the scientific and technical problems arising in the construction, management and operation of lock gates, and that the necessary personnel are trained with a long-term view.

Article 6 (Exchange and cooperation in the field of lock gate work)

Section titled “Article 6 (Exchange and cooperation in the field of lock gate work)”

The State shall develop exchange and cooperation with other countries and international organizations in the field of lock gate work.

Article 7 (Scope of application of the Law)

Section titled “Article 7 (Scope of application of the Law)”

This Law applies to institutions, enterprises, organizations and citizens that construct, manage, operate or use lock gates.

This Law also applies to the means of transport and individuals of another country that use lock gates.

Article 8 (Basic requirement for construction of lock gates)

Section titled “Article 8 (Basic requirement for construction of lock gates)”

Proper construction of lock gates is an important condition for increasing transport capacity, using water resources rationally and making the scenery of the land beautiful.

The State planning organ and the relevant institution shall construct lock gates according to plan, in accordance with the master plan for land construction.

Lock gate design shall be carried out by the relevant design institution.

The lock gate construction client organ shall accurately assign the technical task to the relevant design institution.

Article 10 (Determination of the scale and location of lock gates)

Section titled “Article 10 (Determination of the scale and location of lock gates)”

The lock gate construction client organ and the relevant institution shall determine the scale and location of a lock gate by assessing the hydraulic structures, ground exploration data, hydrological regime and hydraulic model test data, cargo flow volume, water demand, construction conditions and operating conditions of the lock gate, and the like.

The lock gate design institution and the relevant institution shall design a lock gate taking into account such matters as provision for transport and the supply of water for irrigation, industry and domestic use, the use of hydropower resources, the handling of sediment, floods and stagnant water, and changes in the ecological environment of the lock gate waters and measures for preventing pollution.

The design shall be approved by the relevant institution.

Article 12 (Orders and contracts for construction of lock gates)

Section titled “Article 12 (Orders and contracts for construction of lock gates)”

Lock gate construction shall be carried out under orders and contracts between the construction client organ and the construction contractor organ.

Where necessary, lock gate construction may also be carried out directly by the construction client organ.

Article 13 (Observance of technical regulations and construction methods in construction of lock gates)

Section titled “Article 13 (Observance of technical regulations and construction methods in construction of lock gates)”

In lock gate construction, the lock gate construction contractor organ shall properly determine the sequence of work processes, strictly observe the technical regulations and construction methods, and ensure the quality of the work.

Where the work has failed the quality inspection, work on the next stage may not proceed.

Article 14 (Construction of lock gate structures)

Section titled “Article 14 (Construction of lock gate structures)”

Structures such as a lock chamber, overflow embankment, stilling structure, approach channel, lock chamber guide section, water supply and drainage facilities, mooring place and fishway shall be constructed at a lock gate.

A lighthouse, control tower, bridge structures and a power station may be constructed at a large-scale lock gate.

Article 15 (Installation of lock gate equipment)

Section titled “Article 15 (Installation of lock gate equipment)”

Sluice gates, repair gates, watertight devices and hoisting equipment shall be installed at a lock gate.

Auxiliary equipment such as mooring equipment, guide equipment and pumps shall also be installed.

Article 16 (Opening of ship routes and deployment of ships needed for lock gate operation)

Section titled “Article 16 (Opening of ship routes and deployment of ships needed for lock gate operation)”

A large-scale lock gate whose reservoir basin is wide and which is significant for water transport may be provided with dredgers, pilot boats, tugboats, icebreakers, oil and refuse collection vessels and hydrological observation vessels needed for opening ship routes and operating the lock gate.

Article 17 (Installation of equipment needed for lock gate operation)

Section titled “Article 17 (Installation of equipment needed for lock gate operation)”

Signalling equipment, aids to navigation and command and communication means for lock gate operation shall be installed in the lock gate area.

Meteorological, hydrological and oceanographic observation equipment and measuring equipment may also be installed.

Article 18 (Completion inspection of lock gates)

Section titled “Article 18 (Completion inspection of lock gates)”

When the construction of a lock gate is finished, a completion inspection shall be carried out.

A lock gate that has not passed the completion inspection may not be handed over or taken over.

Article 19 (Elimination of defects appearing during the warranty period)

Section titled “Article 19 (Elimination of defects appearing during the warranty period)”

The lock gate construction contractor organ or the equipment manufacturing institution is liable for defects appearing in lock gate structures and equipment during the warranty period.

The lock gate construction contractor organ and the equipment manufacturing institution shall eliminate in good time defects appearing in the construction of lock gate structures and the manufacture of equipment.

Article 20 (Modification and construction of irrigation sluice gates and water intakes)

Section titled “Article 20 (Modification and construction of irrigation sluice gates and water intakes)”

Institutions, enterprises and organizations that use the water of a lock gate reservoir shall modify, or newly construct, the irrigation sluice gates and water intakes in the reservoir basin to suit the lowest water level for handling floods in the rainy season.

Article 21 (Basic requirement for management of lock gates)

Section titled “Article 21 (Basic requirement for management of lock gates)”

Lock gate management is an important undertaking in which lock gate structures and equipment are regularly maintained and the water in the lock gate reservoir is regulated scientifically.

The lock gate operating organ and the relevant institution shall normalize lock gate management so that means of transport can pass through safely.

Article 22 (Intensive inspection of lock gate embankments)

Section titled “Article 22 (Intensive inspection of lock gate embankments)”

Intensive inspection of lock gate embankments shall be carried out every year.

The lock gate operating organ and the relevant institution shall inspect changes in the state of the lock gate embankments, such as settlement, displacement, corrosion and hollowing.

Article 23 (Technical inspection of sluice gates and equipment)

Section titled “Article 23 (Technical inspection of sluice gates and equipment)”

The lock gate operating organ shall observe the cycle of technical inspection of sluice gates, hoisting equipment and electrical equipment.

Where necessary, technical inspection may also be entrusted to the relevant specialized institution.

Article 24 (Repair and maintenance of facilities)

Section titled “Article 24 (Repair and maintenance of facilities)”

The lock gate operating organ and the relevant institution shall regularly ascertain the state of facilities such as aids to navigation, lighthouses and breakwaters, and repair and maintain them, so that there is no impediment to the navigation of ships.

Article 25 (Designation of lock gate protection zones)

Section titled “Article 25 (Designation of lock gate protection zones)”

The State shall designate lock gate protection zones in order to protect lock gate facilities and waters.

Lock gate protection zones shall be designated by the Cabinet.

Article 26 (Rules on construction in the lock gate reservoir area)

Section titled “Article 26 (Rules on construction in the lock gate reservoir area)”

Where an institution, enterprise or organization intends to carry out the construction or relocation of facilities in the lock gate reservoir area, it shall obtain the approval of the construction supervision organ.

No person may impede the protection of lock gates or ship routes in the lock gate protection zone by blasting, excavating, dredging or carrying out similar acts.

The lock gate operating organ and the relevant institution shall regularly measure water depth and keep track of the state of sedimentation and scouring in the lock gate reservoir.

The relevant institutions and enterprises shall take measures to prevent sedimentation and scouring in the lock gate reservoir.

Article 28 (Inspection and repair of lock gate facilities)

Section titled “Article 28 (Inspection and repair of lock gate facilities)”

The lock gate operating organ shall carry out inspection and repair of lock gate facilities before the rainy season. In this case, an equipment operation test shall be carried out.

Article 29 (Regulation of the water level of the lock gate reservoir)

Section titled “Article 29 (Regulation of the water level of the lock gate reservoir)”

The water level of the lock gate reservoir shall be regulated by the lock gate operating organ.

The lock gate operating organ shall set up an instruction system, calculate the water volume of the lock gate reservoir and maintain the reference water level.

The hydrometeorological organ shall provide the hydrometeorological forecasts and observation data needed for regulating the water level of the lock gate reservoir.

Article 30 (Management of the water of the lock gate reservoir)

Section titled “Article 30 (Management of the water of the lock gate reservoir)”

The water of the lock gate reservoir in the rainy season shall be managed by the flood command headquarters.

The flood command headquarters shall keep track of the hydrometeorological forecasts and observation data issued by the hydrometeorological organ, the hydraulic operation data and how the related reservoirs are managed and operated, and shall direct water management scientifically.

Article 31 (Notification of the inflow and discharge volumes of each lock gate)

Section titled “Article 31 (Notification of the inflow and discharge volumes of each lock gate)”

The lock gate operating organ shall inform the relevant institution of the inflow and discharge volumes of each lock gate.

The relevant institution shall take measures to prevent damage caused by water.

Institutions, enterprises and organizations that discharge waste water into the lock gate reservoir shall be equipped with purification facilities.

Waste water that has not been purified may not be discharged into the lock gate reservoir.

Article 33 (Rules to be observed in lock gate waters)

Section titled “Article 33 (Rules to be observed in lock gate waters)”

A ship passing through a lock gate shall observe the prescribed rules in the lock gate waters.

A ship that is not equipped with pollution prevention equipment may not pass through a lock gate.

Article 34 (Management of the lock gate reservoir area)

Section titled “Article 34 (Management of the lock gate reservoir area)”

The land and environment protection organ and the relevant institutions, enterprises and organizations shall create scenic forests in the lock gate reservoir area.

Erosion and torrent control works shall be carried out where necessary, and their facilities shall be regularly repaired and maintained.

Article 35 (Basic requirement for operation of lock gates)

Section titled “Article 35 (Basic requirement for operation of lock gates)”

Proper operation of lock gates is an essential requirement for meeting the growing transport demand.

The lock gate operating organ shall organize lock gate operation properly and raise its utilization rate.

Article 36 (Time of passage of ships through lock gates)

Section titled “Article 36 (Time of passage of ships through lock gates)”

The passage of ships through a lock gate shall be carried out in the daytime.

Where necessary, ships may also be passed through at night.

Article 37 (Order of passage of ships through lock gates)

Section titled “Article 37 (Order of passage of ships through lock gates)”

The passage of ships through a lock gate shall be carried out in the order of arrival.

A ship whose passage is of national urgency may be passed through the lock gate first with the approval of the higher-level organ.

Article 38 (Application for passage of ships through lock gates)

Section titled “Article 38 (Application for passage of ships through lock gates)”

A ship intending to pass through a lock gate shall apply to the lock gate operating organ for passage. In this case, it shall give the name of the ship, nationality, port of registry, name of the organ to which it belongs, length, breadth, draught, gross tonnage, net tonnage, engine output, type and quantity of cargo, call sign and expected time of arrival at the waiting point.

Article 39 (Duties of the lock gate operating organ)

Section titled “Article 39 (Duties of the lock gate operating organ)”

The lock gate operating organ shall confirm the manoeuvring characteristics of the ship and the technical state of its engine and pass it through the lock gate. In this case, it shall determine the lock chamber taking into account the size and technical characteristics of the ship and the weather conditions, and, where necessary, shall organize the assignment of tugboats and the work of casting off or mooring ships.

Article 40 (Pilotage of trade cargo ships)

Section titled “Article 40 (Pilotage of trade cargo ships)”

A trade cargo ship passing through a lock gate is required to receive pilotage and shall obey the command of the lock gate operating organ.

Even where pilotage is received, the master remains responsible for manoeuvring the ship.

Article 41 (Waiting of ships intending to pass through lock gates)

Section titled “Article 41 (Waiting of ships intending to pass through lock gates)”

A ship intending to pass through a lock gate shall wait at the waiting point.

Ships and wheeled vehicles that will not pass through the lock gate may not enter the lock gate protection zone.

Article 42 (Notification of reasons for which ship passage work cannot be carried out)

Section titled “Article 42 (Notification of reasons for which ship passage work cannot be carried out)”

Where ship passage work cannot be carried out because of such matters as disaster-causing meteorological and marine phenomena, flood handling, lock chamber repair and accident recovery, the lock gate operating organ shall notify the institution or ship that requested passage through the lock gate.

Article 43 (Responsibility upon occurrence of accidents in lock gate waters)

Section titled “Article 43 (Responsibility upon occurrence of accidents in lock gate waters)”

An institution, enterprise or organization that has caused a ship or property to sink or drift in lock gate waters shall raise or tow it away in good time.

An institution, enterprise or organization that has used a lock gate shall pay the lock gate passage charge.

The lock gate passage charge shall be set by the price-setting organ.

Chapter 5. Guidance and control of lock gate work

Section titled “Chapter 5. Guidance and control of lock gate work”

Article 45 (Basic requirement for guidance and control of lock gate work)

Section titled “Article 45 (Basic requirement for guidance and control of lock gate work)”

Proper guidance and control of lock gate work is a basic guarantee for correctly implementing the State’s transport and traffic policy.

The State shall ensure that a guidance system for lock gate work is set up and control is strengthened.

Guidance of lock gate work shall be exercised by the central lock gate guidance organ under the unified guidance of the Cabinet.

The central lock gate guidance organ shall regularly take charge of and guide the work of construction, management and operation of lock gates.

Article 47 (Provision of conditions for lock gate work)

Section titled “Article 47 (Provision of conditions for lock gate work)”

The State planning organ, the labour administration organ and the relevant institution shall ensure in good time the supply of the labour, equipment and materials needed for lock gate work.

The labour, equipment and materials of the lock gate sector may not be diverted to other sectors.

Article 48 (Supervision and control of lock gate work)

Section titled “Article 48 (Supervision and control of lock gate work)”

Supervision and control of lock gate work shall be exercised by the central lock gate guidance organ and the relevant supervision and control organ.

The central lock gate guidance organ and the relevant supervision and control organ shall strictly supervise and control the construction, management and operation of lock gates.

Article 49 (Restoration to the original state and compensation for damage)

Section titled “Article 49 (Restoration to the original state and compensation for damage)”

Where lock gate structures, equipment or markers have been damaged, the person concerned shall be made to restore them to the original state or to compensate for the damage caused.

Where lock gate reservoir waters have been polluted or the rules on passage through lock gates have been violated, a fine may be imposed or the ship and persons may be held in custody.

Article 51 (Administrative or criminal liability)

Section titled “Article 51 (Administrative or criminal liability)”

Administrative or criminal liability shall be imposed, according to the circumstances, on the official responsible in an institution, enterprise or organization and on an individual citizen for violations of this Law that cause serious consequences for lock gate work.