Law of the Democratic People's Republic of Korea on the Prevention of Pollution of the Pothong River
Edition dated 29 October 2021. August 2024 NIS compilation, vol. 2, pp. 258–268
Adopted on 29 October Juche 110 (2021) by Decree No. 765 of the Standing Committee of the Supreme People’s Assembly
Source · Republic of Korea National Intelligence Service, Compilation of North Korean Laws (북한법령집), August 2024, vol. 2, pp. 258–268.
The first draft of this translation was produced with AI assistance.
Chapter 1. Fundamentals of the Law on the Prevention of Pollution of the Pothong River
Section titled “Chapter 1. Fundamentals of the Law on the Prevention of Pollution of the Pothong River”Article 1 (Mission of the Law on the Prevention of Pollution of the Pothong River)
Section titled “Article 1 (Mission of the Law on the Prevention of Pollution of the Pothong River)”The Law of the Democratic People’s Republic of Korea on the Prevention of Pollution of the Pothong River contributes to preventing pollution of the Pothong River and improving the ecological environment by strictly establishing the system and order in the work of protecting and managing the Pothong River.
Article 2 (Definition of terms)
Section titled “Article 2 (Definition of terms)”In this Law:
- “Pollution of the Pothong River” means that pollutants that affect human life and the habitat of animals and plants flow into the Pothong River or arise naturally, so that the qualitative indicators and condition of the river water have changed.
- “Ecological environment of the Pothong River” means the Pothong River and its surrounding environment that affect human life and the habitat of animals and plants.
- “The Pothong River and its basin” means the main stream and tributaries of the Pothong River and a certain area around them.
- “Water quality and ecological environment survey of the Pothong River” means analysing and evaluating the factors that cause pollution of the Pothong River, ascertaining the condition of construction, management and operation of facilities in the Pothong River and its basin and the actual condition of the surrounding environment, and identifying adverse factors.
- “Pothong River management organ” means the city management organ and the land and environment protection organ of the relevant area and the relevant institution, all of which undertake the water quality and ecological environment survey of the Pothong River and the work of protecting and managing the Pothong River.
- “Water exchange organizing organ” means the unit that undertakes the work of exchanging the water of the Pothong River by diverting back the water of the Taedong River.
Article 3 (Setting of the Pothong River pollution prevention zone)
Section titled “Article 3 (Setting of the Pothong River pollution prevention zone)”The State shall set a pollution prevention zone in order to prevent pollution of the Pothong River and improve the ecological environment.
The Pothong River pollution prevention zone includes the Pothong River and its basin from the Kyonryong Reservoir located in Phyongwon County, South Phyongan Province, to the Taedong River confluence point located in Sonnae-dong, Mangyongdae District, Pyongyang.
Article 4 (Principle of preventing pollution of the Pothong River)
Section titled “Article 4 (Principle of preventing pollution of the Pothong River)”Preventing pollution of the Pothong River is the fundamental way to improve the water quality and ecological environment of the Pothong River.
The State shall thoroughly take pollution prevention measures before production, construction and business activities, and shall ensure, by providing modern sewage and wastewater purification facilities in residential areas of the Pothong River basin and at the relevant institutions and enterprises and operating those facilities scientifically, that pollutants do not flow into the Pothong River.
Article 5 (Principle of introducing scientific and technological achievements)
Section titled “Article 5 (Principle of introducing scientific and technological achievements)”Introducing scientific and technological achievements is an important undertaking for improving Pothong River pollution prevention work.
The State shall draw up and implement year-by-year scientific research plans for preventing pollution of the Pothong River and improving the ecological environment, and shall ensure that advanced science and technology and valuable scientific research achievements are actively introduced into Pothong River pollution prevention work.
Article 6 (Principle of investment in pollution prevention work)
Section titled “Article 6 (Principle of investment in pollution prevention work)”Pothong River pollution prevention work is an important undertaking for making Pyongyang more beautiful and providing good living conditions and environment for the people and future generations.
The State shall increase investment in Pothong River pollution prevention work and shall ensure that this work is carried out in a planned manner and with a long-term view.
Article 7 (Scope of application of the Law)
Section titled “Article 7 (Scope of application of the Law)”This Law applies to institutions, enterprises, organizations and citizens.
This Law also applies to representative offices of other countries, foreign-invested enterprises and foreigners in our country.
Matters relating to the use, protection and management of the Pothong River that are not regulated by this Law shall be governed by the relevant laws and regulations.
Chapter 2. Survey for preventing pollution of the Pothong River
Section titled “Chapter 2. Survey for preventing pollution of the Pothong River”Article 8 (Establishment of the survey system for preventing pollution of the Pothong River)
Section titled “Article 8 (Establishment of the survey system for preventing pollution of the Pothong River)”The survey for preventing pollution of the Pothong River shall consist of a water quality survey and an ecological environment survey.
The central city management guidance organ and the central land and environment protection guidance organ shall establish the survey system for preventing pollution of the Pothong River in good order and shall ensure that the water quality and ecological environment survey for preventing pollution of the Pothong River is conducted strictly.
Article 9 (Content of the water quality and ecological environment survey)
Section titled “Article 9 (Content of the water quality and ecological environment survey)”The content of the water quality and ecological environment survey for preventing pollution of the Pothong River is as follows:
- Condition of changes in the river water level, volume of water, water flow and water quality
- Status of discharge of pollutants and condition of generation of river refuse
- Condition of sediment accumulated on the riverbed
- Condition of the habitat of aquatic animals and plants
- Condition of construction, repair, maintenance and operation of Pothong River protection facilities
- Condition of protection and management of riverbank forests
- Other content necessary for pollution prevention work
Article 10 (Methods of the water quality and ecological environment survey)
Section titled “Article 10 (Methods of the water quality and ecological environment survey)”The water quality and ecological environment survey for preventing pollution of the Pothong River shall take the form of regular, irregular and intensive surveys.
The regular survey shall be conducted by surveying, at the water quality monitoring points fixed by the Pothong River management organ, the water quality indicators three times a month and the ecological features subject to survey once a month.
The irregular survey shall be conducted where the volume of water and the speed of water flow change sharply, or where abnormal phenomena such as algal bloom caused by a rise in water temperature or fish floating up occur.
The intensive survey shall be conducted once a year, in liaison between the Pothong River management organ and the relevant scientific research institution, after determining the subjects and content of the survey.
Article 11 (Bodies responsible for the water quality and ecological environment survey)
Section titled “Article 11 (Bodies responsible for the water quality and ecological environment survey)”The bodies responsible for the water quality and ecological environment survey are as follows:
- The water quality survey of the main stream and tributaries of the Pothong River shall be carried out by the Pothong River management organ.
- The water quality survey of sewage and rainwater coming out through the sewage network and the rainwater network shall be carried out by the city management organ of the relevant area.
- The water quality survey of wastewater and sewage coming out of factories and enterprises shall be carried out by the relevant unit in the case of factories and enterprises of Grade 2 or higher, and in the case of factories and enterprises of Grade 3 or lower, the water quality survey of wastewater shall be carried out by the land and environment protection organ of the relevant area and the water quality survey of sewage by the city management organ of the relevant area.
- The Pothong River management organ may directly carry out the water quality survey of wastewater and sewage coming out of factories and enterprises of Grade 2 or higher. In this case, it shall be conducted after informing the relevant institution and in its presence.
- The environmental survey of the Pothong River and its basin shall be carried out by the Pothong River management organ.
Article 12 (Entrustment of water quality analysis)
Section titled “Article 12 (Entrustment of water quality analysis)”Institutions, enterprises and organizations that have no capacity to analyse the water quality of wastewater and sewage may entrust water quality analysis to a specialized water quality analysis institution. In this case, the institution entrusted shall be liable for the scientific soundness of the relevant analysis data.
Article 13 (Recording of water quality and ecological environment survey data)
Section titled “Article 13 (Recording of water quality and ecological environment survey data)”The Pothong River management organ and institutions, enterprises and organizations shall accurately record the results of the water quality and ecological environment survey item by item.
Where a change occurs in the water quality and ecological environment condition, its cause and the measures taken shall be recorded together.
Article 14 (Submission of water quality and ecological environment survey data)
Section titled “Article 14 (Submission of water quality and ecological environment survey data)”Institutions, enterprises and organizations shall submit the water quality and ecological environment survey data to the Pothong River management organ once a month.
The Pothong River management organ shall compile the water quality and ecological environment survey data and submit them to the central city management guidance organ and the central land and environment protection guidance organ once a quarter. In this case, the central city management guidance organ shall hand over the relevant data to the central land and environment protection guidance organ.
Article 15 (Provision of conditions for the water quality and ecological environment survey)
Section titled “Article 15 (Provision of conditions for the water quality and ecological environment survey)”The Pothong River management organ may mobilize experts of scientific research institutions for the water quality and ecological environment survey of the Pothong River or request necessary data from the relevant institutions, enterprises and organizations. In this case, the relevant institutions, enterprises and organizations shall provide in good time the necessary personnel and data, so long as this is not related to ensuring secrecy.
Article 16 (Report and its investigation)
Section titled “Article 16 (Report and its investigation)”Institutions, enterprises, organizations and citizens shall inform the Pothong River management organ in good time when they discover abnormal phenomena such as pollutants flowing into the Pothong River, fish dying and floating up, or Pothong River protection facilities being destroyed.
The Pothong River management organ shall, immediately upon receiving the notification, go to the site, conduct a detailed investigation and take appropriate measures.
Chapter 3. Treatment of pollutants of the Pothong River
Section titled “Chapter 3. Treatment of pollutants of the Pothong River”Article 17 (Construction and reconstruction of purification facilities)
Section titled “Article 17 (Construction and reconstruction of purification facilities)”Where purification facilities such as a sewage network and sewage purification works are absent in the relevant area or their capacity is insufficient, the Pothong River management organ shall draw up a year-by-year plan and construct them in good time.
Institutions, enterprises and organizations that have their own purification facilities shall draw up and implement a plan for reconstructing old purification facilities that cannot ensure the complete purification of wastewater and sewage into purification facilities whose scientific soundness is guaranteed.
Article 18 (Advance design of purification facility construction)
Section titled “Article 18 (Advance design of purification facility construction)”The relevant design institution shall carry out in advance the design of purification facility construction, whose scientific soundness and long-term outlook are guaranteed, in keeping with the scale and use of the construction project, and shall provide in good time the design necessary for the reconstruction and modernization of old purification facilities already built.
Article 19 (Purification and disinfection of sewage and wastewater)
Section titled “Article 19 (Purification and disinfection of sewage and wastewater)”The relevant institutions, enterprises and organizations shall modernize the sewage and wastewater purification process, establish a purification and disinfection system, ensure the normal operation and normal management of purification works and pumping stations, and completely purify and disinfect sewage and wastewater in conformity with the State environmental protection standards.
Article 20 (Emergency discharge of sewage)
Section titled “Article 20 (Emergency discharge of sewage)”Institutions, enterprises and organizations shall obtain the approval of the Pothong River management organ where they must discharge sewage into the Pothong River in an emergency for reasons such as the repair of sewage purification works and sewage pumping stations or the replacement of sewage pipes.
Where sewage is discharged into the Pothong River in an emergency, the water exchange organizing organ shall increase the volume of water exchange and open the sluice gates to drain the polluted water in good time.
Article 21 (Treatment of wastewater through the sewage network)
Section titled “Article 21 (Treatment of wastewater through the sewage network)”Institutions, enterprises and organizations shall obtain the agreement of the city management organ of the relevant area and the approval of the central city management guidance organ where they intend to discharge wastewater through the sewage network.
Approval for connection to the sewage network shall be obtained again also where the water quality indicators of the wastewater have changed or are to be changed.
Article 22 (Wastewater that may not be discharged through the sewage network)
Section titled “Article 22 (Wastewater that may not be discharged through the sewage network)”The following wastewater may not be discharged through the sewage network:
- Wastewater containing substances that can corrode sewage pipes
- Radioactive and toxic wastewater that has not been completely purified, dyeing wastewater, paper wastewater and wastewater mixed with oil
- Pathogenic wastewater that has not been disinfected or has been incompletely disinfected
- Wastewater mixed with tailings or sand that can clog sewage pipes
Article 23 (Treatment of radioactive, toxic and pathogenic wastewater)
Section titled “Article 23 (Treatment of radioactive, toxic and pathogenic wastewater)”Institutions, enterprises and organizations shall provide separate purification facilities for radioactive, toxic and pathogenic wastewater, strictly purify and disinfect radioactive, toxic and pathogenic wastewater, and then treat it in accordance with the prescribed rules.
Article 24 (Treatment of urban refuse)
Section titled “Article 24 (Treatment of urban refuse)”Institutions, enterprises and organizations shall strictly observe the rules on treating urban refuse so that urban refuse and rainwater polluted by it do not flow into the Pothong River or the rainwater network leading to the Pothong River.
Article 25 (Treatment of sludge, sand and sediment)
Section titled “Article 25 (Treatment of sludge, sand and sediment)”Institutions, enterprises and organizations shall dispose of the sludge, sand and sediment dug out of the Pothong River, purification works and settling ponds only at the designated places.
The places for disposing of sludge, sand and sediment shall be fixed by the Pothong River management organ.
Article 26 (Treatment of water plants and river refuse)
Section titled “Article 26 (Treatment of water plants and river refuse)”Institutions, enterprises and organizations shall regularly remove the water plants and river refuse of the Pothong River, and shall install sand and refuse-trapping facilities in rainwater culverts and open channels and at sewage and rainwater outlets in keeping with actual conditions, so that sand and river refuse do not flow into the Pothong River.
Article 27 (Treatment of pollutants generated in the course of extraction and construction)
Section titled “Article 27 (Treatment of pollutants generated in the course of extraction and construction)”Institutions, enterprises, organizations and citizens shall not discard tailings, waste rock and the like into the Pothong River.
Where placer gold, sand or other ore is extracted in the Pothong River and its basin, or where various structural works are carried out, pollution prevention measures shall be taken so that turbid water, tailings and waste rock do not flow into the Pothong River.
Article 28 (Prevention of pollution by oil spills)
Section titled “Article 28 (Prevention of pollution by oil spills)”Institutions, enterprises and organizations that operate equipment on the Pothong River shall strictly take oil pollution prevention measures so that oil is not spilled into the Pothong River.
Where a vehicle washing station or a catering service facility is to be operated, an oil separator shall be installed.
Institutions, enterprises, organizations and citizens shall not arbitrarily clean equipment and wheeled vehicles in the Pothong River.
Article 29 (Prevention of pollution by fertilizers and agricultural chemicals)
Section titled “Article 29 (Prevention of pollution by fertilizers and agricultural chemicals)”Institutions, enterprises, organizations and citizens shall, where they use fertilizers or agricultural chemicals in the Pothong River basin, ensure that these do not flow directly into the Pothong River.
Containers that held fertilizers or agricultural chemicals may not be washed in the Pothong River.
Chapter 4. Protection and management of the Pothong River
Section titled “Chapter 4. Protection and management of the Pothong River”Article 30 (Establishment of the work system for protection and management of the Pothong River)
Section titled “Article 30 (Establishment of the work system for protection and management of the Pothong River)”The central city management guidance organ and the central land and environment protection guidance organ shall establish the work system for the protection and management of the Pothong River in good order.
The protection and management of the Pothong River within the urban area shall be carried out by the city management organ of the relevant area and the relevant institution, and the protection and management of the Pothong River outside the urban area by the land and environment protection organ of the relevant area.
Article 31 (Planning for the protection and management of the Pothong River)
Section titled “Article 31 (Planning for the protection and management of the Pothong River)”The Pothong River management organ shall carry out the protection and management of the Pothong River in a planned manner, including riverbed dredging, stone masonry works, facility works and tidying of the surrounding environment.
Planning organs and design-drafting organs shall draw up and hand down in good time the plan documents and design documents relating to the protection and management of the Pothong River.
Article 32 (Mass-based protection and management of the Pothong River)
Section titled “Article 32 (Mass-based protection and management of the Pothong River)”The Pothong River management organ shall properly allocate the responsibilities relating to the protection and management of the Pothong River to the institutions, enterprises and organizations within its jurisdiction.
Institutions, enterprises and organizations shall regularly carry out the protection and management of the section in their charge, and shall do so intensively during the general mobilization period for land management.
Article 33 (Repair and management of Pothong River facilities)
Section titled “Article 33 (Repair and management of Pothong River facilities)”The Pothong River management organ shall regularly repair and manage the facilities installed to improve the water quality and protect the ecological environment of the Pothong River.
Article 34 (Dredging of the Pothong River bed)
Section titled “Article 34 (Dredging of the Pothong River bed)”The Pothong River management organ shall regularly carry out riverbed dredging so that sediment does not accumulate on the Pothong River bed. In this case, it shall strictly observe the requirements of the relevant design and guidance manual.
Article 35 (Bank improvement of the Pothong River)
Section titled “Article 35 (Bank improvement of the Pothong River)”The Pothong River management organ shall carry out bank improvement in a planned manner, including building stone masonry and embankments on the banks of the Pothong River and planting ground cover plants or trees.
No person may construct buildings or facilities on river embankments, plant crops, pull stones out of the masonry, dig up soil or do anything similar there.
Article 36 (Installation of erosion and torrent control structures and establishment of riverbank forests)
Section titled “Article 36 (Installation of erosion and torrent control structures and establishment of riverbank forests)”The Pothong River management organ shall install erosion and torrent control structures so that soil, trees, sand and stones do not flow into the Pothong River, and shall establish riverbank forests to prevent the riverbanks from being eroded or the soil from being washed away.
The riverbank forests of the Pothong River may not be felled without approval.
Article 37 (Prevention of flood damage)
Section titled “Article 37 (Prevention of flood damage)”The Pothong River management organ shall regularly survey and keep track of areas and facilities that suffer or may suffer extensive flood damage, and shall thoroughly take measures to prevent damage.
Institutions, enterprises, organizations and citizens are required, where flood damage has occurred, to take part in damage restoration work as directed by the relevant institution.
Article 38 (Management of parks and pleasure grounds around the Pothong River)
Section titled “Article 38 (Management of parks and pleasure grounds around the Pothong River)”Institutions, enterprises, organizations and citizens shall regularly manage the parks and pleasure grounds around the Pothong River, and shall consciously observe the established rules on use and actively protect the ecological environment of the Pothong River and its basin.
Article 39 (Protection of aquatic animals and plants)
Section titled “Article 39 (Protection of aquatic animals and plants)”The Pothong River management organ shall be responsible for protecting and propagating the aquatic animals and plants of the Pothong River.
Institutions, enterprises, organizations and citizens shall not interfere with the habitat of aquatic animals and plants, including fish, in the Pothong River.
Fish may not be caught by using explosives, agricultural chemicals or toxic substances, or during the aquatic resources protection month.
Article 40 (Management of sluice gates)
Section titled “Article 40 (Management of sluice gates)”Institutions, enterprises and organizations that manage sluice gates shall modernize the sluice gate equipment and carry out management and operation scientifically, so as to prevent pollution of the Pothong River and flood damage and to fully provide the water needed for agriculture.
Article 41 (Water exchange of the Pothong River)
Section titled “Article 41 (Water exchange of the Pothong River)”The water exchange organizing organ shall carry out the water exchange of the Pothong River regularly and shall ensure without fail the planned volume of water exchange.
Where the degree of pollution of the Pothong River has risen, full water exchange shall be carried out.
Chapter 5. Scientific research for preventing pollution of the Pothong River
Section titled “Chapter 5. Scientific research for preventing pollution of the Pothong River”Article 42 (Drawing up of scientific research plans for preventing pollution)
Section titled “Article 42 (Drawing up of scientific research plans for preventing pollution)”The central science and technology administrative guidance and management organ and the relevant scientific research institution shall draw up annual scientific research plans for preventing pollution of the Pothong River and improving the ecological environment, and shall implement those plans correctly.
The relevant institutions, enterprises and organizations shall fully provide the conditions necessary for the scientific research work for preventing pollution of the Pothong River.
Article 43 (Introduction of scientific research achievements)
Section titled “Article 43 (Introduction of scientific research achievements)”The Pothong River management organ shall actively introduce the scientific research achievements for preventing pollution of the Pothong River and protecting the ecological environment into Pothong River protection and management work.
Article 44 (Setting of standard indicators for management of the Pothong River)
Section titled “Article 44 (Setting of standard indicators for management of the Pothong River)”The relevant scientific research institution shall determine the standard indicators necessary for the protection and management and operation of the Pothong River, such as the standard water level and volume of water exchange by season and period of the Pothong River and the normal height between the riverbed and the water surface by area, and hand them over to the central city management guidance organ and the central land and environment protection guidance organ.
Article 45 (Development of river management technology)
Section titled “Article 45 (Development of river management technology)”The relevant scientific research institution shall develop and advance the advanced science and technology of the river protection and management sector, including water purification technology and ecological restoration technology that effectively use physical, chemical and biological purification methods and the natural self-purification capacity.
Article 46 (Recycling of sediment)
Section titled “Article 46 (Recycling of sediment)”The relevant scientific research institution and institutions, enterprises and organizations shall realistically draw up, and implement, scientific research plans for recycling the sludge, sand and sediment coming out of the Pothong River, sewage purification works and settling ponds.
Article 47 (Training of talents)
Section titled “Article 47 (Training of talents)”The relevant scientific research institution and educational institution shall strengthen training of talents and bring up, with a long-term view, the technicians and experts necessary for river protection and management.
Article 48 (Provision of the latest scientific and technological materials)
Section titled “Article 48 (Provision of the latest scientific and technological materials)”The relevant institutions, including the external economic guidance organ and the central science and technology administrative guidance and management organ, shall be responsible for ensuring that the materials on the latest scientific and technological achievements attained in the field of river protection and management, and the equipment, are provided to the city management sector, the land and environment protection sector and the scientific research sector.
Chapter 6. Guidance and control of Pothong River pollution prevention work
Section titled “Chapter 6. Guidance and control of Pothong River pollution prevention work”Article 49 (Guidance of Pothong River pollution prevention work)
Section titled “Article 49 (Guidance of Pothong River pollution prevention work)”Guidance of Pothong River pollution prevention work shall be exercised by the central city management guidance organ and the central land and environment protection guidance organ under the unified guidance of the Cabinet.
The central city management guidance organ and the central land and environment protection guidance organ shall regularly take charge of and guide Pothong River pollution prevention work.
Article 50 (Review of Pothong River pollution prevention work)
Section titled “Article 50 (Review of Pothong River pollution prevention work)”The Pothong River management organ and the central city management guidance organ and central land and environment protection guidance organ shall review the status of protection and management of the Pothong River and take appropriate measures. The management organ shall do so once a month, and the central guidance organs once a quarter.
The Cabinet shall regularly keep itself informed of the status of protection and management of the Pothong River and take measures in good time on the problems raised.
Article 51 (Provision of conditions necessary for Pothong River pollution prevention work)
Section titled “Article 51 (Provision of conditions necessary for Pothong River pollution prevention work)”Commissions, ministries and central organs and the people’s committee of the relevant area shall fully provide the labour, equipment, materials, funds, electric power and fuel oil necessary for Pothong River pollution prevention work.
The labour, equipment, materials, funds and electric power necessary for the management and operation of sewage purification works, sewage pumping stations, dredgers and water exchange pumping stations, and for projects to expand sewage works capacity and sewage conveyance capacity, shall be provided as a priority.
Article 52 (Supervision and control of Pothong River pollution prevention work)
Section titled “Article 52 (Supervision and control of Pothong River pollution prevention work)”Supervision and control of Pothong River pollution prevention work shall be exercised by law enforcement organs and the relevant supervision and control organ.
Law enforcement organs and the relevant supervision and control organ shall strictly supervise and control Pothong River pollution prevention work.
Article 53 (Application of the penalty of a fine on institutions)
Section titled “Article 53 (Application of the penalty of a fine on institutions)”In the following cases, institutions, enterprises and organizations shall be fined 100,000 to 1,500,000 won, and foreign-invested enterprises 100,000 to 50,000,000 won:
- Where sewage and wastewater purification works or settling ponds have not been constructed or have been constructed in a perfunctory manner
- Where deficiencies of sewage and wastewater purification works or settling ponds have not been addressed, sediment has not been removed in good time, or unpurified sewage or wastewater has been discharged
- Where a wastewater pipe has been connected to the sewage network, or a sewage pipe to the rainwater network, rainwater culvert or open channel, without approval
- Where placer gold, mixed stone or sand has been extracted in the Pothong River and its basin without approval, or has been extracted without taking purification measures even though approval was obtained
- Where the Pothong River has been used without obtaining the required approvals such as the environmental impact assessment, the pollutant discharge permit, the permit for use of land in the water area and the river use permit
- Where facilities for treating oily wastewater, sewage or refuse have not been installed, or oily wastewater, sewage or refuse has been spilled
- Where pathogenic wastewater or discarded matter that has not been disinfected has been discharged or discarded
- Where various kinds of refuse have been discarded
Article 54 (Application of the penalty of a fine on individuals)
Section titled “Article 54 (Application of the penalty of a fine on individuals)”In the following cases, individual citizens (including foreigners) shall be fined 1,000 to 100,000 won:
- Where a dwelling house sewage pipe has been connected to the rainwater network, rainwater culvert or open channel
- Where wheeled vehicles, equipment, fertilizer containers and the like have been cleaned in the Pothong River
- Where various kinds of refuse and substances harmful to the habitat of aquatic animals and plants have been discarded into the Pothong River
- Where fish have been caught in a prohibited period or by a prohibited method
- Where Pothong River protection facilities have been damaged
- Where other acts that impede Pothong River pollution prevention work have been committed
Article 55 (Restoration to the original state or restitution)
Section titled “Article 55 (Restoration to the original state or restitution)”Where equipment and facilities for the protection and management of the Pothong River, including embankments, pumping stations, refuse-trapping facilities and sewage pipes, have been damaged, the person concerned shall be made to restore them to the original state or to make restitution.
Article 56 (Suspension)
Section titled “Article 56 (Suspension)”In the following cases, the management, business or use of water supply and sewerage of the relevant institution, enterprise or organization shall be suspended:
- Where buildings and facilities have been constructed without providing sewage purification facilities in accordance with the construction plan or the infrastructure design
- Where scientific purification facilities suited to the characteristics of the production sector have not been constructed or reconstructed, or wastewater or sewage exceeding the State environmental protection standards has been discharged
- Where a wastewater pipe has been connected to the sewage network, or a sewage pipe to the rainwater network, rainwater culvert or open channel, without approval
- Where the environmental impact assessment or the pollutant discharge permit has not been obtained as prescribed
- Where, for not less than three months, water quality measurement and analysis data from the entity’s own purification works or settling ponds have not been submitted to the land and environment protection organ of the relevant area
- Where the rules on the use of land in the Pothong River water area have been violated
Article 57 (Penalties of warning, stern warning, unpaid labour, labour education, demotion, dismissal and removal from post)
Section titled “Article 57 (Penalties of warning, stern warning, unpaid labour, labour education, demotion, dismissal and removal from post)”In the following cases, the person responsible shall be given the penalty of warning or stern warning, or the penalty of unpaid labour or labour education of not more than three months:
- Where surveys and analyses for preventing pollution of the Pothong River have been impeded
- Where sewage and wastewater purification facilities have not been properly constructed or properly reconstructed and repaired
- Where a person has not been mobilized for the Pothong River management work, or has failed to carry out the assignment allocated
- Where riverbed dredging or treatment of dredged sludge has not been properly carried out, or measures for removing water plants and river refuse have not been taken
- Where acts that impede the habitat of aquatic animals and plants have been committed, or fish have been caught in a prohibited period or by a prohibited method
- Where measures for water exchange have not been taken, or the necessary labour, equipment, materials or funds for the protection and management of the Pothong River have not been provided, or those resources have been diverted
- Where, without good reason, supervision and control for preventing pollution of the Pothong River has been refused, the request for data has been rejected, or supervision work has been obstructed
Where the circumstances of an act under items 1 to 7 of the preceding paragraph are grave, the penalty of unpaid labour or labour education of not less than three months, or the penalty of demotion, dismissal or removal from post shall be given.
Article 58 (Criminal liability)
Section titled “Article 58 (Criminal liability)”Where an act in violation of this Law amounts to a crime, criminal liability shall be imposed on the person responsible in accordance with the relevant article of the Criminal Law.
English translations by NK Law are licensed under CC BY-SA 4.0.Copyright and reuse
Contact info@nklaw.org