Railway Law of the Democratic People's Republic of Korea

Edition dated 24 March 2021. August 2024 NIS compilation, vol. 1, pp. 1070–1082

Adopted on 22 October Juche 76 (1987) by Decision No. 6 of the Permanent Committee of the Supreme People’s Assembly
Amended and supplemented on 11 March Juche 88 (1999) by Decree No. 507 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 3 February Juche 89 (2000) by Decree No. 1337 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 24 January Juche 95 (2006) by Decree No. 1528 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 26 February Juche 97 (2008) by Decree No. 2601 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 5 May Juche 98 (2009) by Decree No. 37 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 26 April Juche 100 (2011) by Decree No. 1617 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 23 August Juche 100 (2011) by Decree No. 1825 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 22 July Juche 104 (2015) by Decree No. 577 of the Standing Committee of the Supreme People’s Assembly
Amended and supplemented on 24 March Juche 110 (2021) by Decree No. 550 of the Standing Committee of the Supreme People’s Assembly

Source · Republic of Korea National Intelligence Service, Compilation of North Korean Laws (북한법령집), August 2024, vol. 1, pp. 1070–1082.

The first draft of this translation was produced with AI assistance.

Chapter 1. Fundamentals of the Railway Law

Section titled “Chapter 1. Fundamentals of the Railway Law”

Article 1 (Status and mission of the railway)

Section titled “Article 1 (Status and mission of the railway)”

The railway is the artery of the country and the forerunner of the national economy.

In the Democratic People’s Republic of Korea, the railway contributes to the development of the socialist independent national economy and the improvement of the people’s material and cultural life.

In the Democratic People’s Republic of Korea, the railway is a noble gain of the revolution won through the struggle to implement the programme for the nationalization of major industries.

The railway shall be owned only by the State.

Article 3 (Principle of developing railway transport)

Section titled “Article 3 (Principle of developing railway transport)”

Transport is an important component of socialist expanded reproduction.

The State shall develop railway transport on the principle of keeping production and transport in proper balance and building up transport capacity in advance of production.

Article 4 (Principle of railway construction)

Section titled “Article 4 (Principle of railway construction)”

Building the railway with a long-term view is an important condition for developing equally all regions of the country and all sectors of the national economy.

The State shall ensure that the railway is built in a planned manner and deployed rationally in accordance with the master plan for land construction.

Article 5 (Principle of modernization, scientification and informatization of the railway)

Section titled “Article 5 (Principle of modernization, scientification and informatization of the railway)”

Modernizing the railway, putting it on a scientific basis and introducing information technology into it is the central task in strengthening the material and technical foundation of the railway.

The State shall ensure that investment in the railway transport sector is increased systematically, the technical revolution is vigorously carried out and the achievements of the latest science and technology are actively adopted, so that the railway is modernized and put on a scientific basis, and information technology is introduced into it.

Article 6 (Principle of regularizing railway operation)

Section titled “Article 6 (Principle of regularizing railway operation)”

Discipline is the lifeblood of the railway.

The State shall ensure that strong discipline and order are established on the railway and that railway operation is regularized.

Article 7 (Principle of meeting the growing transport demand)

Section titled “Article 7 (Principle of meeting the growing transport demand)”

Fully meeting the transport demand of the national economy is the basic guarantee of the normalization and continuous growth of production.

The State shall ensure that an integrated transport management system is established in keeping with the developing reality, transport organization and command are improved, and concentrated transport, container transport and joint transport are strengthened, so that the growing transport demand is fully met.

Article 8 (Principle of raising cultured quality and service-mindedness in railway transport)

Section titled “Article 8 (Principle of raising cultured quality and service-mindedness in railway transport)”

Railway transport is service work for society and all the people.

The State shall ensure that the cultural revolution is vigorously waged, the railway is managed carefully and cleanly, and cultured quality and service-mindedness in railway transport are raised.

Article 9 (Principle of railway protection)

Section titled “Article 9 (Principle of railway protection)”

Supporting and protecting the railway involving all the masses is an inherent requirement of the socialist system.

The State shall ensure that all the people take a deep interest in transport, vigorously support the railway and participate as masters in protecting and managing the railway.

Article 10 (Principle of scientific research and training of technical talents in the railway transport field)

Section titled “Article 10 (Principle of scientific research and training of technical talents in the railway transport field)”

The State shall ensure that scientific research work and the training of technical talents for modernizing railway transport means and equipment and for putting railway operation on a scientific basis are carried out with a long-term view.

Article 11 (Exchange and cooperation in the railway transport field)

Section titled “Article 11 (Exchange and cooperation in the railway transport field)”

The State shall develop exchange and cooperation with other countries and international organizations in the railway transport field.

Chapter 2. Strengthening the material and technical foundation of the railway

Section titled “Chapter 2. Strengthening the material and technical foundation of the railway”

Article 12 (Basic requirement for strengthening the material and technical foundation of the railway)

Section titled “Article 12 (Basic requirement for strengthening the material and technical foundation of the railway)”

Strengthening the material and technical foundation of the railway is an essential requirement of building independent and modern railway transport.

The State planning organ and the railway transport organ shall strengthen the Juche character of railway transport and carry out with a long-term view the modernization, speeding up, informatization and heavy-duty conversion of railway transport means and equipment.

Article 13 (Electrification of the railway)

Section titled “Article 13 (Electrification of the railway)”

Railway electrification is the basic direction of the development of railway transport in our country.

The railway transport organ shall, while consolidating the achievements made in railway electrification, develop the AC traction power supply system with a long-term view and complete railway electrification.

The power supply organ shall establish a system of supplying electric power to the railway by a dedicated line and supply high-quality electric power.

Article 14 (Production of transport means and equipment)

Section titled “Article 14 (Production of transport means and equipment)”

The railway transport organ and the relevant institution shall firmly build the production bases for rolling stock, rails, concrete sleepers and track fastenings, and shall produce in a planned manner modern transport means and equipment suited to the actual conditions of our country and with technical performance, convenience and cultured quality ensured at a high level, such as AC electric locomotives, internal combustion locomotives, electric multiple-unit trains, heavy-duty wagons, passenger coaches, heavy rails, concrete sleepers, track fastenings, full-face tunnel boring machines, track-laying trains, ballast-cleaning cars, snow-clearing machines for tracks and track accident recovery cranes.

Article 15 (Ensuring track safety and strength, extension of station yard tracks and construction of shops)

Section titled “Article 15 (Ensuring track safety and strength, extension of station yard tracks and construction of shops)”

The railway transport organ and the relevant institution shall develop track construction technology, including double-track tunnel construction and the lightening of bridge girder supports, reinforce track structures, adopt heavy rails and concrete sleepers to ensure the safety and strength of the track, extend railway station yard tracks, and build shops of the prescribed size at major railway stations.

Article 16 (Specialization of track construction, construction of new tracks and completion of the railway network)

Section titled “Article 16 (Specialization of track construction, construction of new tracks and completion of the railway network)”

The State planning organ, the railway transport organ and the relevant institution shall equip specialized track construction enterprises with modern construction equipment to achieve the specialization of track construction, build new tracks that are heavy-duty, modern and standardized in a forward-looking manner, and lay double tracks, bypass lines and connecting lines in sections where throughput capacity is strained, so as to complete the railway network of the country.

A track that has not undergone completion inspection may not be operated.

Article 17 (Railway automation and informatization of railway operation)

Section titled “Article 17 (Railway automation and informatization of railway operation)”

The railway transport organ shall adopt computer interlocking systems and train operation control systems to automate railway station yards and sections, overhaul the dedicated communication network of trunk tracks, and widely adopt modern technical means, including train position tracking systems and vehicle identification systems, to introduce information technology into railway operation.

Article 18 (Freight stations and dedicated sidings)

Section titled “Article 18 (Freight stations and dedicated sidings)”

As railway transport capacity grows, the railway transport organ and the relevant institutions and enterprises shall equip freight stations and dedicated sidings with various modern equipment and facilities for loading and unloading or storing freight.

Equipment and facilities that may damage wagons may not be installed at freight stations and dedicated sidings.

Article 19 (Provision of conditions for work in the railway transport sector)

Section titled “Article 19 (Provision of conditions for work in the railway transport sector)”

The State planning organ, the labour administration organ, the materials supply organ and the relevant institutions and enterprises shall ensure, ahead of other sectors, the supply of the labour force, materials and equipment necessary for making the railway heavy-duty and modern and for its operation.

Railway employees, including locomotive drivers, assistant locomotive drivers, repair workers and track workers, may not be mobilized for other work unconnected with railway sector work.

Article 20 (Accident-free punctual operation of trains)

Section titled “Article 20 (Accident-free punctual operation of trains)”

Strengthening train operation discipline on the railway is a basic requirement for normalizing railway transport.

The railway transport organ shall establish a monolithic dispatch command system in the organization and command of train operation, regularize railway operation and ensure accident-free punctual operation of trains.

All rolling stock operating on the railway main line shall obey the unitary dispatch command.

The railway transport organ shall draw up the train timetable accurately and ensure that all trains run according to the train timetable.

The train timetable may not be altered or breached at will.

The railway transport organ shall form trains in accordance with the train formation plan.

The train formation plan shall be drawn up by the central railway transport guidance organ.

The railway transport organ is required to implement the wagon circulation task.

Wagons in operation may not be held in excess of the holding standard.

Article 24 (Operation of railway rolling stock)

Section titled “Article 24 (Operation of railway rolling stock)”

Railway rolling stock shall be operated only by the railway transport organ.

The railway transport organ and the institutions, enterprises and organizations that use wagons shall increase the hauling weight and running distance of locomotives and comply with the prescribed wagon return days.

Where the relevant institutions and enterprises intend to use foreign rolling stock, they shall obtain the agreement of the central railway transport guidance organ and return the rolling stock used within the prescribed period.

Article 25 (Train command and operational handling)

Section titled “Article 25 (Train command and operational handling)”

Railway personnel shall strictly observe the regulations and rules in train command and operational handling.

Train command and operational handling may be performed only by railway personnel holding the required qualifications.

Article 26 (Keeping track of and registering rolling stock, building reserves and mobilization)

Section titled “Article 26 (Keeping track of and registering rolling stock, building reserves and mobilization)”

The railway transport organ shall keep track of and register all rolling stock without omission, and shall keep reserves of locomotives, wagons and passenger coaches needed for transport that arises urgently from time to time.

In urgent State freight transport, dedicated and circulating rolling stock of the relevant institutions and enterprises may be mobilized. In this case, the relevant institutions and enterprises shall provide in good time the dedicated and circulating rolling stock required by the railway transport organ.

The railway station is the grass-roots unit that directly undertakes and performs transport.

The railway transport organ shall strengthen the work of railway stations so as to heighten the sense of responsibility and increase the role of railway stations in train operational handling and in passenger and freight transport.

Article 28 (Basic requirement for railway freight transport)

Section titled “Article 28 (Basic requirement for railway freight transport)”

Railway freight transport is the basic duty of the railway transport organ.

The railway transport organ shall transport accurately, within the prescribed period, the freight needed for the development of the national economy and for the people’s livelihood.

Article 29 (Railway freight transport plan and contracts)

Section titled “Article 29 (Railway freight transport plan and contracts)”

The State planning organ shall draw up the railway freight transport plan so that an accurate balance between transport demand and transport capacity is ensured.

The railway transport organ and the cargo-owning institutions, enterprises and organizations shall conclude transport contracts in good time on the basis of the freight transport plan and are required to perform them.

Article 30 (Prohibition of irrational transport)

Section titled “Article 30 (Prohibition of irrational transport)”

The State planning organ, the railway transport organ and the relevant institutions and enterprises shall ensure that irrational transport, including counter-flow transport, repeated transport and empty-volume transport, is not carried out.

The railway transport organ shall transport by concentrated transport large quantities of freight to be carried to large factories and enterprises or to a given area.

The materials supply organ and the relevant institutions and enterprises shall ensure that the contracted supplies are provided in keeping with the requirements of concentrated transport.

The railway transport organ and the relevant institutions and enterprises shall increase container production and carry in containers freight that may be wasted in transit, freight that requires much packaging material, and freight that is difficult to load and unload.

Empty containers shall be returned to the owner in good time.

The State planning organ, the transport organ and the relevant institutions and enterprises shall organize joint transport to relieve the burden on the railway.

The organization of joint transport shall be such as to raise economic effectiveness.

Article 34 (Classification and packaging of railway freight)

Section titled “Article 34 (Classification and packaging of railway freight)”

Railway freight shall be divided into wagon-load consignments, small consignments, odd-lot consignments and baggage for transport.

Institutions, enterprises, organizations and citizens shall package the freight they intend to transport according to the prescribed standards.

Freight that is not packaged according to the standards may not be transported.

The railway transport organ and the cargo-owning institutions, enterprises and organizations shall load freight as required by the rated loading capacity of the wagon and the relevant regulations.

Bulky or light freight that can be compressed, including fibres, iron shavings and rice straw, shall be compressed before loading.

Freight requiring special transport conditions, including radioactive substances and explosive substances, shall be transported in accordance with separately prescribed regulations.

Article 37 (Division of loading and unloading work)

Section titled “Article 37 (Division of loading and unloading work)”

The loading and unloading of freight at railway stations shall be carried out by the railway transport organ. However, the loading and unloading of freight at railway stations without workers for loading and unloading wagon-load consignments, and at dedicated sidings and dedicated places, shall be carried out by the cargo owner.

Article 38 (Loading and unloading of freight and wagon dwell time)

Section titled “Article 38 (Loading and unloading of freight and wagon dwell time)”

The railway transport organ and the cargo-owning institutions, enterprises and organizations shall load and unload freight in good time and hand over the loaded and unloaded wagons to the railway station within the prescribed time. In this case, the wagon dwell time shall be fixed by the railway transport organ.

The railway transport organ and the local people’s committee shall build raised freight platforms and access roads at prescribed railway stations so that freight can be loaded and unloaded promptly.

Article 39 (Handing over and receiving freight)

Section titled “Article 39 (Handing over and receiving freight)”

The railway transport organ, the cargo-owning institutions, enterprises and organizations, and citizens shall duly hand over and receive freight.

The railway transport organ is liable for accidents that occur in the period from receiving the freight to handing it over.

Cargo-owning institutions, enterprises and organizations, and citizens may demand from the railway transport organ compensation for damage that occurred in the period for which freight transport was entrusted.

The railway transport organ shall strictly establish rules on freight management and on the taking out and bringing in of freight.

Freight whose owner is unknown, or which is not claimed even after the storage period has passed, shall be handed over to the relevant institution to be dealt with.

Institutions, enterprises, organizations and citizens that use foreign wagons or through-service wagons, or that have entrusted freight transport, shall pay the prescribed fares and charges to the railway transport organ.

Railway fares and charges shall be fixed by the State pricing organ or the central railway transport guidance organ, as the case may be.

Article 42 (Basic requirement for railway passenger transport)

Section titled “Article 42 (Basic requirement for railway passenger transport)”

Railway passenger transport is service activity to facilitate the convenience of passengers in travelling.

The railway transport organ shall raise service-mindedness towards travelling passengers and ensure their safe and cultured travel.

Article 43 (Organization of passenger trains)

Section titled “Article 43 (Organization of passenger trains)”

The railway transport organ shall organize passenger trains so as to be convenient for the travel of passengers.

Commuter trains, school trains, tourist trains and temporary passenger trains may be organized in sections where necessary.

Article 44 (Service facilities of railway stations and passenger coaches)

Section titled “Article 44 (Service facilities of railway stations and passenger coaches)”

The railway transport organ shall equip railway stations and passenger coaches with various service facilities, manage them in a hygienic and cultured manner, and provide information to passengers well.

A passenger coach in which lighting, water supply and heating are not provided may not be operated.

The railway transport organ shall sell tickets according to the passenger capacity of the coach.

Institutions, enterprises and organizations that intend to organize group travel shall apply to the railway transport organ in advance.

Article 46 (Commercial service on the railway)

Section titled “Article 46 (Commercial service on the railway)”

The railway transport organ shall operate train restaurants well and regularly sell foodstuffs, including soft drinks, to passengers in railway station yards, station buildings and trains.

The local organ of power, the agricultural guidance organ and the commerce guidance organ shall ensure the supply of the food raw materials and local specialities needed for commerce on trains.

Article 47 (Treatment of patients who fall ill during travel)

Section titled “Article 47 (Treatment of patients who fall ill during travel)”

The railway transport organ shall take measures to treat patients who fall ill during travel.

The public health institution of the area concerned and public health personnel on the train shall be mobilized, in accordance with the requirements of the railway transport organ, for the treatment of patients who fall ill during travel.

Article 48 (Observance of the rules on railway travel and on the use of passenger trains)

Section titled “Article 48 (Observance of the rules on railway travel and on the use of passenger trains)”

Citizens shall consciously observe the rules on railway travel and on the use of passenger trains.

No person may board a passenger coach without a designated ticket or with baggage that may impede passengers’ travel and the maintenance of order in the coach.

Protecting the railway is an important guarantee of the safe operation of trains.

All institutions, enterprises, organizations and citizens, including the railway transport organ, shall cherish and love the railway and actively protect it.

A railway protection zone shall be fixed to protect tracks and railway structures.

The railway protection zone shall be fixed by the Cabinet.

Article 51 (Management of the railway protection zone)

Section titled “Article 51 (Management of the railway protection zone)”

No person shall cultivate paddies and fields, raise livestock or otherwise impede railway protection within the railway protection zone.

Trees shall be planted on the land of the sections 20 m to the left and right outside the main track protection zone, and the forest management organ, the city management organ and the local people’s committee shall manage it. In this case, the forest management organ, the city management organ and the local people’s committee shall transplant in good time trees that have grown to an extent that may impede train operation.

Institutions, enterprises, organizations and citizens other than the forest management organ, the city management organ and the local people’s committee may not use the land of the sections 20 m to the left and right outside the main track protection zone.

Article 52 (Protection of railway facilities)

Section titled “Article 52 (Protection of railway facilities)”

The railway transport organ, the land and environment protection organ and the local organ of power shall carry out retaining wall works, landslide prevention works and drainage works where necessary, including the riverbanks and hillsides around railway embankments, railway bridges and tunnels, to protect railway facilities against damage from natural hazards.

Protective railings, protective wire netting and the like shall be installed in major track sections, and safety facilities shall be installed where a road passes under a railway bridge.

Article 53 (Prevention of electrolytic corrosion damage)

Section titled “Article 53 (Prevention of electrolytic corrosion damage)”

The railway transport organ shall take electrical insulation measures for electrified railway sections and prevent electrolytic corrosion damage to railway facilities.

Article 54 (Construction and maintenance of dedicated sidings)

Section titled “Article 54 (Construction and maintenance of dedicated sidings)”

A dedicated siding may not be branched directly from the railway main line and shall be branched from a siding of a railway station.

Where institutions and enterprises intend to lay, alter or remove a dedicated siding, they shall obtain the agreement of the railway transport organ.

Institutions and enterprises that have a dedicated siding shall regularly check, maintain and service railway facilities, including rolling stock and tracks.

Technical guidance and supervision and control of dedicated sidings shall be exercised by the railway transport organ.

Article 55 (Prohibition of passage on tracks)

Section titled “Article 55 (Prohibition of passage on tracks)”

Residents and means of transport, including motor vehicles and ox or horse carts, may not travel along tracks or cross tracks at places other than level crossings, and may not enter station yards without the approval of the relevant railway transport organ.

Where the local organ of power, the road management organ and the railway transport organ make level crossings, they shall ensure that the distance between them is not less than 2 km, and shall build overpasses or underground crossings at level crossings.

Watch posts shall be built at level crossings where an overpass or underground crossing cannot be built.

Where, as needed, a temporary level crossing is to be newly made or removed at a place not designated, the approval of the railway transport organ shall be obtained, and barriers shall be installed and watchmen posted.

Article 56 (Management of railway stations and track surroundings)

Section titled “Article 56 (Management of railway stations and track surroundings)”

The railway transport organ and the relevant institution shall keep railway stations and railway facilities in good order, manage their surroundings in a hygienic and cultured manner, and install railway markers in a cultured manner.

The land and environment protection organ, the local organ of power and the relevant institution shall plant many trees of good species around the main track, use them as a tree nursery, and achieve the survival rate as prescribed.

Swidden fields and treeless land on mountains adjoining the main track shall be planted with trees and afforested.

Dwelling houses and public buildings shall not be built within the prescribed distance from the main track, and those already existing shall be relocated.

Article 57 (Prohibition of acts impeding railway protection)

Section titled “Article 57 (Prohibition of acts impeding railway protection)”

Institutions, enterprises, organizations and citizens shall not damage or destroy railway markers, signalling and communication facilities, service facilities and electric railway power supply facilities, or install other facilities on them without the approval of the railway transport organ.

Where a high-voltage line is to be stretched over overhead contact lines or signalling and communication lines, the prescribed height shall be maintained and safety measures taken.

No person may develop underground resources within the prescribed distance around the track.

The railway transport organ shall carry out the maintenance and servicing of rolling stock in a planned manner to ensure the normal operation of rolling stock. In this case, institutions, enterprises and organizations that use dedicated and circulating rolling stock shall provide in good time the materials and funds needed for the repair of rolling stock.

The structure of rolling stock may not be changed without the approval of the central railway transport guidance organ.

Institutions, enterprises, organizations and citizens shall handle rolling stock with care and shall not damage it.

Article 59 (Checking and maintenance of tracks)

Section titled “Article 59 (Checking and maintenance of tracks)”

The railway transport organ, the local organ of power and the relevant institutions, enterprises and organizations shall fix management sections and regularly check, maintain and service tracks so that there is no impediment to train operation.

Lespedeza, turf and the like shall be planted around the railway embankment so that the railway embankment is not washed away, and it shall always be kept clean.

Article 60 (Management of containers and transport fittings)

Section titled “Article 60 (Management of containers and transport fittings)”

The railway transport organ, the cargo-owning institutions, enterprises and organizations, and citizens shall manage containers and transport fittings well and observe the established rules in their use.

Containers and transport fittings may not be used for other purposes.

Article 61 (Education on railway protection)

Section titled “Article 61 (Education on railway protection)”

The railway transport organ, the local organ of power and the relevant institution shall conduct education work in various forms and by various methods so that the people cherish the railway and consciously observe railway discipline.

Article 62 (Railway restoration in natural disasters)

Section titled “Article 62 (Railway restoration in natural disasters)”

Where railway restoration work arises from such events as natural disasters, institutions, enterprises and organizations are required to mobilize the necessary labour force, equipment and materials in accordance with the requirements of the relevant institution.

Chapter 7. Guidance and control of railway sector work

Section titled “Chapter 7. Guidance and control of railway sector work”

Article 63 (Guidance of railway sector work)

Section titled “Article 63 (Guidance of railway sector work)”

Guidance of railway sector work shall be exercised by the central railway transport guidance organ under the unified guidance of the Cabinet.

The central railway transport guidance organ shall properly establish the guidance system for railway sector work and regularly take charge of and guide the work.

Article 64 (Supervision and control of railway sector work)

Section titled “Article 64 (Supervision and control of railway sector work)”

Supervision and control of railway sector work shall be exercised by the railway transport guidance organ and the relevant supervision and control organ.

The railway transport guidance organ and the relevant supervision and control organ shall strengthen supervision and control over policy implementation in the railway sector.

Article 65 (Penalty for breach of contract and wagon demurrage charge)

Section titled “Article 65 (Penalty for breach of contract and wagon demurrage charge)”

Institutions, enterprises and organizations that have violated a freight transport contract or a materials supply contract shall be charged a penalty for breach of contract.

Institutions, enterprises and organizations that have exceeded the wagon dwell time and have not returned wagons in good time shall be charged a wagon demurrage charge.

Article 66 (Restoration to the original state and compensation for damage)

Section titled “Article 66 (Restoration to the original state and compensation for damage)”

Where railway rolling stock or railway facilities have been damaged, or property damage has been caused through a freight accident, or damage has been caused by failing to comply with the requirement of the railway transport organ to mobilize dedicated and circulating rolling stock, liability for restoration to the original state or for compensation for damage shall be imposed on the institutions, enterprises and organizations responsible and on individual citizens.

In the following cases, the relevant institutions, enterprises, organizations and citizens shall be fined:

  1. For a unit that has not returned empty containers to the owner even after 48 hours have passed: 200,000 to 1,500,000 won
  2. For a unit that has not packaged freight according to the prescribed standards or has not loaded it as prescribed: 100,000 to 500,000 won
  3. Where passengers have been inconvenienced by failure to properly provide the lighting, water supply and heating needed in passenger coaches: 100,000 to 800,000 won for the unit concerned; 1,000 to 10,000 won for railway employees
  4. For a citizen who has walked along tracks or crossed tracks at a place other than a level crossing: 1,000 to 10,000 won
  5. For a citizen who has violated the rules on railway travel and on the use of passenger trains, such as by boarding a passenger coach without a ticket or with a prohibited item: 1,000 to 100,000 won

In the following cases, the use of wagons shall be suspended:

  1. Where the wagon dwell time has been exceeded by 96 hours or more
  2. Where performance of the freight transport contract has been delayed by 48 hours or more
  3. Where the maintenance and servicing of railway rolling stock has not been properly carried out, the materials needed for maintenance and servicing and for repair have not been provided in good time, or the structure of rolling stock has been changed without approval
  4. Where a facility that may damage wagons has been installed
  5. Where foreign rolling stock or through-service wagons have been used without the agreement of the central railway transport guidance organ, or have not been returned in good time
  6. Where wagons in operation are held in excess of the holding standard
  7. Where the prescribed railway fares or charges have not been properly paid
  8. Where the rules on wagon use have otherwise been violated

In the following cases, the person responsible shall be given, according to the circumstances, the penalty of warning or stern warning, or the penalty of unpaid labour or labour education of not more than three months:

  1. Where railway transport organization and command have been carried out irresponsibly, such as by failing to draw up the train formation plan properly, failing to draw up the train timetable accurately, altering it at will, failing to carry out the make-up of trains as prescribed, running trains contrary to the train timetable, demanding or organizing irrational transport, or failing to observe the requirements of concentrated transport, container transport and joint transport
  2. Where the installation of railway protection facilities has been carried out irresponsibly, such as by failing to install railway markers and high-voltage line safety netting as prescribed, failing to provide safety facilities in railway station yards and around tracks as prescribed, failing to install protective railings, protective wire netting and the like in major track sections, or failing to install safety facilities where a road passes under a railway bridge
  3. Where the protection of railway facilities has been carried out irresponsibly, such as by failing to carry out retaining wall works, landslide prevention works and drainage works at dangerous places, failing to take measures to prevent electrolytic corrosion, carrying out the checking, maintenance and repair of railway operating facilities irresponsibly, building in the railway protection zone buildings or facilities unrelated to railway operation, or connecting a dedicated siding to the railway main line
  4. Where the rules on train operational handling have been violated, such as by violating the train handling, train driving or train inspection regulations, drinking alcohol, sleeping or leaving the place of duty during working hours
  5. Where freight loading has not been carried out as prescribed, such as by loading cargo onto wagons unevenly, loading it so that it protrudes beyond the rolling stock gauge, or loading it in excess of the loading capacity, in violation of the freight transport regulations
  6. Where the rules on the repair and inspection of railway rolling stock have been violated, such as by failing to set up a rolling stock repair base, failing to observe process requirements and technical regulations in the repair of rolling stock, altering the structure of rolling stock without approval, or assessing defective rolling stock as passed
  7. Where the rules on track management have been violated, such as by failing to carry out track inspection rounds, track maintenance, track watch and track patrols properly
  8. Where the reinforcement of track structures, works to protect railway facilities or the installation of safety facilities has not been carried out properly, or a track that has not undergone completion inspection has been operated
  9. Where the rules on the maintenance of railway operating facilities have been violated, such as by failing to carry out the maintenance of points and signal interlocking track occupancy devices properly, or failing to carry out the checking and maintenance of power supply facilities as prescribed
  10. Where the rules on track protection have been violated, such as by walking along tracks, crossing them at places other than level crossings, riding on self-made wheeled vehicles, grazing livestock in the track protection zone, building facilities in it, digging up track ballast, sleeping on tracks, newly making or removing a level crossing or installing barriers without approval
  11. Where the rules on wagon use have been violated, such as by allocating rolling stock to a unit that has not concluded a railway rolling stock use contract, damaging rolling stock, failing to undergo technical inspection, failing to load and unload cargo in good time, failing to pay the wagon use fee in good time, failing to comply with the wagon return days, or using rolling stock as a warehouse
  12. Where foreign rolling stock and through-service wagons have been used without the agreement of the central railway transport guidance organ, or have not been returned within the prescribed period
  13. Where the unitary railway dispatch command has been interfered with or disobeyed
  14. Where various facilities, including railway markers, signalling and communication facilities, service facilities and electric railway power supply facilities, have been damaged or destroyed
  15. Where trees that may impede train operation have not been transplanted in good time
  16. Where tasks of mobilizing labour force, funds and materials unrelated to railway work have been recklessly assigned to the railway transport sector, or railway employees have been mobilized for other work unrelated to railway sector work

Where an act under items 1 to 16 of the preceding paragraph is serious, the penalty of unpaid labour or labour education of not less than three months, or the penalty of demotion, dismissal or removal from post shall be given.

Where an act in violation of this Law amounts to a crime, criminal liability shall be imposed on the person responsible in accordance with the relevant article of the Criminal Law.

English translations by NK Law are licensed under CC BY-SA 4.0.Copyright and reuse