Law of the Democratic People's Republic of Korea on Railway Freight Transport
Edition dated 29 October 2021. August 2024 NIS compilation, vol. 1, pp. 1090–1097
Adopted on 29 October Juche 110 (2021) by Decree No. 767 of the Standing Committee of the Supreme People’s Assembly
Source · Republic of Korea National Intelligence Service, Compilation of North Korean Laws (북한법령집), August 2024, vol. 1, pp. 1090–1097.
The first draft of this translation was produced with AI assistance.
Chapter 1. Fundamentals of the Law on Railway Freight Transport
Section titled “Chapter 1. Fundamentals of the Law on Railway Freight Transport”Article 1 (Mission of the Law on Railway Freight Transport)
Section titled “Article 1 (Mission of the Law on Railway Freight Transport)”The Law of the Democratic People’s Republic of Korea on Railway Freight Transport contributes to fully meeting the growing transport demand of the national economy by strictly establishing the system and order in railway freight transport.
Article 2 (Definition of terms)
Section titled “Article 2 (Definition of terms)”In this Law:
- “Railway freight” means cargo carried by train.
- “Railway freight transport” means transport that carries cargo by train.
- “Railway freight transport plan” means the national economic plan containing the quantity of cargo that the railway transport organ must transport by train in a prescribed period.
- “Railway freight transport contract” means a contract concluded between the railway transport organ and the cargo owner, the content of which is to carry cargo to a prescribed place.
- “Railway freight transport bill” means a document that guarantees the receipt of the cargo by the railway transport organ, the content of the transport contract, the right to claim the cargo, and the freight rate and charges incurred in transporting railway freight.
- “Dangerous freight” means cargo, such as radioactive substances, toxic substances and explosive substances, that may have a negative effect on people, the environment, the rolling stock and facilities of the railway, and other cargo.
- “Oversize freight transport” means transport of cargo in which a single cargo’s weight, length, width or height exceeds a prescribed limit.
Article 3 (Principle of developing railway freight transport)
Section titled “Article 3 (Principle of developing railway freight transport)”It is the consistent policy of the State to develop railway freight transport continuously.
The State shall ensure that railway freight transport is developed by increasing investment in the railway freight transport sector.
Article 4 (Principle of establishing the monolithic dispatch command system)
Section titled “Article 4 (Principle of establishing the monolithic dispatch command system)”Establishing the monolithic dispatch command system is an important guarantee for raising freight transport capacity.
The State shall ensure that the monolithic dispatch command system, which moves in a unified way under the command of the dispatcher, is strictly established in railway freight transport.
Article 5 (Principle of ensuring speed and accuracy of railway freight transport)
Section titled “Article 5 (Principle of ensuring speed and accuracy of railway freight transport)”Ensuring speed and accuracy in railway freight transport is an important requirement for raising railway freight transport capacity.
The State shall ensure that railway freight transport is speedy and accurate by adopting advanced science and technology and improving the organization and command of transport.
Article 6 (Principle of exchange and cooperation)
Section titled “Article 6 (Principle of exchange and cooperation)”The State shall develop exchange and cooperation with other countries and international organizations in the field of railway freight transport.
Article 7 (Relationship with other laws and regulations)
Section titled “Article 7 (Relationship with other laws and regulations)”Matters relating to railway freight transport that are not regulated by this Law shall be governed by the relevant laws and regulations.
Chapter 2. Railway freight transport plan and contract
Section titled “Chapter 2. Railway freight transport plan and contract”Article 8 (Keeping track of railway freight transport demand)
Section titled “Article 8 (Keeping track of railway freight transport demand)”The railway transport organ shall accurately keep track of the railway freight transport demand raised by institutions, enterprises and organizations before drawing up the annual railway freight transport plan.
Institutions, enterprises and organizations shall provide in good time the data required by the railway transport organ for keeping track of railway freight transport demand, such as the commodity name and quantity of the freight to be transported by rail, the dispatching station and the arrival station, the transport conditions and the transport period.
Article 9 (Drawing up the railway freight transport plan)
Section titled “Article 9 (Drawing up the railway freight transport plan)”The central railway transport guidance organ, on the basis of the railway freight transport demand it has kept track of, shall draw up a draft railway freight transport plan on the principle of fully meeting that demand, and then submit it to the central planning guidance organ.
The central planning guidance organ shall examine the draft railway freight transport plan submitted by the central railway transport guidance organ, draw up a draft annual railway freight transport plan divided by quarter, incorporating State requirements, and obtain the approval of the relevant institution.
Article 10 (Handing down the railway freight transport plan)
Section titled “Article 10 (Handing down the railway freight transport plan)”The central planning guidance organ shall hand down the approved railway freight transport plan in good time to the central railway transport guidance organ and the relevant institutions, enterprises and organizations (hereinafter referred to as “cargo-owner institutions”).
The central railway transport guidance organ shall break down the railway freight transport plan handed down by the central planning guidance organ by month and send it down to the relevant railway transport organs.
Article 11 (Dovetailing the railway freight transport plan)
Section titled “Article 11 (Dovetailing the railway freight transport plan)”The railway transport organ shall organize the dovetailing of railway freight transport with cargo-owner institutions in accordance with the railway freight transport plan handed down by the central railway transport guidance organ.
Article 12 (Prohibition of altering the railway freight transport plan)
Section titled “Article 12 (Prohibition of altering the railway freight transport plan)”An approved railway freight transport plan may not be altered.
Where the central railway transport guidance organ intends to alter the railway freight transport plan owing to unavoidable circumstances, it shall submit a document stating the reason for the alteration to the central planning guidance organ and obtain approval.
Article 13 (Parties to the railway freight transport contract)
Section titled “Article 13 (Parties to the railway freight transport contract)”The parties to a railway freight transport contract may be the railway transport organ and the cargo-owner institution.
The railway transport organ and the cargo-owner institution shall conclude a railway freight transport contract on the basis of the railway freight transport plan.
A contract shall also be concluded where additional railway freight transport arises under a State measure.
Article 14 (Drawing up the railway freight transport contract document)
Section titled “Article 14 (Drawing up the railway freight transport contract document)”The railway freight transport contract document shall be drawn up by the cargo-owner institution that has been handed down the railway freight transport plan.
The railway freight transport contract document shall state in detail the necessary content, such as the commodity name, condition and quantity of the freight to be transported, the dispatching station and the arrival station, the names of the sending cargo owner and the receiving cargo owner, the transport period, the freight rate, and the rights and obligations of the contracting parties.
Article 15 (Period for concluding the railway freight transport contract)
Section titled “Article 15 (Period for concluding the railway freight transport contract)”The railway transport organ and the cargo-owner institution shall conclude the railway freight transport contract within 30 days from the date on which the railway freight transport plan was handed down.
Article 16 (Suspension of contract performance due to force majeure)
Section titled “Article 16 (Suspension of contract performance due to force majeure)”Where the railway transport organ and the cargo-owner institution cannot provide railway freight transport or the freight owing to force majeure, they may suspend performance of the contract for a certain period. In this case, the party that has suspended performance of the contract shall immediately notify the other side of it.
Suspension of performance of a contract owing to force majeure shall not constitute a breach of contract.
Article 17 (Performance of a suspended contract)
Section titled “Article 17 (Performance of a suspended contract)”Where the force majeure has ceased, the railway transport organ and the cargo-owner institution shall continue performance of the contract. In this case, the consent of the other party shall be obtained.
Article 18 (Alteration of the railway freight transport contract)
Section titled “Article 18 (Alteration of the railway freight transport contract)”Where a cargo-owner institution intends to alter the railway freight transport contract, it shall prepare a contract alteration application document and reach agreement with the relevant railway transport organ.
The relevant railway transport organ may alter the railway freight transport contract where there is no impediment to railway freight transport.
Article 19 (Liability for breach of the railway freight transport contract)
Section titled “Article 19 (Liability for breach of the railway freight transport contract)”A party that has not performed an obligation under the railway freight transport contract, or has performed it in a manner not conforming to the contract conditions, shall pay the penalty for breach of contract as provided in the contract or compensate for the damage caused.
Chapter 3. Cargo owner of railway freight transport
Section titled “Chapter 3. Cargo owner of railway freight transport”Article 20 (Provision of railway freight)
Section titled “Article 20 (Provision of railway freight)”The cargo-owner institution shall provide in good time the freight to be transported in accordance with the railway freight transport contract.
Freight to be transported by rail is divided, according to its quantity and form, into wagon-load consignments, small consignments, baggage and odd-lot consignments.
The procedures and methods for bringing freight to a station or handling freight at a station shall be as prescribed by the railway transport organ.
Article 21 (Packing of railway freight)
Section titled “Article 21 (Packing of railway freight)”The cargo-owner institution shall pack transported freight, excluding bulk freight, according to the prescribed standard and submit the cargo dispatch form to the railway transport organ.
A cargo owner label or a cargo tag shall be attached to baggage and odd-lot consignments transported as railway freight, and the prescribed mark shall be put on cargo that requires care in handling.
Article 22 (Provision of loading accessories)
Section titled “Article 22 (Provision of loading accessories)”Unless otherwise provided in the contract, loading accessories, including tarpaulins, chains and ropes, shall be provided by the cargo-owner institution. However, loading accessories that the railway transport organ is to produce and supply shall be provided by the railway transport organ.
The railway transport organ shall register the loading accessories received from the cargo-owner institution and use them only for transporting the freight of the cargo-owner institution concerned.
Article 23 (Loading and unloading of freight)
Section titled “Article 23 (Loading and unloading of freight)”Unless separately provided in the contract, freight shall be loaded and unloaded by the cargo-owner institution.
Freight shall be loaded in conformity with the prescribed standard.
The place and time for loading and unloading freight shall be fixed by the railway transport organ.
Article 24 (Confirmation of loaded freight)
Section titled “Article 24 (Confirmation of loaded freight)”The cargo-owner institution shall hand over freight to the relevant railway transport organ sealed or loaded.
The railway transport organ shall confirm, together with the cargo-owner institution, the packing condition and quantity of the loaded freight.
Article 25 (Receipt of arrived freight)
Section titled “Article 25 (Receipt of arrived freight)”Upon receiving notice of the arrival of freight from the railway transport organ, the cargo-owner institution shall receive it in good time. In this case, it shall accurately confirm the condition of the freight with the railway transport organ.
Article 26 (Drawing up the freight accident record)
Section titled “Article 26 (Drawing up the freight accident record)”Where the seal or packing condition of the freight received has changed, where damage has occurred to the freight, or where any other matter requiring the limits of responsibility to be determined has arisen, the cargo-owner institution shall inspect together with the railway transport organ and draw up a record.
Where the railway transport organ refuses without good reason to draw up the accident record, it shall be liable for the accident.
Article 27 (Compensation for damage from a freight accident)
Section titled “Article 27 (Compensation for damage from a freight accident)”Where there is an abnormality in the freight received, the cargo-owner institution may demand that the railway transport organ compensate for the damage. In this case, it shall submit a written claim for compensation for the damage to the railway transport organ.
Article 28 (Liability of the cargo-owner institution)
Section titled “Article 28 (Liability of the cargo-owner institution)”In the following cases, the cargo-owner institution is liable for the freight accident:
- Where the freight has not been packed according to the established packing standard
- Where the content of the freight has been concealed or falsely stated
- Where there is no abnormality in the seal condition of the freight, or the cargo has been escorted by an escort
- Where the damage has occurred owing to force majeure or the physical and chemical action of the freight itself
- Where the damage has occurred through shrinkage to the certain degree provided by law or contract, or has occurred through any other fault of the cargo-owner institution
Article 29 (Imposition of the wagon demurrage charge)
Section titled “Article 29 (Imposition of the wagon demurrage charge)”In the following cases, the cargo-owner institution shall pay the wagon demurrage charge:
- Where wagons have been kept waiting through failure to load and unload freight within the period provided in the contract
- Where more wagons than the freight to be transported have been requested and kept waiting empty
- Where the quality or commodity name did not conform to the content stated in the contract, and the receiving institution has not taken delivery and has sent the cargo back
- Where, in addition, wagons have been kept waiting longer than the prescribed time owing to the fault of the cargo owner
Article 30 (Freight rate and charges for freight transport)
Section titled “Article 30 (Freight rate and charges for freight transport)”The cargo-owner institution shall pay to the railway transport organ the freight rate and charges fixed under the railway freight transport contract.
Chapter 4. Carrier of railway freight
Section titled “Chapter 4. Carrier of railway freight”Article 31 (Provision of locomotives and wagons)
Section titled “Article 31 (Provision of locomotives and wagons)”The railway transport organ shall provide locomotives and wagons in accordance with the freight transport contract.
Locomotives and wagons shall suit the transport distance, transport quantity and characteristics of the cargo, and their safety shall be guaranteed.
Article 32 (Issue of the freight transport bill)
Section titled “Article 32 (Issue of the freight transport bill)”Where the railway transport organ has received freight, it shall issue a freight transport bill, such as a freight notice, a delivery slip for baggage and odd-lot consignments, or a postal item waybill.
Article 33 (Effect of the railway freight transport bill)
Section titled “Article 33 (Effect of the railway freight transport bill)”The railway transport organ shall confirm the condition of the freight received from the cargo-owner institution and the seal, or the outward condition of enclosed cargo, and state it accurately in the railway freight transport bill.
When the railway freight transport bill has been issued, the freight stated in the bill shall be deemed to have been received by the railway transport organ.
Article 34 (Alteration of railway freight transport)
Section titled “Article 34 (Alteration of railway freight transport)”Where the cargo-owner institution, before dispatching the freight, intends to retrieve the freight or to alter the dispatching station, the arrival station, the commodity name or the cargo-owner institution, it shall submit a freight transport alteration application document to the railway transport organ.
The railway transport organ may approve the alteration of transport after examining the reason for altering freight transport, where there is no impediment to the freight transport plan.
Article 35 (Prohibition of irrational transport)
Section titled “Article 35 (Prohibition of irrational transport)”The central planning guidance organ and the central railway transport guidance organ shall eliminate irrational transport, such as counter-flow transport, repeated transport and short-distance transport, by thoroughly organizing the drawing up of the transport plan and the organization and command of transport.
Article 36 (Urgent freight transport)
Section titled “Article 36 (Urgent freight transport)”Where urgent transport arises under a State measure, the central railway transport guidance organ shall give priority to transporting it. In this case, institutions, enterprises and organizations that operate dedicated locomotives and wagons shall obey the transport organization and command of the central railway transport guidance organ.
Article 37 (Concentrated transport)
Section titled “Article 37 (Concentrated transport)”Where a large quantity of freight must be transported in a short period under the railway freight transport plan, the railway transport organ shall conclude a concentrated transport contract with the cargo-owner institution and organize concentrated freight transport.
The cargo-owner institution shall provide the freight and carry out loading and unloading in good time so that there is no impediment to concentrated transport.
Article 38 (Dangerous freight transport)
Section titled “Article 38 (Dangerous freight transport)”A cargo-owner institution that intends to transport dangerous freight by rail shall submit data relating to the freight to the railway transport organ.
The procedures and methods relating to the transport of dangerous freight shall be as separately prescribed.
Article 39 (Oversize freight transport)
Section titled “Article 39 (Oversize freight transport)”A cargo-owner institution that intends to transport oversize freight shall submit a freight transport application document to the railway transport organ.
Upon receiving an application for oversize freight transport from the cargo-owner institution, the railway transport organ shall examine matters relating to oversize freight transport, including the size and weight of the cargo, the type of wagon and the method of loading and unloading, and agree the transport conditions with the cargo-owner institution.
Article 40 (Liability of the railway transport organ)
Section titled “Article 40 (Liability of the railway transport organ)”The railway transport organ is liable for accidents occurring from the time it receives cargo from the cargo-owner institution until it hands it over at the place of arrival. However, it is not liable for accidents due to the grounds in Article 28 of this Law.
Article 41 (Payment of the late-delivery compensation payment)
Section titled “Article 41 (Payment of the late-delivery compensation payment)”Where freight is later than the prescribed transport period, the railway transport organ shall pay the cargo-owner institution a late-delivery compensation payment equal to 3% of the cargo freight rate for each day of delay.
The late-delivery compensation payment may not exceed 50% of the cargo freight rate.
Where cargo has arrived late owing to force majeure or the fault of the cargo-owner institution, the late-delivery compensation payment need not be paid.
Chapter 5. Guidance and control of railway freight transport work
Section titled “Chapter 5. Guidance and control of railway freight transport work”Article 42 (Guidance organ for railway freight transport work)
Section titled “Article 42 (Guidance organ for railway freight transport work)”Guidance of railway freight transport work shall be exercised by the central railway transport guidance organ under the unified guidance of the Cabinet.
The central railway transport guidance organ shall regularly take charge of and guide railway freight transport work.
Article 43 (Supervision and control organ for railway freight transport work)
Section titled “Article 43 (Supervision and control organ for railway freight transport work)”Supervision and control of railway freight transport shall be exercised by the central railway transport guidance organ and the relevant supervision and control organ.
The central railway transport guidance organ and the relevant supervision and control organ shall strictly supervise and control railway freight transport.
Article 44 (Settlement of disputes)
Section titled “Article 44 (Settlement of disputes)”Disputes arising in connection with railway freight transport shall be settled between the parties by consultation.
Where they cannot be settled by consultation, they shall be settled by arbitration procedure.
Article 45 (Seizure and confiscation of railway rolling stock)
Section titled “Article 45 (Seizure and confiscation of railway rolling stock)”In the following cases, locomotives and wagons used by institutions, enterprises and organizations shall be seized or confiscated in accordance with the relevant laws and regulations:
- Where State-controlled goods have been illegally transported
- Where they have been used for illegal trading activity
- Where, on the ground that an institution, enterprise, organization or individual purchased or repaired the wagon, it has been lent to another institution, enterprise or organization for selfish purposes without the agreement of the central railway transport guidance organ, or freight not included in the plan has been loaded on it
- Where wagon numbers have been forged and used, or wagons have been used without being registered
Article 46 (Penalty of a fine)
Section titled “Article 46 (Penalty of a fine)”In the following cases, institutions, enterprises and organizations shall be fined 100,000 to 1,500,000 won, and individual citizens 5,000 to 100,000 won:
- Where the quantity or condition of the freight to be transported has not been accurately stated in the contract document, impeding transport
- Where the arrival station has not been accurately stated in the contract document, resulting in wrong transport
- Where the transport plan or contract has been arbitrarily altered or cancelled, causing confusion in freight transport
- Where the monolithic dispatch command has been impeded
- Where contracted freight has not been provided in good time
- Where the dovetailing of railway freight transport has not been properly organized
- Where wagons suited to the characteristics of the freight have not been provided, causing the freight to be lost or damaged
- Where storage and management of the freight in the course of transport have not been properly carried out
- Where freight has not been packed according to the prescribed standard, causing damage to other freight
- Where loading accessories suited to the characteristics of the freight have not been provided, impeding freight transport
- Where cargo has not been loaded and unloaded by the fixed time
- Where cargo has not been handed over or received in good time
Article 47 (Penalties of warning, stern warning, unpaid labour, demotion, dismissal and removal from post)
Section titled “Article 47 (Penalties of warning, stern warning, unpaid labour, demotion, dismissal and removal from post)”In the following cases, the penalty of warning or stern warning, or the penalty of unpaid labour of not more than three months, shall be imposed on the person responsible:
- Where, without good reason, locomotives or wagons have not been mobilized for urgent freight transport
- Where materials or funds necessary for repairing faulty railway rolling stock have not been provided
- Where the railway freight transport plan has been drawn up irresponsibly
- Where the railway freight transport contract has been concluded irresponsibly
- Where freight transport has been impeded through failure to prepare properly for railway freight transport
- Where railway freight transport has not been carried out in accordance with the established rules
- Where unreasonable demands contrary to the railway freight transport plan or contract have been made, causing confusion in freight transport
- Where confusion has been caused in the work through failure to thoroughly organize and command railway freight transport
- Where freight or wagons necessary for urgent transport have not been provided in good time, or have not been loaded and unloaded
- Where an accident has been caused by violating the procedures for handling and transporting dangerous freight
Where the circumstances of an act in violation of items 1 to 10 of the preceding paragraph are grave, the penalty of unpaid labour of not less than three months, or the penalty of demotion, dismissal or removal from post, shall be given.
Article 48 (Criminal liability)
Section titled “Article 48 (Criminal liability)”Where an act in violation of this Law amounts to a crime, criminal liability shall be imposed on the person responsible in accordance with the relevant article of the Criminal Law.
English translations by NK Law are licensed under CC BY-SA 4.0.Copyright and reuse
Contact info@nklaw.org